1. GENERAL SPECIFICATION
|
-
|
|
|
I. Tabletop Heavy-duty Kitchen Mixer with attachment shall be a tabletop-type bakery equipment suitable for mixing dry ingredients, kneading dough and foaming batter.
|
Ya Tidak
|
|
|
2. GENERAL SPECIFICATION AND REQUIREMENT. The (item) should meet the specification and requirement as per below:
|
-
|
|
|
I. Technical specification
|
Ya Tidak
|
|
|
II. Manuals and Documentations
|
Ya Tidak
|
|
|
III. Installation, commissioning and training
|
Ya Tidak
|
|
|
IV. Warranty and others
|
Ya Tidak
|
|
|
3. TECHNICAL SPECIFICATIONS
|
-
|
|
|
I. This equipment should fulfill the following specification.
|
-
|
|
|
A ) Equipment size: Approximately 37 cm x 29 cm x 42 cm (L x W x H).
|
Ya Tidak
|
|
|
B ) Voltage Requirement: 220V-240V - Single phase.
|
Ya Tidak
|
|
|
C ) The equipment should have 10 incremental speeds with direct drive transmission.
|
Ya Tidak
|
|
|
D ) The gears shall be made of steel.
|
Ya Tidak
|
|
|
E ) The equipment shall be constructed with sturdy metal construction.
|
Ya Tidak
|
|
|
II. This equipment should come with:
|
-
|
|
|
A ) Spiral Dough Hook, Flat Beater and Stainless-Steel Wire Whip attachment.
|
Ya Tidak
|
|
|
B ) At least one extra bowl.
|
Ya Tidak
|
|
|
C ) Bowl lifting mechanism.
|
Ya Tidak
|
|
|
4. MANUALS AND DOCUMENTATIONS
|
-
|
|
|
I. The manuals must include details on the background teaching theory, step-by-step operating and cleaning procedures as well as troubleshooting guides.
|
Ya Tidak
|
|
|
II. The equipment must be provided with original, colored copies of the operations and experimental manuals in hard copy (compiled in hard-covered file/s) and soft copy.
|
Ya Tidak
|
|
|
5. INSTALLATION COMMISSIONING AND TRAINING
|
-
|
|
|
I. Installing, testing and commissioning of the entire system should be completed within one month of the delivery date.
|
Ya Tidak
|
|
|
II. Installation and commissioning of the entire system shall be done by the manufacturers qualified and experienced personnel.
|
Ya Tidak
|
|
|
III. Tenderer must provide complete wiring and installation from equipment to power supply outlets.
|
Ya Tidak
|
|
|
IV. The on-site training shall be conducted by the manufacturer's qualified personnel to at least five (5) end user personnel and must include topics on background theory, setup, step by step guide to routine maintenance guide.
|
Ya Tidak
|
|
|
6. WARRANTY AND OTHERS
|
-
|
|
|
I. Tenderer must state the period of warranty which must not be less than 2 calendar year upon the date of handover and the full conditions of warranty.
|
Ya Tidak
|
|
|
II. The tenderer must guarantee the availability of spares and maintenance for the equipment for a minimum of three (3) years.
|
Ya Tidak
|
|
|
III. A complete catalogue and technical data shall be attached with tender submission.
|
Ya Tidak
|
|