/ep
Maklumat Spesifikasi belum lengkap diisi.Tekan Ya untuk teruskan.
Maklumat Item
Spesifikasi Teknikal
ADS-SHR-DOC-SPECTECH
No. Perolehan
UiTM/B1/PER/SHR/B/1124/0074
Butiran Tawaran
Membekal, Menghantar, Memasang Dan Mengujilari Talian Rangkaian Wireless (WiFi) Fasa 2 Di Kolej Kediaman Kristal, UiTM Shah Alam
Nama Barangan
Management Ring
Tajuk Spesifikasi Barangan
Management Ring_Fasa2_Kolej Kediaman Kristal, Hal Ehwal Pelajar
Kuantiti
4 Unit
Maklumat Spesifikasi Teknikal
Bil.
Keterangan
Calit
Tawaran/Catatan
1.
PROJECT REQUIREMENT
-
I.
The tenderer
must
ensure that a professional engineer does all installation Management Ring.
Ya
Tidak
II.
The tenderer should make additions of the item if there is any insufficient without any charges to UiTM.
Ya
Tidak
2.
PRODUCT REQUIREMENT
-
I.
The Management Ring shall be made of aluminum or better.
Ya
Tidak
II.
The Management Ring shall be 1U rack space in height.
Ya
Tidak
III.
The Management Ring shall be 19-inch wide.
Ya
Tidak
IV.
The Management Ring shall be compatible with the 19-inch equipment racks, cabinets, or wall mount brackets.
Ya
Tidak
V.
The Management Ring shall come with nut and screw for easy installation.
Ya
Tidak
VI.
The Management Ring MUST be a new product and had been in the market for less than 18 months.
Ya
Tidak
3.
CATALOGUE AND BROCHURES
-
I.
Tenderer shall provide all related catalogue/brochure.
Ya
Tidak
4.
DELIVERY PERIOD
-
I.
Delivery period must be within 8
weeks
after tenderer has received the Offer Letter.
Ya
Tidak
II.
If there is a delay in project delivery, Tenderer must apply for extension at least
1 month
before the delivery period ends.
Ya
Tidak
5.
IMPORTANT STATEMENT TO TENDERER
-
I. Any documents presented or submitted by the tenderer in this
Dokumen Teknika
l
MUST NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
Ya
Tidak
Loading...