ADS-SHR-DOC-SPECTECH
  • UiTM/B1/PER/SHR/B/0625/0038
  • Cadangan Membekal, Menghantar, Memasang, Mengujilari Dan Menyelenggara Peralatan Pengajaran dan Pembelajaran Untuk Makmal Elektronik (Semikonduktor 13), Fakulti Kejuruteraan Elektrik, UiTM Shah Alam
  • Electrical/Electricity/Electronic Wares - Multimeter/Multitester/Ammeter/Voltmeter
  • FKE 2025 (V3) SEMI Curve Trace Precision Source/Measure Unit (2ch, 100fA resolution, 210V, 3A DC/10.5A pulse)
  • 1 Set

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. GENERAL REQUIREMENTS -
I. Vendors must comply with all the requirements specified in this tender document
Ya

Tidak
II. Vendors must bear all costs of supplying the specified quantity of items to UiTM. Such costs shall include the costs of delivery, installation, commissioning, training, troubleshoot and maintenance work (including parts labour and on-site service) within the specified warranty period
Ya

Tidak
2. SPECIFICATION -
I. Measurement Capabilities
-Configuration supports 2-channel setup
-Minimum source resolution at 1 pA / 1 μV, minimum measurement resolution at 100 fA / 100 nV
-Maximum output at 210 V, 3 A DC / 1 0.5 A pulse
-Waveform generation (arbitrary) and digitizing capabilities from 20 μs interval
Features
-Measurement capabilities with an integrated 4-quadrant source
-Color 4.3-inch display supports both graphical and numerical view modes
-Application software facilitates PC-based instrument control included at no charge
-High throughput and SCPI command support conventional SMU’s command set
Front panel operation
-Front panel interface: 4.3” TFT color display (480 x 272, with LED backlight) with keypads and rotary knob
-View mode: Single view, Dual view, Graph view and Roll view
-Hard keys: Single Trigger and Auto Trigger control, 10-key, Rotary Knob and Cursors, Channel on/off, View, Cancel/Local
-Softkeys: Function, System and Input Assist Keys
-Indicators: Channel (measurement) status, System status
Ya

Tidak
II. SPECIFICATION CONDITIONS
Temperature : 23 °C ±5 °C
Humidity : 30% to 80% RH
After 60 minutes warm-up : Ambient temperature change less than ±3 °C after self-calibration execution
Calibration period : 1 year
Measurement speed : 1 PLC (power line cycle)
Ya

Tidak
III. Maximum voltage and current
DC or pulsed : 210 V (max voltage), 0.105 A (max current)
DC or pulsed : 6 V (max voltage), 3.03 A (max current)
Pulsed only : 200 V (max voltage), 1.515 A (max current)
Pulsed only : 6 V (max voltage), 10.5 A (max current)
Ya

Tidak
IV. Maximum current limitation
Ch 1 voltage : ± (0 V < V ≤ 6 V)
Ch 2 voltage : ± (0 V < V ≤ 6 V)
Max total current limitation of Ch 1 and Ch 2 : Ch 1 current + Ch 2 current ≤ 4 A

Ch 1 voltage : ± (6 V < V ≤ 21 V)
Ch 2 voltage : ± (6 V < V ≤ 21 V)
Max total current limitation of Ch 1 and Ch 2 : Ch 1 current + Ch 2 current ≤ 2.5 A
Ya

Tidak
V. Voltage source specifications
Range : ±200 mV
Programming resolution: 1 μV
Accuracy (% reading + offset) : ± (0.015 % + 225 μV)
Noise (peak to peak) 0.1 Hz to 10 Hz: ≤ 10 μV
Max voltage (over range): ±210 mV

Range : ±200 V
Programming resolution: 1 mV
Accuracy (% reading + offset) : ± (0.015 % + 50 mV)
Noise (peak to peak) 0.1 Hz to 10 Hz:≤ 2 mV
Max voltage (over range): ±210 V
Ya

Tidak
VI. Current source specifications
Range : ±10 nA
Programming resolution: -
Accuracy (% reading + offset) :± (0.10 % + 50 pA)
Noise (peak to peak) 0.1 Hz to 10 Hz: ≤ 1 pA
Max voltage (over range): ±10.5 nA

Range : ±10 A , 5
Programming resolution: 100 μA
Accuracy (% reading + offset) :± (0.4 % + 25 mA)
Noise (peak to peak) 0.1 Hz to 10 Hz: -
Max voltage (over range): ±10.5 A
Ya

Tidak
VII. VOLTAGE MEASUREMENT SPECIFICATIONS
Range: ±200 mV
Measurement resolution: 100 nV
Accuracy (% reading + offset): ± (0.015 % + 225 μV)

Range: ±200 V
Measurement resolution: 100 μV
Accuracy (% reading + offset): ± (0.015 % + 50 mV)
Ya

Tidak
VIII. CURRENT MEASUREMENT SPECIFICATIONS:
Range: ±10 nA
Measurement resolution:-
Accuracy (% reading + offset): ± (0.10 % + 50 pA)

Range: ±10 A 3, 5
Measurement resolution: 10 μA
Accuracy (% reading + offset): ± (0.4 % + 25 mA) 6
Ya

Tidak
IX. TIMER AND TRIGGERING SPECIFICATION
Timer
Time stamp: TIMER value automatically saved when each measurement is triggered
Trigger timing resolution: 1 μs to 100 ms
Accuracy: ±50 ppm
Arm/trigger delay: 0 μs to 100,000 s
Arm/trigger interval: 20 μs to 100,000 s
Arm/trigger event: 1 to 100,000

Triggering
Digital I/O Trigger IN to Trigger OUT: ≤ 5 μs
Digital I/O Trigger IN to source change: ≤ 5 μs
LXI Trigger IN to source change: Minimum 100 μs, Typical 200 μs, Maximum unknown
LXI Trigger IN to measurement: Minimum 100 μs, Typical 200 μs, Maximum unknown
Internal event to external LXI trigger output: Minimum 100 μs, Typical 200 μs, Maximum unknown
Minimum trigger interval: 10 μs
Ya

Tidak
X. SOURCE RESOLUTION
- Digit: 5.5 digit or equivalent
- Min. voltage: 1uV or equivalent
- Min. current: 1pA or equivalent
-Lowest current range: 100nA or equivalent
Ya

Tidak
XI. MEASUREMENT RESOLUTION
- Digit: 6.5 digit or equivalent
- Min voltage: 100nV or equivalent
- Min current: 100fA or equivalent
- Min trigger interval: 20 us or equivalent
- Max. trigger count: Infinite
- Max. data buffet size: 100,000 or equivalent
- Limit Test: Included
- Fast transient mode: Included
- Easy file access: Included
Ya

Tidak
XII. INCLUDED WITH (SUPPLIED ACCESSORIES)

- Current-Voltage Curve Measurement Software with Node-locked perpetual license and Care Support 12 months
- PC desktop with specification TWR i5-14500/16GB/512GB/Wif/W11P/3/3/3
-> Tower, Windows 11 Pro 64, CPU INTL i5-14500 5.00 14C 65W,
RAM 16GB (1x16GB) DDR5 4800,
SSD 512GB 2280 PCIe NVMe Value, with wired keyboard and wired
mouse, UHD Graphics 770,
WLAN AX211 Wi-Fi 6E 160MHz +BT 5.3 WW equivalent or better
- BNC Plug to Banana Plug Adapter x4
- BNC CABLE M to M x5
- BNC Tee (female)
- DSUB 29
Ya

Tidak
3. CATALOGUES / BROCHURES -
I. Vendors must provide the catalogues / brochures / technical specification manuals with the tender proposal
Ya

Tidak
II. Original copies of user and operational manual of the equipment must be provided
Ya

Tidak
4. TRAINING -
I. Tenderers are required to provide training for the use, maintenance and troubleshoot of the equipment to the Technical Staff & Lecturer of Faculty of Electrical Engineering, UiTM Shah Alam and all training-related costs are borne by the tenderers.
Ya

Tidak
II. A minimum of one (1) day training for a minimum of one (1) participant covering each module. (Vendors must provide details/syllabus of the training module)
Ya

Tidak
III. Complete training materials and documentation must be provided to all participants
Ya

Tidak
IV. The training MUST be conducted by trainers who are certified by principal. Please attach the trainer's certification that is certified by principal supplier.
Ya

Tidak
5. WARRANTY AND SUPPORT -
I. Vendors must have local service for repair services and provide on call services when required by UiTM
Ya

Tidak
II. Vendors must provide details of warranty. INCLUDING ALL parts, labour, basic phone support for hardware issue, repairs onsite). Please attach the Letter of Warranty (LOW) from the principle, which states that UiTM is entitled to 3 years of warranty upon project completion
Ya

Tidak
III. Vendors be responsible for the installation, commissioning and test-run of the equipment and accompanying software (if applicable) to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance.
Ya

Tidak
IV. All cost on delivery. installation, commissioning and test run shall be borne by the vendor.
Ya

Tidak
V. The vendors MUST provide a genuine product. The vendors must be supported back-to-back by a principle (manufacturer) to provide maintenance services for equipment supplied. The vendors should attach a Letter of Authorization (LOA) from Distributors/ Principal.
Ya

Tidak
VI. Free support through fax, email, telephone must be provided during the warranty period
Ya

Tidak
6. OTHER REQUIREMENTS -
I. Note that all other related material, components and cabling, which are required to ensure full operation of the above package must be supplied and borne by vendors
Ya

Tidak