ADS-SHR-DOC-SPECTECH
  • UiTM/W1/PER/SHR/B/0425/0002
  • CADANGAN MEMBUKA, MEMBEKAL, MEMASANG DAN MENGUJILARI PERALATAN RANGKAIAN DI MAKMAL AUTOCAD BLOK C UITM CAWANGAN SARAWAK KAMPUS SAMARAHAN
  • UTP : UTP Cable
  • 2. UTP CABLE PATCH CORD 2 METER
  • 32 Unit

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. PRODUCT REQUIREMENT -
I. The UTP-based cabling system shall have a 250 MHz Channel Bandwidth over a maximum distance of 100m (328 ft) and a positive channel Attenuation-to- Power Sum Crosstalk Ratio (PSACR) at 250 MHz.
Ya

Tidak
II. The UTP-based cabling system shall use matched components from a single manufacturer, and the cabling system shall be certified to deliver system performance over the lifetime of the applications for which the cabling system was originally designed to support.
Ya

Tidak
III. All horizontal cabling shall be at least of Category 6 UTP cable and must comply with EIA/TIA recommended standard.
Ya

Tidak
IV. All patch cord supplied must be factory terminated.
Ya

Tidak
V. Tenderer must follow the standard specification electrical material approve list by JKR.
Ya

Tidak
VI. All cables must be 2 Meter length.
Ya

Tidak
VII. Tenderer must provide genuine product come from priciple / distributor. Please attach Authorized Letter (LOA) from principle or distributor.** PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE
Ya

Tidak
2. LABELING AND TAGGING -
I. All cable-ends must be labeled and the label must be easily read, lasting and waterproof.
Ya

Tidak
II. Please provide the test result for each network point.
Ya

Tidak
3. TECHNICAL/OPERATING MANUAL, ENGINEERING SERVICES AND OTHER ACCESSORIES
-
I. User operating/technical manual shall be provided.
Ya

Tidak
II. All necessary adapters, cables and other accessories required shall be provided.
Ya

Tidak
4. CATALOGUES/BROCHURES -
I. All related catalogue/brochure shall be provided.
Ya

Tidak
5. DELIVERY PERIOD -
I. Delivery period must be within 18 weeks after tenderer has received the Offer Letter.
Ya

Tidak
II. If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.
Ya

Tidak
6. SUPPORT AND WARRANTY -
I. Twenty (20) years of maintenance support consists of equipment part replacement.
Note: Please provide Letter of Warranty (LoW) from Principle. **PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
Ya

Tidak