ADS-SHR-DOC-SPECTECH
  • UiTM/D2/PER/SHR/B/1124/0003
  • Membekal, menghantar, memasang, mengujilari dan menyelenggara 21 unit komputer berspesifikasi tinggi dan 2 unit komputer (workstation) berspesifikasi tinggi kegunaan di Big Data Lab UiTM Cawangan Kelantan Kampus Kota Bharu
  • Desktop PC Set / Set Komputer
  • UiTMKB 2024 - HIGH END PC
  • 2 Unit

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. GENERAL REQUIREMENT -
I. The proposed equipment must have a local services centre near to UiTM Cawangan Kelantan Kampus Kota Bharu to provide a full technical support and maintenance.
Ya

Tidak
II. Tenderer MUST provide the detailed and complete bill of quantities of software, hardware and training proposed including third-party software, firmware, operating systems and support services in this tender exercise. Total number of item : 2 units
Ya

Tidak
III. The required machines must be a latest brand new production
Ya

Tidak
IV. Tenderer must provide User Acceptance Test (UAT) form every report request done by UiTM
Ya

Tidak
2. GENERAL SPECIFICATION -
I. Processor : Intel® Core™ i7 14700F (20-Core, 61MB Total Cache, 2.1GHz to 5.4GHz w/Turbo Boost Max 3.0)
Ya

Tidak
II. System Memory : 32 GB: 2 x 16 GB, DDR5, 5600 MT/s
Ya

Tidak
III. Graphics : NVIDIA® GeForce RTX™ 4060, 8 GB GDDR6
Ya

Tidak
IV. Storage : 1TB, M.2, PCIe NVMe, SSD
Ya

Tidak
V. Display Monitor 24 inch support :
Ya

Tidak
A ) Full HD (1080p) 1920 x 1080 at 75 Hz
Ya

Tidak
B ) 1 x HDMI , 1 x DisplayPort
Ya

Tidak
VI. Operating system : Windows 11 or latest version
Ya

Tidak
VII. Network support :
Ya

Tidak
A ) Wired (RJ45)
Ya

Tidak
B ) wireless Intel® Killer™ Wi-Fi 6E AX1675, 2x2, 802.11ax, MU-MIMO, Bluetooth® wireless card
Ya

Tidak
VIII. Chassis Options : 1000W Platinum Rated PSU, 240mm Liquid-Cooled CPU & Clear Side Panel
Ya

Tidak
3. I/O PORTS -
I. Front ports
-
A ) Global headset
Ya

Tidak
B ) (2x) USB 3.2 Gen 1 ports
Ya

Tidak
C ) USB 3.2 Gen 1 port with PowerShare technology
Ya

Tidak
D ) USB 3.2 Gen 2 Type-C® with PowerShare technology
Ya

Tidak
II. Rear ports
-
A ) Rear L/R Surround Output
Ya

Tidak
B ) Optical S/PDIF port
Ya

Tidak
C ) Side L/R Surround Output
Ya

Tidak
D ) Audio input/microphone In
Ya

Tidak
E ) Line-Out
Ya

Tidak
F ) USB 3.2 Gen 2 Type-C® (10Gbps)
Ya

Tidak
G ) USB 3.2 Gen 2x2 Type-C® (20Gbps)
Ya

Tidak
H ) (2x) USB 2.0 Type-A with Smart Power Technology
Ya

Tidak
I ) Coaxial S/PDIF port
Ya

Tidak
J ) Center/Subwoofer Output
Ya

Tidak
K ) Line In
Ya

Tidak
L ) (2x) USB 2.0 Type-A
Ya

Tidak
M ) (2x) USB 3.2 Gen 1 Type-A (5Gbps)
Ya

Tidak
N ) RJ-45 Killer™ E3100 Gigabit Ethernet
Ya

Tidak
O ) Dual Self-Complementary Antenna (SCA) ports
Ya

Tidak
4. OTHERS AND ACCESSORIES -
I. Keyboard
Ya

Tidak
II. Mouse
Ya

Tidak
III. Power Cord
Ya

Tidak
IV. Driver
Ya

Tidak
5. WARRANTY AND SUPPORT -
I. Warranty for the equipment is expected to be at least Two (2) year warranty plus one (1) years of EXTENDED WARRANTY.
Ya

Tidak
II. The tenderer should attach a Letter of Warranty (LOW) from Distributors / Principal. This document must be presented in the Dokumen Teknikal.
** PLEASE DO NOT DISCLOSED COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC)
Ya

Tidak
III. The successful tenderer must be supported back to back by principal to provide maintenance services for equipment supplied which under warranty period.
Ya

Tidak
A ) Response time to attend to problem call on breakdown of equipment or component is made (Please take note that UiTM Maximum requirement of 4 hours response time)
Ya

Tidak
B ) Turnover time for repair to be completed, or faulty component (or equipment) to be replaced must be not more than 24 hours.
Ya

Tidak
6. CATALOGUE -
I. Catalogue or Brochure must be attached upon submission of tender documents
Ya

Tidak
II. The successful tenderer must be supported back to back by principal to provide support services for software supplied. The tenderer should attach a Letter of Authorization (LOA) from Distributors / Principal. This document must be presented in the Dokumen Teknikal.
** PLEASE DO NOT DISCLOSED COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC)
Ya

Tidak
A ) Must within 4 weeks after tenderer has received the offer letter
Ya

Tidak
B ) If the project delivery delayed, tenderer must apply permission for extension a least 1 month before the delivery period end
Ya

Tidak
7. DELIVERY -
I. Cost of delivery of the equipment is borne by the tenderer
Ya

Tidak
II. Delivery and installation at site as per instruction from UiTM without incurring any additional
Ya

Tidak
III. Delivery period:
Ya

Tidak
A ) Must within 4 weeks after tenderer has received the offer letter
Ya

Tidak
B ) If the project delivery delayed, tenderer must apply permission for extension a least 1 month before the delivery period end
Ya

Tidak