|
1. EQUIPMENT SPECIFICATION
|
-
|
|
|
I. Location : MAKMAL PEMESINAN TERMAJU
|
Ya Tidak
|
|
|
II. Brand : Please Specify
|
Ya Tidak
|
|
|
III. Model : PBRDG-T3-60KS
|
Ya Tidak
|
|
|
IV. Total Capacity - 60kVA / 60kW
|
Ya Tidak
|
|
|
V. Phase - 3-Phase In / 3-Phase Out
|
Ya Tidak
|
|
|
VI. BATTERY TYPE
|
-
|
|
|
A ) VRLA (MB) Maintenance Free Battery – min 3min backup time based on 53% of UPS capacity.
(Battery Brand: Preferable Minutebank or equivalent and must submission of battery backup calculation table justification)
|
Ya Tidak
|
|
|
VII. BATTERY SPECIFICATION
|
-
|
|
|
A ) Nominal Voltage: 12V
|
Ya Tidak
|
|
|
B ) Internal Resistance (In full charge status): ≈11.6 m Ohm
Standard Terminals: T04
|
Ya Tidak
|
|
|
C ) Designed floating charging service life: 8 years (25°C)
|
Ya Tidak
|
|
|
D ) Certified as meeting the requirements of ISO 9001:2015,ISO 14001-2015, ISO 45001-2018, CE certificate (Please provide Certificate from Principal)
|
Ya Tidak
|
|
|
VIII. INPUT
|
-
|
|
|
A ) Nominal voltage - 3 x 380/400/415VAC (3PH+N)
|
Ya Tidak
|
|
|
B ) Voltage Range - -30% ~ +20%
|
Ya Tidak
|
|
|
C ) Frequency Range - 46Hz ~ 64Hz
|
Ya Tidak
|
|
|
D ) Input Power Factor - 0.99 @ 100% Load
|
Ya Tidak
|
|
|
IX. OUTPUT
|
-
|
|
|
A ) Nominal voltage - 3 x 360/380/400/415VA (3Ph+N)
|
Ya Tidak
|
|
|
B ) Output Power Factor - 1.0
|
Ya Tidak
|
|
|
C ) AC Voltage Regulation - ±1% (Batt. Mode)
|
Ya Tidak
|
|
|
D ) Nominal Frequency - 50Hz ±0.1Hz or 60Hz ±0.1Hz
|
Ya Tidak
|
|
|
E ) Frequency Range (Synchronized) -46Hz ~ 54Hz or 56Hz ~ 64Hz
|
Ya Tidak
|
|
|
F ) Transfer Time - AC mode to Batt. Mode @ Zero
|
Ya Tidak
|
|
|
G ) Inverter to Bypass – Zero
|
Ya Tidak
|
|
|
H ) Waveform - Pure Sinewave
|
Ya Tidak
|
|
|
I ) Overload Capacity - 100 - 110% for 60min, 110-125% for 10min, >150% immediately
|
Ya Tidak
|
|
|
J ) Harmonic Distortion - ≤1% THDv (Linear Load); ≤3% THDv (Non-Linear Load)
|
Ya Tidak
|
|
|
K ) Efficiency - Up to 99% (ECO mode)
|
Ya Tidak
|
|
|
X. BATTERY CHARGER
|
-
|
|
|
A ) Charging Current (Max) - 1.0A - 20.0A (Adjustable)
|
Ya Tidak
|
|
|
B ) Charging Voltage - ± 13.65V x N (N= 16-20)
|
Ya Tidak
|
|
|
C ) Battery Quantity - 32 – 40 pcs (Adjustable)
|
Ya Tidak
|
|
|
XI. STATUS INDICATOR
|
-
|
|
|
A ) LCD Display - 4.3" LCD Touch Screen Colour
LCD Display Panel (UPS Status, Load Level,
Input/Output Voltage, Discharge Timer, UPS Fault)
|
Ya Tidak
|
|
|
B ) Audible Alarm - Battery Mode, Low Battery, Overload, UPS Fault
|
Ya Tidak
|
|
|
XII. COMMUNICATION
|
-
|
|
|
A ) Power Management Software - RP Smart Power Management Software: Supports Windows Family, Linux & MAC
|
Ya Tidak
|
|
|
B ) Interface - RS 232 / USB Port
|
Ya Tidak
|
|
|
C ) SNMP Module - RP DA806 version support for real time dynamic remote monitoring through network connection
|
Ya Tidak
|
|
|
D ) EPO - Yes
|
Ya Tidak
|
|
|
XIII. PHYSICAL
|
-
|
|
|
A ) Operation Environment - 0 - 40°C, <95% non-condensing
|
Ya Tidak
|
|
|
B ) Noise Level - < 70dbB @ 1 meter
|
Ya Tidak
|
|
|
C ) Dimension (DxWxH)mm - 815 x 300 x 1000mm
|
Ya Tidak
|
|
|
D ) Weight - 74 Kgs
|
Ya Tidak
|
|
|
XIV. INTERNATIONAL STANDARD REQUIREMENT
|
-
|
|
|
A ) Safety Requirements:IEC/EN62040-1
|
Ya Tidak
|
|
|
B ) EMI:Conducted Emission: IEC/EN62040-2 (Category C3)
Radiated Emission: IEC/EN62040-2 (Category C3)
|
Ya Tidak
|
|
|
C ) EMS:ESD: IEC/EN 61000-4-2 Level 4
RS: IEC/EN 61000-4-3 Level 4
EFT: IEC/EN 61000-4-4 Level 4
Surge: IEC/EN 61000-4-5 Level 4
CS: IEC/EN 61000-4-6 Level 3
Power Frequency Magnetic Field: IEC/CN 61000-4-8 Level 4
Low Frequency Signals: IEC/EN 61000-2-2
|
Ya Tidak
|
|
|
XV. Cabinet – L1050*D450*H970 x 3tiers
|
Ya Tidak
|
|
|
2. INSTALLATION, TESTING & COMMISSIONING
|
-
|
|
|
I. The tenderer should be responsible for the installation, commissioning and test-run of the equipment to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance.
|
Ya Tidak
|
|
|
II. All other related materials, components and cabling (electrical wiring i.e. from distribution board to machine location, isolator etc) which are not specified but required to ensure full proper operation of the above equipment, must be supplied and all related costs must be borne by the tenderer/supplier.
|
Ya Tidak
|
|
|
III. Commissioning report should be submitted upon successful completion of the work within two (2) weeks.
|
Ya Tidak
|
|
|
3. TRAINING
|
-
|
|
|
I. Basic training UiTM for at least eight (8) personnel. The training should be a minimum of four (4) working days.
|
Ya Tidak
|
|
|
II. The period of training shall be extended until all personnel involved are confident and competent enough to do the running and operation of the equipment.
|
Ya Tidak
|
|
|
III. Areas of training to be covered preferably are:
- Operation of the whole system.
- Maintenance and general care procedures.
- Course materials, syllabus contents and training schedule should be provided in details
|
Ya Tidak
|
|
|
4. AFTER SALES SERVICE
|
-
|
|
|
I. The tenderer shall have technical background and experience in supplying and servicing of the equipment.
|
Ya Tidak
|
|
|
II. A letter of support from the equipment manufacturer to the supplier must be attached.
|
Ya Tidak
|
|
|
III. The installer will be responsible for service/maintenance visits after 6 and 12 months from the date of commissioning
|
Ya Tidak
|
|
|
5. WARRANTY PERIOD
|
-
|
|
|
I. The tenderer must provide at least 1-years warranty for the hardware and 1 years for battery.
|
Ya Tidak
|
|
|
II. 1-Years On-Site Site Warranty and Support inclusive of Battery, Parts & Labour (8x5, Next Business Day) (Important: Please provide supported letter from Principal)
|
Ya Tidak
|
|
|
III. The warranty period must not be less than one (1) year from the date of the complete handling over. The tenderer shall also clearly state the terms of warranty covering the equipment.
|
Ya Tidak
|
|
|
IV. All labour and parts needed during the warranty period shall be borne by the tenderer. Any exclusion shall be clearly specified by the tenderer.
|
Ya Tidak
|
|
|
6. MAINTENANCE
|
-
|
|
|
I. The tenderer is required to deliver and perform installation, design, consultation, provisioning, migration, integration and commissioning work on the proposed solution from the current infrastructure to the proposed solutions. (Important: Please provide drawing/SLD from Principal)
|
Ya Tidak
|
|
|
II. Minimum of 2 times Preventive Maintenance within 1 year. (By certified UPS principal)
|
Ya Tidak
|
|
|
III. Preventive maintenance must include generate UPS health log report and batteries health report and able to obtain the dynamic password by authorized certified engineer/principle.
|
Ya Tidak
|
|
|
IV. Full maintenance support for all items of equipment/software must be available locally. The engineering support shall be provided by competent personnel. The tenderer will have to indicate how they intend to meet these requirements, including naming the facilities available and their location. The maintenance period must not be less than one (1) year from the date of the complete handling over.
|
Ya Tidak
|
|