|
1. GENERAL REQUIREMENT
|
-
|
|
|
I. The proposed equipment must have a local services centre near to UiTM Cawangan Kelantan Kampus Kota Bharu to provide a full technical support and maintenance.
|
Ya Tidak
|
|
|
II. Tenderer MUST provide the detailed and complete bill of quantities of software, hardware and training proposed including third-party software, firmware, operating systems and support services in this tender exercise. Total number of item : 21 units
|
Ya Tidak
|
|
|
III. The required machines must be a latest brand new production
|
Ya Tidak
|
|
|
IV. Tenderer must provide User Acceptance Test (UAT) form every report request done by UiTM
|
Ya Tidak
|
|
|
2. GENERAL SPECIFICATION
|
-
|
|
|
I. Processor : Intel® Core™ i7 14700 vPro® (33 MB cache, 20 cores, 28 threads, up to 5.4 GHz Turbo)
|
Ya Tidak
|
|
|
II. System Memory : 32 GB: 2 x 16 GB, DDR5
|
Ya Tidak
|
|
|
III. Graphics : AMD Radeon™ RX 6500 4GB GDDR6,Full Height,2xDP
|
Ya Tidak
|
|
|
IV. Storage : M.2 2230 512GB PCIe NVMe SSD Class 35
|
Ya Tidak
|
|
|
V. Display Monitor
|
-
|
|
|
A ) Full HD (1920 × 1080)
|
Ya Tidak
|
|
|
B ) minimum 1 x HDMI (HDCP 1.4)
|
Ya Tidak
|
|
|
C ) 24 inch or bigger
|
Ya Tidak
|
|
|
VI. Operating system : Windows 11 Pro, English
|
Ya Tidak
|
|
|
VII. Network support :
|
Ya Tidak
|
|
|
A ) Wired (RJ45)
|
Ya Tidak
|
|
|
B ) Wireless: Intel® Wi-Fi 6E AX211, 2x2, 802.11ax, Bluetooth® wireless card, external antenna
|
Ya Tidak
|
|
|
VIII. Chassis Options : Tower with 500W Platinum Power Supply
|
Ya Tidak
|
|
|
3. I/O PORTS
|
-
|
|
|
I. Front ports
|
-
|
|
|
A ) Global headset / Universal Audio Jack
|
Ya Tidak
|
|
|
B ) 1x USB 2.0 Port
|
Ya Tidak
|
|
|
C ) USB 2.0 port with PowerShare technology
|
Ya Tidak
|
|
|
D ) 1x USB 3.2 Gen 2x2 Type-C Port
|
Ya Tidak
|
|
|
E ) 1x USB 3.2 Gen 2 Port
|
Ya Tidak
|
|
|
II. Rear ports
|
-
|
|
|
A ) Line-out/Line-in Audio Port
|
Ya Tidak
|
|
|
B ) Serial Port (optional)
|
-
|
|
|
C ) 3x DisplayPort 1.4a Ports (each up to 4096 x 2304 @60Hz)
|
Ya Tidak
|
|
|
D ) HDMI 2.1: up to 4096 x 2160 @60Hz
|
Ya Tidak
|
|
|
E ) USB 3.2 Gen 2 Type-A Port
|
Ya Tidak
|
|
|
F ) 3x USB 3.2 Gen 1 Type-A Port
|
Ya Tidak
|
|
|
G ) 2x USB 2.0 with SmartPower On
|
Ya Tidak
|
|
|
H ) 4x Expansion Slots
|
Ya Tidak
|
|
|
I ) Power Cord Connector
|
Ya Tidak
|
|
|
J ) Power Supply Diagnostic Light
|
Ya Tidak
|
|
|
K ) Release Latch
|
Ya Tidak
|
|
|
L ) Padlock Ring
|
Ya Tidak
|
|
|
M ) RJ-45 Ethernet
|
Ya Tidak
|
|
|
4. OTHERS AND ACCESSORIES
|
-
|
|
|
I. Keyboard
|
Ya Tidak
|
|
|
II. Mouse
|
Ya Tidak
|
|
|
III. Power Cord
|
Ya Tidak
|
|
|
IV. Driver
|
Ya Tidak
|
|
|
V. Security Cable / Lock
|
Ya Tidak
|
|
|
5. WARRANTY AND SUPPORT
|
-
|
|
|
I. Warranty for the equipment is expected to be at least Two (2) year warranty plus one (1) years of EXTENDED WARRANTY.
|
Ya Tidak
|
|
|
II. The tenderer should attach a Letter of Warranty (LOW) from Distributors / Principal. This document must be presented in the Dokumen Teknikal.
** PLEASE DO NOT DISCLOSED COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC)
|
Ya Tidak
|
|
|
III. The successful tenderer must be supported back to back by principal to provide maintenance services for equipment supplied which under warranty period.
|
Ya Tidak
|
|
|
A ) Response time to attend to problem call on breakdown of equipment or component is made (Please take note that UiTM Maximum requirement of 4 hours response time)
|
Ya Tidak
|
|
|
B ) Turnover time for repair to be completed, or faulty component (or equipment) to be replaced must be not more than 24 hours.
|
Ya Tidak
|
|
|
6. CATALOGUE
|
-
|
|
|
I. Catalogue or Brochure must be attached upon submission of tender documents
|
Ya Tidak
|
|
|
II. The successful tenderer must be supported back to back by principal to provide support services for software supplied. The tenderer should attach a Letter of Authorization (LOA) from Distributors / Principal. This document must be presented in the Dokumen Teknikal.
** PLEASE DO NOT DISCLOSED COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC)
|
Ya Tidak
|
|
|
A ) Must within 4 weeks after tenderer has received the offer letter
|
Ya Tidak
|
|
|
B ) If the project delivery delayed, tenderer must apply permission for extension a least 1 month before the delivery period end
|
Ya Tidak
|
|
|
7. DELIVERY
|
-
|
|
|
I. Cost of delivery of the equipment is borne by the tenderer
|
Ya Tidak
|
|
|
II. Delivery and installation at site as per instruction from UiTM without incurring any additional
|
Ya Tidak
|
|
|
III. Delivery period:
|
Ya Tidak
|
|
|
A ) Must within 4 weeks after tenderer has received the offer letter
|
Ya Tidak
|
|
|
B ) If the project delivery delayed, tenderer must apply permission for extension a least 1 month before the delivery period end
|
Ya Tidak
|
|