  • Membekal, Menghantar, Memasang Dan Mengujilari Talian Rangkaian Wireless (WiFi) Fasa 2 Di Kolej Kediaman Kristal, UiTM Shah Alam
  • Unshielded Twisted Pair (UTP) Cabling Node End-to-End
  • UTP Cabling Node End-to-End_Fasa2_Kolej Kediaman Kristal,Hal Ehwal Pelajar
  • 44 Unit

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. PROJECT REQUIREMENT -
I.

The scope of this project is to deliver, install and test, and commission the UTP cabling end-to-end from the user's workstation to the patch panel.

Ya

Tidak
II.

The tenderer shall ensure all existing network equipment/component/cabling is functioning before and after project implementation. The tenderer shall be responsible for any damage that occurs.

Ya

Tidak
III.

The tenderer must ensure that all UTP cabling end-to-end installations are done by an experienced network technician.

Ya

Tidak
IV.

The tenderer must ensure that the number of UTP cabling installations is sufficient according to the requirements of the UITM.

Ya

Tidak
V.

The tenderer needs to assign at least ONE (1) supervisor with Structured Cabling Certified to monitor the cabling works. The tenderer needs to attach the certificate to Dokumen Teknikal.

** PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE

Ya

Tidak
VI.

The tenderer shall submit an installation report for each node completed to UiTM for approval.

Ya

Tidak
VII.

The tenderer shall prepare a complete and comprehensive commissioning report in the form of hardcopy and softcopy after delivery, installation, and testing to ensure the item and accompanying software or the whole package has adhered to the satisfaction of UNIVERSITI TEKNOLOGI MARA before the final acceptance.

Ya

Tidak
VIII.

The comprehensive commissioning report must include the User Acceptance Test (UAT). The tenderer must also include other additional documents as proof if requested by UiTM.

Ya

Tidak
2. UTP CABLING REQUIREMENT
-
I.

The intra-building UTP cabling is required to provide network nodes with end-to-end solutions from the faceplate to the patch panel/access switch.

Ya

Tidak
II. The UTP-based cabling system shall have a 250 MHz Channel Bandwidth over a maximum distance of 100 meters (328 ft) and a positive channel Attenuation-to- Power Sum Crosstalk Ratio (PSACR) at 250 MHz.
Ya

Tidak
III. The UTP-based cabling system shall use matched components from a single manufacturer, and the cabling system shall be certified to deliver system performance over the lifetime of the applications for which the cabling system was originally designed to support.

Please attach the Authorized Letter (LoA) from the Principal / Distributor.

**PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE
Ya

Tidak
IV. All components used in the UTP-based cabling system shall have a period of at least 25 years Extended Product and Application Warranty from the date of installation against defects in materials and/or workmanship.

Please attach the letter of warranty (LoW) from the Principal / Distributor.

**PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE
Ya

Tidak
V. The UTP cabling shall include all necessary items for a complete installation such as a proper trunking and conduit, patch cords, cross-connect cables, cable guides, RJ45 modular jack, and other accessories required to connect specified end-stations (faceplate) to the patch panel.
Ya

Tidak
VI. All horizontal cabling shall be at least of Category 6 UTP cable or above and must comply with EIA/TIA recommended standard.
Ya

Tidak
VII. Tenderer shall ensure UTP cable can workable with existing infra in UiTM
Ya

Tidak
VIII. Adequate numbers of UTP patch panels shall be provided and must be equipped with a modular jack for the UTP cables termination in the proposed rack.
Ya

Tidak
IX.

All proposed UTP cables must be terminated into RJ-45 outlets contained in faceplates and UTP patch panel. Each faceplate may consist of one or more RJ45 outlets depending on UiTM's requirement.

Ya

Tidak
X.

The tenderer must ensure UTP cable follows the standard specification electrical material approval list by JKR.

**Please attach the material approval list by JKR.

Ya

Tidak
XI.

The tenderer must ensure the product is a new or latest product and the product is not an OEM product.

Ya

Tidak
XII.

The tenderer shall ensure the UTP-based cabling system shall support at least 23AWG cable.

Ya

Tidak
XIII.

The tenderer shall ensure UTP cable supply must support jacket material Low Smoke Zero Halogen (LSZH).

Ya

Tidak
3. UTP CABLE LABELING -
I. The tenderer shall ensure all cable-ends must be labeled and the label must be easily read, long-lasting, and waterproof. Tenderer should label at panel, switch, face-plate, cables end, and etc
Ya

Tidak
4. TECHNICAL/OPERATING MANUAL, ENGINEERING SERVICES, AND OTHER ACCESSORIES -
I. The tenderer shall provide a user operating/technical manual for UiTM referral.
Ya

Tidak
II. All other related software, systems, material, components, cabling and other accessories which are required to ensure full operation and integration with new or existing equipment of the item must be provided by the tenderer.
Ya

Tidak
5. CATALOGUES / BROCHURES -
I. All related catalogs / brochures shall be provided.
Ya

Tidak
6. WARRANTY -
I.

Twenty (25) years of extended product and application warranty maintenance support from principle or distributor consists of equipment part replacement WHICH covers end-to-end copper cabling, outlets, and jacks within the horizontal cabling of a Cat5e, Cat6, or Cat6A structured cabling system which has been tested and certified.

Ya

Tidak
II.

The tenderer must submit to UiTM the certificate / any proof that shows UiTM is entitle for 25 years Extended Product and Application Warranty upon project handover

Ya

Tidak
III.

The tenderer shall be responsible for the installation, test-run, and commissioning of the equipment and accompanying software to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance. All costs on the installation, commissioning and test run shall be borne by the tenderer during the warranty period.

Ya

Tidak
IV.

Maintenance support is needed during and after the warranty period. Tenderers must provide details of addresses of locations of after-sales service centers that shall be responsible for maintenance work for these items during the warranty period.

Ya

Tidak
V.

Free support through fax, email, telephone must be provided during the warranty period.

Ya

Tidak
VI.

A maximum of 4 hours response time to attend to problem call on breakdown of equipment or component is to abide by the tenderer.

Ya

Tidak
7. PROJECT DELIVERY PERIOD
-
I. The delivery period must be within 8 weeks after the tenderer has received the Offer Letter.
Ya

Tidak
II. If there is a delay in project delivery, the tenderer must apply for an extension at least 1 month before the delivery period ends.
Ya

Tidak
8.

IMPORTANT STATEMENT TO TENDERER

-
I.

Any documents presented or submitted by the tenderer in this Dokumen Teknikal MUST NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.

Ya

Tidak