ADS-SHR-DOC-SPECTECH
  • UiTM/J3/PER/SHR/B/0625/0002
  • CADANGAN MEMBEKAL, MENGHANTAR, MEMASANG DAN MENGUJILARI PERALATAN DAN MESIN DI BENGKEL DAN MAKMAL FAKULTI KEJURUTERAAN MEKANIKAL CAWANGAN JOHOR KAMPUS PASIR GUDANG.
  • Programmable Logic Controller (PLC)
  • (FKM) Mini Conveyor System for PLC Training Kit
  • 2 Set

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. General Ya

Tidak
I. A sorting conveyor belt system which have 1 loading Bay and 2 sorting station/Bay. The conveyor must be equipt with sensors, DC motor , electro-pneumatic directional control valve, pneumatic cylinder,FRL, Terminal block for input and output and also Power supply if needed.
Ya

Tidak
2. Technical Specification Ya

Tidak
I. Conveyor Dimension
Ya

Tidak
A )
700mm(L)x100mm(W)x150mm(H) (approximately)
the Conveyor must have a base plate
Ya

Tidak
II. Sensor
Ya

Tidak
A ) Capacitive Sensor (1 Unit)
Ya

Tidak
B ) Inductive Sensor (1 Unit)
Ya

Tidak
C ) Photoelectric sensor (1 Unit)
Ya

Tidak
III. Motor
Ya

Tidak
A ) 24Vdc (adjustable speed)
Ya

Tidak
IV. Control System
Ya

Tidak
A ) Double acting cylinder (2 unit)
Ya

Tidak
B ) Directional Control Valve Solenoid actuated (2 unit)
Ya

Tidak
C ) Sorting Tray (3 station)
Ya

Tidak
D ) Terminal Block for Input
Ya

Tidak
E ) Terminal Block for Output
Ya

Tidak
F ) Buzzer
Ya

Tidak
G ) FRL
Ya

Tidak
3. Electrical Specicification Ya

Tidak
I. System powered by 24Vdc
Ya

Tidak
4. Manual & Documentation Ya

Tidak
I. Operational manual shall be provided in original colored hardcopy form as well as softcopy. The hardcopy should be compiled in hard-covered file.
Ya

Tidak
II. The manual must include details on the wiring, technical specification of the equipment and also include with drawing
Ya

Tidak
5. Installation, commissioning and Training Ya

Tidak
I. The tenderer shall be responsible for delivery, installation and commissioning of the equipment.
Ya

Tidak
II. The supplier should provide a training after (with the date is agreed from both supplier and end-user side) installation and commissioning.
Ya

Tidak
III. Installation and commissioning of the entire system shall be done by the manufacturer’s professional and qualified personnel/engineer.
Ya

Tidak
IV. The on-site training conducted by the manufacturer’s qualified engineer to at least five (5) end user/ personnel. The training handouts should be provided on the training day.
Ya

Tidak
6. Training Ya

Tidak
I.
The training shall include:
Hand on and operation for the system that supplied
Ya

Tidak
II. Routine and preventive maintenance of the system.
Ya

Tidak
III. Basic servicing and maintenance.
Ya

Tidak
IV. The training shall be conducted once during commissioning
and the second one will upon end user request.
Ya

Tidak
7. Warranty and After Sales Support Ya

Tidak
I. Warranty for the equipment shall be at least 1 year including parts and labor.
Ya

Tidak
II. The tenderer must guarantee the availability of spare parts for the equipment for a minimum of five (5) years.
Ya

Tidak
III. A complete catalogues and technical data shall be attached with tender submission.
Ya

Tidak
IV. The supplier must demonstrate that it has the proven appropriate setup and capability to provide after-sales service effectively and efficiently
Ya

Tidak