ADS-SHR-DOC-SPECTECH
  • UiTM/B1/PER/SHR/B/1124/0074
  • Membekal, Menghantar, Memasang Dan Mengujilari Talian Rangkaian Wireless (WiFi) Fasa 2 Di Kolej Kediaman Kristal, UiTM Shah Alam
  • Blank Panel
  • Blank Panel_Fasa2_Kolej Kediaman Kristal, Hal Ehwal Pelajar
  • 4 Unit

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1.
PROJECT REQUIREMENT
-
I.
The tenderer must ensure that an experienced network engineer does blank panel installation.
Ya

Tidak
II.
Tenderer should make additions of the items if there is any insufficient without any charges to UiTM.
Ya

Tidak
2.
PRODUCT REQUIREMENT
-
I.
The Blank Panel shall be made of aluminum or better.
Ya

Tidak
II.
The Blank panel shall be 1U rack space in height.
Ya

Tidak
III.
The Blank panel shall be 19-inch wide.
Ya

Tidak
IV.
The Blank Panel shall be compatible with the 19-inch equipment racks, cabinets, or wall mount brackets.
Ya

Tidak
V.
The Blank Panel shall come with nut and screw for easy installation.
Ya

Tidak
3.
CATALOGUE AND BROCHURES
-
I.
Tenderer shall provide all related catalogue/brochure.
Ya

Tidak
4.
DELIVERY PERIOD
-
I.
Delivery period must be within 8 weeks after tenderer has received the Offer Letter.
Ya

Tidak
II.
If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.
Ya

Tidak
5. IMPORTANT STATEMENT TO TENDERER -
I. Any documents presented or submitted by the tenderer in this Dokumen Teknikal MUST NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READBLE.
Ya

Tidak