1. PRODUCT REQUIREMENT
|
-
|
|
|
I. The Fiber Patch cord must equal or exceed performance requirements specified by the TIA/EIA structured cabling standards.
|
Ya Tidak
|
|
|
II. The fiber patch cord must support at least a 2-meter length single-mode fiber.
|
Ya Tidak
|
|
|
III. The fiber patch cord must be labeled end to end, and the label must be easily read, lasting, and waterproof.
|
Ya Tidak
|
|
|
A ) Tenderer shall propose to UiTM the standard labeling scheme to ensure all label are standardize for all equipment supply to this project.
|
Ya Tidak
|
|
|
IV. The fiber patch cord must come with the precise number of connector types which is SC-LC pigtail.
|
Ya Tidak
|
|
|
V. The fiber patch cord must support at least 0.30 dB Maximum insertion loss.
|
Ya Tidak
|
|
|
VI. The fiber patch cord must provide at least 50 dB minimum return loss
|
Ya Tidak
|
|
|
VII. The fiber patch cord must follow the standard specification electrical material approval list by JKR. **Please attach the material approval list by JKR.
|
Ya Tidak
|
|
|
VIII. The fiber patch cord must be factory terminated and tested.
|
Ya Tidak
|
|
|
IX. The fiber patch cord must support a higher signal-to-noise ratio, providing better reliability and higher data rates.
|
Ya Tidak
|
|
|
X. The tenderer MUST provide a genuine product. The tenderer must be supported back-to-back by a principal (manufacturer) to provide maintenance services for equipment supplied. The tenderer should attach a Letter of Authorization (LOA) from Distributors/ Principal.
** PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
|
Ya Tidak
|
|
|
2. CATALOGUES/BROCHURES
|
-
|
|
|
I. All related catalogue/brochure shall be provided.
|
Ya Tidak
|
|
|
3. WARRANTY
|
-
|
|
|
I. Item shall have at least ONE (1) year warranty from the tenderer or manufacturer.
Please attach Letter of Warranty (LoW) from Principle.
** PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
|
Ya Tidak
|
|
|
II. The warranty period will begin after the installation and testing is complete.
|
Ya Tidak
|
|
|
4. DELIVERY PERIOD
|
-
|
|
|
I. Delivery period must be within 8 weeks after tenderer has received the Offer Letter.
|
Ya Tidak
|
|
|
II. If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.
|
Ya Tidak
|
|
|
5. PROJECT REQUIREMENT
|
-
|
|
|
I. The tenderer needs to propose the optimum specification for the equipment to function and integrate well with the existing system. Should any component that need to be added shall be proposed by the tenderer.
|
Ya Tidak
|
|
|
II. The tenderer must ensure the availability, operability, reliability and functionality of the supplied item components to function properly
|
Ya Tidak
|
|
|
III. All other related material, components, cabling and accessories which are required to ensure full operation and integration with new or existing equipment of the item must be provided by the tenderer.
|
Ya Tidak
|
|
|
IV. The tenderer must make sure all works are done properly without any damage to the existing infra/equipment. The tenderer shall be responsible for any damage that occurs.
|
Ya Tidak
|
|
|
V. The tenderer shall verify the exact fiber patch cord needed and if there is additional panel required, the tenderer must complete it with no additional cost to UiTM.
|
Ya Tidak
|
|
|
VI. Tenderer must ensure all Fiber Patch Cord installations to be done by an experienced network technician.
|
Ya Tidak
|
|
|
6. IMPORTANT STATEMENT TO TENDERER
|
-
|
|
|
I. Any documents presented or submitted by the tenderer in this Dokumen Teknikal MUST NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY?S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
|
Ya Tidak
|
|