1. GENERAL REQUIREMENT
|
-
|
|
|
I. The proposed equipment must have a local service center near UiTM Sungai Buloh to provide full technical support and maintenance.
|
Ya Tidak
|
|
|
II. Catalog(s) must be attached upon submission of tender documents.
|
Ya Tidak
|
|
|
III. The component listed below must be able to be integrated and work as one system.
|
Ya Tidak
|
|
|
2. BATTERY SYSTEM REQUIREMENT
|
-
|
|
|
I. Nominal Voltage: 12V
|
Ya Tidak
|
|
|
II. Capacity: 7.6Ah
|
Ya Tidak
|
|
|
III. Quantity Battery : 544 Unit
|
Ya Tidak
|
|
|
IV. Dimension +/- 151 x 95 x 65 (L x W x H )mm
|
Ya Tidak
|
|
|
V. Re-arrange load to UPS required
|
Ya Tidak
|
|
|
3. SUPPORT & WARRANTY
|
-
|
|
|
I. Warranty For Equipmentis expected to be at least one (1) year.
|
Ya Tidak
|
|
|
II. Must provide comprehensive and extensive after sales service on labour and overall parts.
|
Ya Tidak
|
|
|
III. Must provide warranty letter direct from local or authorized manufacture or distributor on delivery of the equipment.
|
Ya Tidak
|
|
|
IV. Cost of delivery of the equipment is borne by the supplier
|
Ya Tidak
|
|
|
4. SERVICE
|
-
|
|
|
I. Minumum of 2 times preventive maintenance within 1 years.Preventive maintenance must include generate UPS health log report dan batteries health report and able to obtain the dynamic password by authorized certified engineer/principal.
|
Ya Tidak
|
|
|
5. SCOPE OF WORK
|
-
|
|
|
I. Supplier to provide all material,manpower,instrument and equipment transportation and other nesseceties required for full and complete installation of new UPS batteries.
|
Ya Tidak
|
|
|
II. Supplier will responsible to make good any renovating of hacking work,removal of wall/door required for the installation proces within same day.
|
Ya Tidak
|
|
|
III. supplier must ensure completion of batteries installation and able to poer up within 1 working day from start work.
|
Ya Tidak
|
|
|
IV. Supplier will responsible for the clearliness of technical room upon installation UPS batteries ,disposal of dirts ,debris and any unwanted contruction materials by supplier.
|
Ya Tidak
|
|
|
6. TRAINNING
|
-
|
|
|
I. Supplier are required to provide training for the use,maintenance,troubleshoot and repair of the requirement to the staff UiTM.
|
Ya Tidak
|
|
|
II. Training should be conducted for five (4) persons of staff or more assigned by UiTM.
|
Ya Tidak
|
|
|
III. The duration / time / training syllabus / numbers of participants for the training would be discussed on delivery of the equipment.
|
Ya Tidak
|
|