|
1. TECHNICAL SPECIFICATION
|
-
|
|
|
I. Instruments for moisture determination of raw materials and finished samples in the food.
|
Ya Tidak
|
|
|
II. Display is shown all the parameters regarding the drying process and all the relative results, all viewable at once.
|
Ya Tidak
|
|
|
III. Electromagnetic force restoration weighing system.
|
Ya Tidak
|
|
|
IV. High readability load cell weighing system.
|
Ya Tidak
|
|
|
V. Capacity [Max]: 160g
|
Ya Tidak
|
|
|
VI. Readability : 0.001g
|
Ya Tidak
|
|
|
VII. Max Sample Height: 25 mm
|
Ya Tidak
|
|
|
VIII. Minimum Load: 20 mg
|
Ya Tidak
|
|
|
IX. Working Temperature: 5°C - 35°C
|
Ya Tidak
|
|
|
X. Heating Technology: Halogen infra-red lamp
|
Ya Tidak
|
|
|
XI. Size (W X L X H): 290 mm x 420 mm x 360 mm
|
Ya Tidak
|
|
|
XII. Gross Weight : Approximately 4.7 – 6.5 kg
|
Ya Tidak
|
|
|
XIII. Drying Temperature : 35°C-160°C / 1 °C
|
Ya Tidak
|
|
|
XIV. Measuring unit g or mg
|
Ya Tidak
|
|
|
XV. Pan (mm) : 100 mm samples pan
|
Ya Tidak
|
|
|
2. GENERAL REQUIREMENTS
|
-
|
|
|
I. Manufacturer’s direct support (Please do provide letter from the local or authorized manufacturer or distributor for support to render the after sales service) inclusive installation, commissioning and on-site training.
|
Ya Tidak
|
|
|
3. COST OF DELIVERY
|
-
|
|
|
I. Cost of delivery of the equipment is borne by the tenderer.
|
Ya Tidak
|
|
|
4. SUPPORT
|
-
|
|
|
I. Minimum one (1) year warranty against manufacturing defects for item instrument.
|
Ya Tidak
|
|
|
5. TRAINING
|
-
|
|
|
I. Tenderers are required to provide training for the use, maintenance, troubleshoot and repair of the equipment to the technical staff of UiTM for minimum 1 (one) day for 4 staffs.
Inclusive installation, commissioning and on-site training
|
Ya Tidak
|
|
|
6. INSTALLATION, COMMISIONING AND TRAINING
|
-
|
|
|
I. Testing shall be done by the manufacturer’s qualified & experienced engineers and shall be completed within one month from the delivery date.
The duration / time / training syllabus / number of participants for the training would be discussed on delivery of the equipment.
|
Ya Tidak
|
|