ADS-SHR-DOC-SPECTECH
  • UiTM/B1/PER/SHR/B/0525/0019
  • Cadangan Membekal, Menghantar, Memasang, Mengujilari Dan Menyelenggara Peralatan Pengajaran Dan Pembelajaran Debug Station Secara Pakej Untuk Makmal Pengujian Dan Pengukuran Peranti Semikonduktor (Semikonduktor 11.2), Fakulti Kejuruteraan Elektrik, UiTM Shah Alam, Selangor.
  • Power Supply / Switching Power Supply
  • PKE 2025 SEMI Triple output bench DC Power supply (Version 2)
  • 3 Set

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. GENERAL REQUIREMENTS -
I. Vendors must comply with all the requirements specified in this tender document.
Ya

Tidak
II. Vendors must bear all costs of supplying the specified quantity of items to UiTM. Such costs shall include the costs of delivery, installation, commissioning, training, troubleshoot and maintenance work (including parts labour and on-site service) within the specified warranty period
Ya

Tidak
III. Vendors must bear all costs of supplying the specified quantity of items to UiTM. Such costs shall include
the costs of delivery, installation, commissioning, troubleshoot and maintenance work (including parts,
labour and on-site service) within the specified warranty period
The equipment will be distributed in the following Campuses:
1. Electrical Engineering School, College of Engineering, UiTM Shah Alam Selangor x 2 Sets
2. UiTM Penang Branch, Permatang Pauh Campus x 1 Sets
Ya

Tidak
2. SPECIFICATION -
I. GENERAL SPECIFICATIONS
- Number of outputs: 3 independents
- Total power: 90 W
- Ripple and noise: <1 mVrms
- Accuracy: 0.05%+10 mV
- Modern connectivity: USB and LAN (LXI Core)
- Display: Minimum 7-inch-wide video graphics array (WVGA)
Ya

Tidak
II. PERFORMANCE SPECIFICATIONS:
Power output (90 W)
1) DC Output rating (0 to 40ºC)
- Output 1: 0 to 6 V (voltage), 0 to 5 A (current)
- Output 2: 0 to 30 V (voltage), 0 to 1 A (current)
- Output 3: 0 to 30 V (voltage), 0 to 1 A (current)
Ya

Tidak
III. 2) Load regulation ± (% of output + offset)
All 3 outputs
- Voltage: < 0.01% + 2 mV
- Current: < 0.2% + 10 mA
Ya

Tidak
IV. 3) Line regulation ± (% of output + offset)
All 3 outputs
- Voltage: < 0.01% + 2 mV
- Current: < 0.2% + 10 mA
Ya

Tidak
V. 4) Programming accuracy ± (% of output + offset)
- Output 1: 0.1% + 5 mV (voltage), 0.1% + 10 mA (current)
- Output 2 and 3: 0.05% + 10 mV (voltage), 0.2% + 5 mA (current)
Ya

Tidak
VI. 5) Readback accuracy ± (% of output + offset)
- Output 1: 0.1% + 5 mV (voltage), 0.1% + 10 mA (current)
- Output 2 and 3: 0.05% + 10 mV (voltage), 0.2% + 5 mA (current)
Ya

Tidak
VII. 6) Load transient recovery time
All 3 outputs
- Voltage settling band: 15 mV
- Time: < 50 Us
Ya

Tidak
VIII. 7) Readback remote
- Output 1: 0.5 mV (voltage), 1 mA (current)
- Output 2: 1.5 mV (voltage), 0.5 mA (current)
- Output 3: 1.5 mV (voltage), 0.5 mA (current)
Ya

Tidak
IX. 8) Programming front panel
All 3 outputs
-Voltage: 1 mV
- Current: 1 Ma
Ya

Tidak
X. 9) Readback front panel
All 3 outputs
- Voltage: 1 mV
- Current: 1 Ma
Ya

Tidak
XI. 10) Output ripples and noise (20 Hz to 20 MHz)
All 3 outputs
- Normal mode voltage: <1mVrms/5mVpp
- Normal mode current: < 4 mArms
Ya

Tidak
XII. 11) Overvoltage protection (OVP) ± (% of output + offset)
All 3 outputs
Programming accuracy: 0.2% + 0.4V
Ya

Tidak
XIII. 12) Activation time (average time for the output to start to drop after OVP or OCP condition occurs)
- Overvoltage (OVP): < 5 ms
- Overcurrent (OCP): < 5 ms
Ya

Tidak
XIV. 13) Command processing time: < 10 ms
Ya

Tidak
XV. 14) Programming temperature coefficient per ºC (% of output + offset)
- Output 1: 0.0005% +0.1 mV (voltage), 0.0002% +0.05 mV (current)
- Output 2 and 3: 0.002% +0.5 mV (voltage), 0.0001% +0.02 mV (current)
Ya

Tidak
XVI. 15) Readback temperature coefficient per ºC (% of output + offset)
- Output 1: 0.0005% +0.1 mV (voltage), 0.0002% +0.05 mV (current)
- Output 2 and 3: 0.002% +0.5 mV (voltage), 0.0001% +0.02 mV (current)
Ya

Tidak
XVII. 16) Up/down programming settling time to within 1% of the total excursion
All 3 outputs
- Up full load: 80 ms
- Up no load: 80 ms
- Down full load: 60 ms
- Down no lod: 500 ms
Ya

Tidak
XVIII. 17) Others
- Dimensions (HxWxD): 164.7 mm x 313.6 mm x 240.9 mm (6.48 in x 12.35 in x 9.48 in)
- Weight: 9.85 kg
Ya

Tidak
XIX. SUPPLIED ACCESSORIES
- Test leads
- AC power cord, Banana plug, single sheathed to alligator clip
Ya

Tidak
3. CATALOGUES / BROCHURES -
I. Vendors must provide the catalogues / brochures / technical specification manuals with the tender proposal.
Ya

Tidak
II. Original copies catalogue of user, brochure, operational manual and clear technical specification of the equipment must be provided
Ya

Tidak
III. The equipment offered by vendor must be of the latest available model.
Ya

Tidak
4. TRAINING -
I. Tenderers are required to provide training for the use, maintenance and troubleshoot of the equipment to the Technical Staff & Lecture of Electrical Engineering School, College of Engineering, UiTM Shah Alam and all training-related costs are borne by the tenderers.
Ya

Tidak
II. A minimum of one (1) day training for a minimum of one (1) participants covering each module. (Vendors must provide details/syllabus of the training module)
Ya

Tidak
III. Complete training materials and documentation must be provided to all participants
Ya

Tidak
IV. The training MUST be conducted by trainers who are certified by principal. Please attach the trainer's certification that is certified by principal supplier.
Ya

Tidak
V. Certificate of attendance must be provided
Ya

Tidak
VI. Training sessions must be conducted at the following Campuses:
1. School of Electrical Engineering, College of Engineering, UiTM Shah Alam Selangor
2. UiTM Penang Branch, Permatang Pauh Campus
Ya

Tidak
5. WARRANTY AND SUPPORT -
I. Warranty for the equipment is expected to be at least One (1) year warranty.
Ya

Tidak
II. Installation, maintanance, testing and commissioning of the entire system should be completed within (12) week from the delivery date.
Ya

Tidak
III. Vendors must have local service for repair services and provide on call services when required by UiTM
Ya

Tidak
IV. Vendors must provide details of warranty. INCLUDING ALL parts, labour, basic phone support for hardware issue, repairs onsite) Please attach the Letter of Warranty (LOW) from the principle, which states that UiTM is entitled to 3 years of warranty upon project completion
Ya

Tidak
V. Vendors be responsible for the installation, commissioning and test-run of the equipment and accompanying software (if applicable) to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance.
Ya

Tidak
VI. All cost on delivery. installation, commissioning and test run shall be borne by the vendor
Ya

Tidak
VII. The vendors MUST provide a genuine product. The vendors must be supported back-to-back by a principle (manufacturer) to provide maintenance services for equipment supplied. The vendors should attach a Letter of Authorization (LOA) from Distributors/ Principal.
Ya

Tidak
VIII. Free support through fax, email, telephone must be provided during the warranty period
Ya

Tidak
6. OTHER REQUIREMENTS -
I. Note that all other related material, components and cabling, which are required to ensure full operation of the above package must be supplied and borne by vendors
Ya

Tidak