ADS-SHR-DOC-SPECTECH
  • UiTM/D2/PER/SHR/B/1124/0003
  • Membekal, menghantar, memasang, mengujilari dan menyelenggara 21 unit komputer berspesifikasi tinggi dan 2 unit komputer (workstation) berspesifikasi tinggi kegunaan di Big Data Lab UiTM Cawangan Kelantan Kampus Kota Bharu
  • Desktop PC Set / Set Komputer
  • UiTMKB 2024 - BDL HIGH END PC
  • 21 Unit

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. GENERAL REQUIREMENT -
I. The proposed equipment must have a local services centre near to UiTM Cawangan Kelantan Kampus Kota Bharu to provide a full technical support and maintenance.
Ya

Tidak
II. Tenderer MUST provide the detailed and complete bill of quantities of software, hardware and training proposed including third-party software, firmware, operating systems and support services in this tender exercise. Total number of item : 21 units
Ya

Tidak
III. The required machines must be a latest brand new production
Ya

Tidak
IV. Tenderer must provide User Acceptance Test (UAT) form every report request done by UiTM
Ya

Tidak
2. GENERAL SPECIFICATION -
I. Processor : Intel® Core™ i7 14700 vPro® (33 MB cache, 20 cores, 28 threads, up to 5.4 GHz Turbo)
Ya

Tidak
II. System Memory : 32 GB: 2 x 16 GB, DDR5
Ya

Tidak
III. Graphics : AMD Radeon™ RX 6500 4GB GDDR6,Full Height,2xDP
Ya

Tidak
IV. Storage : M.2 2230 512GB PCIe NVMe SSD Class 35
Ya

Tidak
V. Display Monitor
-
A ) Full HD (1920 × 1080)
Ya

Tidak
B ) minimum 1 x HDMI (HDCP 1.4)
Ya

Tidak
C ) 24 inch or bigger
Ya

Tidak
VI. Operating system : Windows 11 Pro, English
Ya

Tidak
VII. Network support :
Ya

Tidak
A ) Wired (RJ45)
Ya

Tidak
B ) Wireless: Intel® Wi-Fi 6E AX211, 2x2, 802.11ax, Bluetooth® wireless card, external antenna
Ya

Tidak
VIII. Chassis Options : Tower with 500W Platinum Power Supply
Ya

Tidak
3. I/O PORTS -
I. Front ports
-
A ) Global headset / Universal Audio Jack
Ya

Tidak
B ) 1x USB 2.0 Port
Ya

Tidak
C ) USB 2.0 port with PowerShare technology
Ya

Tidak
D ) 1x USB 3.2 Gen 2x2 Type-C Port
Ya

Tidak
E ) 1x USB 3.2 Gen 2 Port
Ya

Tidak
II. Rear ports
-
A ) Line-out/Line-in Audio Port
Ya

Tidak
B ) Serial Port (optional)
-
C ) 3x DisplayPort 1.4a Ports (each up to 4096 x 2304 @60Hz)
Ya

Tidak
D ) HDMI 2.1: up to 4096 x 2160 @60Hz
Ya

Tidak
E ) USB 3.2 Gen 2 Type-A Port
Ya

Tidak
F ) 3x USB 3.2 Gen 1 Type-A Port
Ya

Tidak
G ) 2x USB 2.0 with SmartPower On
Ya

Tidak
H ) 4x Expansion Slots
Ya

Tidak
I ) Power Cord Connector
Ya

Tidak
J ) Power Supply Diagnostic Light
Ya

Tidak
K ) Release Latch
Ya

Tidak
L ) Padlock Ring
Ya

Tidak
M ) RJ-45 Ethernet
Ya

Tidak
4. OTHERS AND ACCESSORIES -
I. Keyboard
Ya

Tidak
II. Mouse
Ya

Tidak
III. Power Cord
Ya

Tidak
IV. Driver
Ya

Tidak
V. Security Cable / Lock
Ya

Tidak
5. WARRANTY AND SUPPORT -
I. Warranty for the equipment is expected to be at least Two (2) year warranty plus one (1) years of EXTENDED WARRANTY.
Ya

Tidak
II. The tenderer should attach a Letter of Warranty (LOW) from Distributors / Principal. This document must be presented in the Dokumen Teknikal.
** PLEASE DO NOT DISCLOSED COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC)
Ya

Tidak
III. The successful tenderer must be supported back to back by principal to provide maintenance services for equipment supplied which under warranty period.
Ya

Tidak
A ) Response time to attend to problem call on breakdown of equipment or component is made (Please take note that UiTM Maximum requirement of 4 hours response time)
Ya

Tidak
B ) Turnover time for repair to be completed, or faulty component (or equipment) to be replaced must be not more than 24 hours.
Ya

Tidak
6. CATALOGUE -
I. Catalogue or Brochure must be attached upon submission of tender documents
Ya

Tidak
II. The successful tenderer must be supported back to back by principal to provide support services for software supplied. The tenderer should attach a Letter of Authorization (LOA) from Distributors / Principal. This document must be presented in the Dokumen Teknikal.
** PLEASE DO NOT DISCLOSED COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC)
Ya

Tidak
A ) Must within 4 weeks after tenderer has received the offer letter
Ya

Tidak
B ) If the project delivery delayed, tenderer must apply permission for extension a least 1 month before the delivery period end
Ya

Tidak
7. DELIVERY -
I. Cost of delivery of the equipment is borne by the tenderer
Ya

Tidak
II. Delivery and installation at site as per instruction from UiTM without incurring any additional
Ya

Tidak
III. Delivery period:
Ya

Tidak
A ) Must within 4 weeks after tenderer has received the offer letter
Ya

Tidak
B ) If the project delivery delayed, tenderer must apply permission for extension a least 1 month before the delivery period end
Ya

Tidak