|
1. PROJECT REQUIREMENT
|
-
|
|
|
I. The scope of this project is to deliver, install, and test on-site for the fiber panel at the location
specified by UiTM
|
Ya Tidak
|
|
|
A ) The tenderer needs to install a Fiber Tray Module 6 port slot to the existing fiber tray at Level 2, Kolej Kristal. Please refer to UiTM staff for details.
|
Ya Tidak
|
|
|
II. The tenderer needs to propose the optimum specification for the equipment to function and integrate well with the existing system. Should any component that needs to be added shall be proposed by the tenderer.
|
Ya Tidak
|
|
|
III. The tenderer must ensure the availability, operability, reliability, and functionality of the supplied item components to function properly.
|
Ya Tidak
|
|
|
IV. All other related material, components, and accessories that are required to ensure full operation and integration with new or existing equipment of the fiber panel must be provided by the tenderer.
|
Ya Tidak
|
|
|
V. The tenderer must make sure all works are done properly without any damage to the existing infra/equipment. The tenderer shall be responsible for any damage that occurs.
|
Ya Tidak
|
|
|
VI. The tenderer must ensure that an experienced network technician does all fiber panel installations.
|
Ya Tidak
|
|
|
VII. The installation location will be determined by UiTM from time to time and the tenderer shall be ready to carry out the installation work when the local order is issued.
|
Ya Tidak
|
|
|
2. PRODUCT REQUIREMENT
|
-
|
|
|
I. The tenderer shall supply fiber panels in 1U of rack space.
|
Ya Tidak
|
|
|
II. The fiber panel shall support at least 6 Core fibers with SC Connector.
|
Ya Tidak
|
|
|
III. The fiber panel must conform to EIA/TIA recommended standard.
|
Ya Tidak
|
|
|
IV. The fiber panel shall use matched components from a single manufacturer, and the cabling system shall certify to deliver system performance over the lifetime of the applications for which the cabling system was originally designed to support.
|
Ya Tidak
|
|
|
V. The tenderer must provide a genuine product. The tenderer must be supported back-to-back by a principal (manufacturer) to provide maintenance services for the equipment supplied. Please attach a Letter of Authorization (LOA) from the Distributors/Principal.
** PLEASE DO NOT DISCLOSE COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO THE COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC)
|
Ya Tidak
|
|
|
VI. The Fiber panel shall support pullout drawer enables ease of access to the fiber.
|
Ya Tidak
|
|
|
VII. The Fiber Panel shall support wide a range of fiber optic cabling management accessories, including fiber management clip, splice cassettes, cable grounding kits, and cable entry gland.
|
Ya Tidak
|
|
|
VIII. The unused adapter ports in fiber panel shall be covered by port caps.
|
Ya Tidak
|
|
|
IX. The Fiber Panel shall support a complete line of accessories to secure, organize and protect fusion spliced fibers; including splice cassette kits, splice cassette expanders, fusion protection sleeves and protection sleeve holders.
|
Ya Tidak
|
|
|
X. The tenderer must follow the standard specification electrical material approval list by Jabatan Kerja Raya (JKR).
**Please attach the material approval list by JKR.
|
Ya Tidak
|
|
|
3. FIBER CABLE LABELING
|
-
|
|
|
I. The tenderer shall ensure all cable-ends must be labeled and the label must be easily read, long-lasting, and waterproof. Tenderer should label at panel, switch, face-plate, cables end, and etc
|
Ya Tidak
|
|
|
4. TECHNICAL/OPERATING MANUAL, ENGINEERING SERVICES, AND OTHER ACCESSORIES
|
-
|
|
|
I. The tenderer shall provide a user operating/technical manual for UiTM referral.
|
Ya Tidak
|
|
|
II. All other related software, systems, material, components, cabling and other accessories which are required to ensure full operation and integration with new or existing equipment of the item must be provided by the tenderer.
|
Ya Tidak
|
|
|
5. CATALOGUES / BROCHURES
|
-
|
|
|
I. All related catalogs / brochures shall be provided.
|
Ya Tidak
|
|
|
6. WARRANTY AND SUPPORT
|
-
|
|
|
I. The tenderer shall ensure the fiber panel comes with at least 1 (ONE) year warranty from the manufacturer/distributor.
|
Ya Tidak
|
|
|
II. The tenderer shall be responsible for the installation, test-run, and commissioning of the equipment and accompanying software to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance. All costs on the installation, commissioning and test run shall be borne by the tenderer during the warranty period.
|
Ya Tidak
|
|
|
III. Maintenance support is needed during and after the warranty period. Tenderers must provide details of addresses of locations of after-sales service centers that shall be responsible for maintenance work for these items during the warranty period.
|
Ya Tidak
|
|
|
IV. Free support through fax, email, telephone must be provided during the warranty period.
|
Ya Tidak
|
|
|
V. A maximum of 4 hours response time to attend to problem call on breakdown of equipment or component is to abide by the tenderer.
|
Ya Tidak
|
|
|
7. PROJECT DELIVERY PERIOD
|
-
|
|
|
I. The delivery period must be within 8 weeks after the tenderer has received the Offer Letter.
|
Ya Tidak
|
|
|
II. If there is a delay in project delivery, the tenderer must apply for an extension at least 1 month before the delivery period ends.
|
Ya Tidak
|
|
|
8. IMPORTANT STATEMENT TO TENDERER
|
-
|
|
|
I. Any documents presented or submitted by the tenderer in this Dokumen Teknikal MUST NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
|
Ya Tidak
|
|