/ep
Maklumat Spesifikasi belum lengkap diisi.Tekan Ya untuk teruskan.
Maklumat Item
Spesifikasi Teknikal
ADS-SHR-DOC-SPECTECH
No. Perolehan
UiTM/B1/PER/SHR/B/1124/0074
Butiran Tawaran
Membekal, Menghantar, Memasang Dan Mengujilari Talian Rangkaian Wireless (WiFi) Fasa 2 Di Kolej Kediaman Kristal, UiTM Shah Alam
Nama Barangan
Network Rack 12U
Tajuk Spesifikasi Barangan
Network Rack 12U_Fasa2_Kolej Kediaman Kristal, Hal Ehwal Pelajar
Kuantiti
1 Unit
Maklumat Spesifikasi Teknikal
Bil.
Keterangan
Calit
Tawaran/Catatan
1.
PROJECT REQUIREMENT
-
I. The Network Rack shall be lockable and the vendor must provide the key to the UiTM Staff upon project handover.
Ya
Tidak
II. The Network Rack must be a perforated wall mount cabinet and shall have a 13Amp Power Point Channel Complete Socket minimum four gang.
Ya
Tidak
III. Tenderer
must
ensure all network rack installation done by experience network technician
Ya
Tidak
2.
PRODUCT REQUIREMENT
-
I.
The Network Rack MUST be in minimum
12U height.
Ya
Tidak
II.
The Network Rack shall have
maximum mounting depth 29.1 inc or 740 mm and minimum mounting depth 5.5 inch or 140 mm.
Ya
Tidak
III. The network rack must be a genuine product.
Ya
Tidak
IV.
The Network Rack MUST be a new product and if it's an old product, tenderer have to make sure it's the latest model.
Ya
Tidak
V.
The Network Rack shall include basic accessories cooling system such as fan at top of rack.
Ya
Tidak
VI.
The Network Rack shall be removable and lockable side panels for easy maintenance work.
Ya
Tidak
3.
CERTIFICATION
-
I.
The network rack shall meet UL60950; RoHS; CE standard.
Ya
Tidak
II.
The network rack shall meet UL60950; RoHS; CE standard.
Ya
Tidak
III. The Network Rack shall meet the approvals EIA/ECA-310-E
Ya
Tidak
4.
CATALOGUE/BROCHURES
-
I.
Tenderers must provide the following catalogues/ brochures/ technical specification manuals for the proposed network rack.
Ya
Tidak
5.
DELIVERY PERIOD
-
I.
Delivery period must be within 8
weeks
after tenderer has received the Offer Letter.
Ya
Tidak
II.
If there is a delay in project delivery, Tenderer must apply for extension at least
1 month
before the delivery period ends.
Ya
Tidak
6.
WARRANTY
-
I.
One (1) year warranty.
Ya
Tidak
7.
IMPORTANT STATEMENT TO TENDERER
-
I. Any documents presented or submitted by the tenderer in this
Dokumen Teknika
l
MUST NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE
Ya
Tidak
Loading...