  • Membekal, Menghantar, Memasang Dan Mengujilari Talian Rangkaian Wireless (WiFi) Fasa 2 Di Kolej Kediaman Kristal, UiTM Shah Alam
  • Fiber Single Mode
  • Fiber Cabling 6 Core Single Mode_Fasa2_Kolej Kediaman Kristal, Hal Ehwal Pelajar
  • 100.00 Meter

Maklumat Spesifikasi Teknikal

  
KeteranganCalitTawaran/Catatan
1. PROJECT REQUIREMENT
-
I.

The scope of this project is to deliver, install, and test on-site for the 6 Core Outdoor Single Mode Fiber Cabling for backbone uplink at UiTM

Ya

Tidak
II.

The tenderer needs to extend the cable distance if there is any shortage during the installation without cost to UiTM

Ya

Tidak
III.

The tenderer must ensure that an experienced network technician does all fiber cabling installations.

Ya

Tidak
A )

The tenderer needs to assign at least ONE (1) supervisor with Structured Cabling Certified to monitor the cabling works. The tenderer needs to attach the certificate to Dokumen Teknikal.

** PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE

Ya

Tidak
IV.

The tenderer should ensure all existing network equipment/component/cabling is functioning before and after project implementation. The tenderer shall be responsible for any damage that occurs.

Ya

Tidak
V.

The tenderer shall prepare a complete and comprehensive commissioning report in the form of hardcopy and softcopy after delivery, installation, and testing to ensure the item and accompanying software or the whole package has adhered to the satisfaction of UNIVERSITI TEKNOLOGI MARA before the final acceptance.

Ya

Tidak
VI.

The comprehensive commissioning report must include the User Acceptance Test (UAT). The tenderer must also include other additional documents as proof if requested by UiTM.

Ya

Tidak
VII. The installation location will be determined by uitm from time to time and the tenderer shall be ready to carry out the installation work when the local order is issued.
Ya

Tidak
VIII. It is the tenderer's initiative to acquire the exact length for fiber installation. Please check and confirm the actual length during the tender site visit. The tenderer is also required to make sure whether the fiber way (i.e mainhole) or trunking is available for proper fiber installation and will need to propose a suitable fiber way.