ADS-SHR-DOC-SPECTECH
  • UiTM/B1/PER/SHR/B/1124/0074
  • Membekal, Menghantar, Memasang Dan Mengujilari Talian Rangkaian Wireless (WiFi) Fasa 2 Di Kolej Kediaman Kristal, UiTM Shah Alam
  • Access Network Switch / Workgroup Switch
  • Access Switch 24 Port 10/100/1000 PoE+ (410W)_1528FP_Fasa2_Kolej Kediaman Kristal, Hal Ehwal Pelajar
  • 2 Unit

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1.

IMPORTANT STATEMENT TO TENDERER

-
I.

Any documents presented or submitted by the tenderer in this Dokumen Teknikal MUST NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOG, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT READABLE.

Ya

Tidak
2.

PROJECT REQUIREMENT

-
I.

This project's scope is to deliver, install, and test the on-site network access switch to Kolej Kediaman, UiTM.

Ya

Tidak
II.

The tenderer must ensure the availability, operability, reliability, and functionality of the supplied item components to function properly.

Ya

Tidak
III.

The tenderer must provide all other related materials, components, cabling, and accessories required to ensure the entire operation and integration with new or existing equipment.

Ya

Tidak
IV.

The tenderer must make sure all works are done properly without any damage to the existing infra/equipment and shall be responsible for any damage that occurs.

Ya

Tidak
V.

The tenderer needs to propose the optimum specification for the equipment to function and integrate well with the existing systems. Should any component that needs to be addressed shall be proposed by the tenderer.

Ya

Tidak
VI.

The tenderer must ensure all network access point installation and configuration are done by professional network engineers. Note: Please attach at least ONE(1) Network Engineer Certification and Co-curriculum Vitae (CV). **PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.

Ya

Tidak
VII.

The tenderer shall prepare a complete and comprehensive commissioning report in the form of hardcopy and softcopy after delivery, installation, and testing to ensure the item and accompanying software or the whole package has adhered to the satisfaction of UNIVERSITI TEKNOLOGI MARA before the final acceptance.

Ya

Tidak
VIII.

The comprehensive commissioning report must include the User Acceptance Test (UAT) and the tenderer must also include other additional documents as proof if requested by UiTM.

Ya

Tidak
IX.

The tenderer must affix a sticker on every network access switch with details such as company name/logo, project number, contact number, and device hostname. The sticker must be durable, long-lasting, and easy to read.

Ya

Tidak
X.

The tenderer must propose and provide genuine products. The refurbished and OEM product is not accepted. Please attach the Letter of Authorization (LOA) from Principle. **PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.

Ya

Tidak
XI.

Network access switch configuration will be done by UiTM but if there is any issue, the tenderer needs to help so that good service quality is achieved.

Ya

Tidak
XII.

All proposed software and hardware must complete a working model with genuine copy educational licensing and discounts

Ya

Tidak
XIII.

The tenderer must document all network access switch configurations, management IP address, part number, model, and details locations in hard copy and must be submitted to UiTM.

Ya

Tidak
XIV.

The tenderer must supply an equivalent or better switch model from the same product family if there is any issue with the proposed model.

Ya

Tidak
3.

PRODUCT REQUIREMENT

-
I. The access switch support at least 24 port with 10/100/1000 Base-T GbE with 410W budget POE+ ports.
Ya

Tidak
II. The access switch support at least 4 port with 10-Gigabit SFP+ uplink ports.
Ya

Tidak
III. The access switch support at least full-featured layer 2+ switching.
Ya

Tidak
IV. The access switch supports a switching capacity of at least 128Gbps.
Ya

Tidak
V. The access switch supports at least 512MB SDRAM and 128MB Flash Memory.
Ya

Tidak
VI. The access switch supports at least 802.3at/af for PoE-capable ports.
Ya

Tidak
VII. The access switch supports LED Indicators for easy monitoring.
Ya

Tidak
VIII. The access switch support multiple ip interface with at least 20 IPv6 address.
Ya

Tidak
IX. The access switch supports an ARP table maximum of 192 ARP entries.
Ya

Tidak
X. The access switch supports at least 192 static ARP entries.
Ya

Tidak
XI. The access switch supports a maximum of 63 entries for the IPv4 static route and 21 entries for the IPv6 static route.
Ya

Tidak
XII. The access switch supports various network management via cloud, skykey, ezMaster, or local web GUI
Ya

Tidak
XIII. The access switch supports at least 16K MAC address table and 10K jumbo frame.
Ya

Tidak
XIV. The access switch supports a multicast group maximum of 256 groups.
Ya

Tidak
XV. The access switch supports a port-security maximum of 256 entries.
Ya

Tidak
XVI. The access switch supports the Access Control List (ACL) and SNMP v1/v2c/v3.
Ya

Tidak
XVII. The access switch supports standard layer 2 features such as: spanning tree, loopback detection, multicast filtering, snooping, link aggregation, voice VLAN, telnet, and SSH.
Ya

Tidak
4.

TECHNICAL/OPERATING MANUAL, ENGINEERING SERVICES AND OTHER ACCESSORIES

-
I.

User operating/technical manual shall be provided by the tenderer.

Ya

Tidak
II.

The tenderer shall provide all necessary adapters, cables, and other accessories.

Ya

Tidak
5.

CATALOGUE / BROCHURES

-
I.

The tenderer shall provide all related catalogs/brochures.

Ya

Tidak
6.

INSTALLATION, TESTING AND COMMISSIONING

-
I.

The tenderer is required to perform the installation, testing & commissioning on-site for the supplied item at the location specified by UiTM.

Ya

Tidak
II.

The comprehensive commissioning report must include the User Acceptance Test and Delivery Order. The tenderer must also include other additional documents as proof if requested by UiTM.

Ya

Tidak
III.

The tenderer must provide training for the configuration, operation, and maintenance of the system which must cover OS & System administration during the installation process for UiTM’s personnel if needed.

Ya

Tidak
7.

WARRANTY AND SUPPORT

-
I. TWO (2) years of maintenance support consisting of equipment faulty Replacement (Next Business Day) and software upgrade shall be provided.

Note: Please provide Letter of Warranty (LoW) from Principle.
  
  **PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE
Ya

Tidak
II.

The tenderer shall be responsible for the installation, test run, and commissioning of the equipment and accompanying software to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance. All costs on the installation, commissioning, and test run shall be borne by the tenderer during the warranty period

Ya

Tidak
III.

Maintenance support is needed during and after the warranty period. Tenderers must provide details of addresses of locations of after-sales service centers that shall be responsible for maintenance work for these items during the warranty period.

Ya

Tidak
IV.

Free support through fax, email, and telephone must be provided during the warranty period.

Ya

Tidak
V.

Response time to attend to a problem call breakdown of equipment or component is MAXIMUM 4 hours.

Ya

Tidak
8.

DELIVERY PERIOD

-
I. The delivery period must be within 8 weeks after the tenderer has received the Offer Letter.
Ya

Tidak
II.

If there is a delay in project delivery, the tenderer must apply for an extension at least 1 month before the delivery period ends.

Ya

Tidak