|
1. GENERAL REQUIREMENT
|
-
|
|
|
I. The proposed equipment must have a local services centre near to UiTM Cawangan Kelantan Kampus Kota Bharu to provide a full technical support and maintenance.
|
Ya Tidak
|
|
|
II. Tenderer MUST provide the detailed and complete bill of quantities of software, hardware and training proposed including third-party software, firmware, operating systems and support services in this tender exercise. Total number of item : 2 units
|
Ya Tidak
|
|
|
III. The required machines must be a latest brand new production
|
Ya Tidak
|
|
|
IV. Tenderer must provide User Acceptance Test (UAT) form every report request done by UiTM
|
Ya Tidak
|
|
|
2. GENERAL SPECIFICATION
|
-
|
|
|
I. Processor : Intel® Core™ i7 14700F (20-Core, 61MB Total Cache, 2.1GHz to 5.4GHz w/Turbo Boost Max 3.0)
|
Ya Tidak
|
|
|
II. System Memory : 32 GB: 2 x 16 GB, DDR5, 5600 MT/s
|
Ya Tidak
|
|
|
III. Graphics : NVIDIA® GeForce RTX™ 4060, 8 GB GDDR6
|
Ya Tidak
|
|
|
IV. Storage : 1TB, M.2, PCIe NVMe, SSD
|
Ya Tidak
|
|
|
V. Display Monitor 24 inch support :
|
Ya Tidak
|
|
|
A ) Full HD (1080p) 1920 x 1080 at 75 Hz
|
Ya Tidak
|
|
|
B ) 1 x HDMI , 1 x DisplayPort
|
Ya Tidak
|
|
|
VI. Operating system : Windows 11 or latest version
|
Ya Tidak
|
|
|
VII. Network support :
|
Ya Tidak
|
|
|
A ) Wired (RJ45)
|
Ya Tidak
|
|
|
B ) wireless Intel® Killer™ Wi-Fi 6E AX1675, 2x2, 802.11ax, MU-MIMO, Bluetooth® wireless card
|
Ya Tidak
|
|
|
VIII. Chassis Options : 1000W Platinum Rated PSU, 240mm Liquid-Cooled CPU & Clear Side Panel
|
Ya Tidak
|
|
|
3. I/O PORTS
|
-
|
|
|
I. Front ports
|
-
|
|
|
A ) Global headset
|
Ya Tidak
|
|
|
B ) (2x) USB 3.2 Gen 1 ports
|
Ya Tidak
|
|
|
C ) USB 3.2 Gen 1 port with PowerShare technology
|
Ya Tidak
|
|
|
D ) USB 3.2 Gen 2 Type-C® with PowerShare technology
|
Ya Tidak
|
|
|
II. Rear ports
|
-
|
|
|
A ) Rear L/R Surround Output
|
Ya Tidak
|
|
|
B ) Optical S/PDIF port
|
Ya Tidak
|
|
|
C ) Side L/R Surround Output
|
Ya Tidak
|
|
|
D ) Audio input/microphone In
|
Ya Tidak
|
|
|
E ) Line-Out
|
Ya Tidak
|
|
|
F ) USB 3.2 Gen 2 Type-C® (10Gbps)
|
Ya Tidak
|
|
|
G ) USB 3.2 Gen 2x2 Type-C® (20Gbps)
|
Ya Tidak
|
|
|
H ) (2x) USB 2.0 Type-A with Smart Power Technology
|
Ya Tidak
|
|
|
I ) Coaxial S/PDIF port
|
Ya Tidak
|
|
|
J ) Center/Subwoofer Output
|
Ya Tidak
|
|
|
K ) Line In
|
Ya Tidak
|
|
|
L ) (2x) USB 2.0 Type-A
|
Ya Tidak
|
|
|
M ) (2x) USB 3.2 Gen 1 Type-A (5Gbps)
|
Ya Tidak
|
|
|
N ) RJ-45 Killer™ E3100 Gigabit Ethernet
|
Ya Tidak
|
|
|
O ) Dual Self-Complementary Antenna (SCA) ports
|
Ya Tidak
|
|
|
4. OTHERS AND ACCESSORIES
|
-
|
|
|
I. Keyboard
|
Ya Tidak
|
|
|
II. Mouse
|
Ya Tidak
|
|
|
III. Power Cord
|
Ya Tidak
|
|
|
IV. Driver
|
Ya Tidak
|
|
|
5. WARRANTY AND SUPPORT
|
-
|
|
|
I. Warranty for the equipment is expected to be at least Two (2) year warranty plus one (1) years of EXTENDED WARRANTY.
|
Ya Tidak
|
|
|
II. The tenderer should attach a Letter of Warranty (LOW) from Distributors / Principal. This document must be presented in the Dokumen Teknikal.
** PLEASE DO NOT DISCLOSED COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC)
|
Ya Tidak
|
|
|
III. The successful tenderer must be supported back to back by principal to provide maintenance services for equipment supplied which under warranty period.
|
Ya Tidak
|
|
|
A ) Response time to attend to problem call on breakdown of equipment or component is made (Please take note that UiTM Maximum requirement of 4 hours response time)
|
Ya Tidak
|
|
|
B ) Turnover time for repair to be completed, or faulty component (or equipment) to be replaced must be not more than 24 hours.
|
Ya Tidak
|
|
|
6. CATALOGUE
|
-
|
|
|
I. Catalogue or Brochure must be attached upon submission of tender documents
|
Ya Tidak
|
|
|
II. The successful tenderer must be supported back to back by principal to provide support services for software supplied. The tenderer should attach a Letter of Authorization (LOA) from Distributors / Principal. This document must be presented in the Dokumen Teknikal.
** PLEASE DO NOT DISCLOSED COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC)
|
Ya Tidak
|
|
|
A ) Must within 4 weeks after tenderer has received the offer letter
|
Ya Tidak
|
|
|
B ) If the project delivery delayed, tenderer must apply permission for extension a least 1 month before the delivery period end
|
Ya Tidak
|
|
|
7. DELIVERY
|
-
|
|
|
I. Cost of delivery of the equipment is borne by the tenderer
|
Ya Tidak
|
|
|
II. Delivery and installation at site as per instruction from UiTM without incurring any additional
|
Ya Tidak
|
|
|
III. Delivery period:
|
Ya Tidak
|
|
|
A ) Must within 4 weeks after tenderer has received the offer letter
|
Ya Tidak
|
|
|
B ) If the project delivery delayed, tenderer must apply permission for extension a least 1 month before the delivery period end
|
Ya Tidak
|
|