ADS-SHR-DOC-SPECTECH
  • UiTM/B1/PER/SHR/B/0725/0041
  • Cadangan Membekal, Menghantar, Memasang, Mengujilari Dan Menyelenggara Peralatan Pengajaran dan Pembelajaran Untuk Makmal Projek Tahun Akhir (FYP)/ Dream Factory (Semikonduktor 07), Fakulti Kejuruteraan Elektrik, UiTM Shah Alam
  • Workshop Tools & Hardware - Welding/Soldering Equipment, Tools and Accessories
  • FKE SEMIKONDUKTOR 2025 : Desoldering Station Vacuum Pump (Version 2.0)
  • 15 Set

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. GENERAL REQUIREMENTS : -
I. Vendors must comply with all the requirements specified in this tender document.
Ya

Tidak
II. Vendors must bear all costs of supplying the specified quantity of items to UiTM. Such costs shall include the costs of delivery, installation, commissioning, training, troubleshoot and maintenance work (including parts labour and on-site service) within the specified warranty period
Ya

Tidak
2. GENERAL SPECIFICATION : -
I. Voltage : 220V-240V 50Hz
Ya

Tidak
II. Soldering Power : 90W
Ya

Tidak
III. Power Consumption : 140W
Ya

Tidak
IV. Temperature : 160°C ~ 480°C
Ya

Tidak
V. Heating Element : Ceramic Heater
Ya

Tidak
VI. Insulation Resistance : 100M ohm
Ya

Tidak
VII. Ground Resistance : 0.3 ohm
Ya

Tidak
VIII. Standard Plug : UK
Ya

Tidak
IX. Connecting Cord/Hose Length : 105cm
Ya

Tidak
X. Power Cord Length : 1.2m (3 core cord ground plug)
Ya

Tidak
XI. Certificate : CE, RoHS
Ya

Tidak
XII. Weight (kg) : Not more than 1.6kg
Ya

Tidak
X. Control System : Microprocessor
Ya

Tidak
XIV. Vacuum Pump System : Air Pump Motor
Ya

Tidak
XV. Vacuum Pressure: >600mm Hg
Ya

Tidak
XVI. Accessories : Spare tip x 3 : (Ø1.2(on the gun) Ø1.0/ Ø1.5mm) , Cleaning tool x 3 (Ø0.7/ Ø0.9/ Ø1.2mm) , Filter sponge x4 (Ø20.8x1+ Ø16.8x3)
Ya

Tidak
XVII. Station Size (mm) : 172mm (Max) x 135mm (Max) x 190mm (Max)
Ya

Tidak
3. CATALOGUES / BROCHURES : -
I. Vendors must provide the catalogues / brochures / technical specification manuals with the tender proposal.
Ya

Tidak
II. Original copies catalogue of user, brochure, operational manual and clear technical specification of the equipment must be provided
Ya

Tidak
III. Please include a drawing illustrating connection between the components. (if relevant)
Ya

Tidak
IV. The equipment must be supplied with latest programming software and compatible to operate via latest Windows operating system. (if relevant)
Ya

Tidak
V. The equipment offered by vendor must be of the latest available model.
Ya

Tidak
4. TRAINING : -
I. Tenderes are required to provide product briefing for the use include maintenance and troubleshoot of the equipment to the Technical Staff & Lecture of Electrical Engineering School, College of Engineering, UiTM Shah Alam.
Ya

Tidak
5. WARRANTY AND SUPPORT : -
I. Warranty for the equipment is expected to be at least One (1) year warranty.
Ya

Tidak
II. Installation, maintanance, testing and commissioning of the entire system should be completed within (12) week from the delivery date.
Ya

Tidak
III. Vendors must have local service for repair services and provide on call services when required by UiTM
Ya

Tidak
IV. Vendors must provide details of warranty. INCLUDING ALL parts, labour, basic phone support for hardware issue, repairs onsite) Please attach the Letter of Warranty (LOW) from the principle, which states that UiTM is entitled to 1 years of warranty upon project completion
Ya

Tidak
V. Vendors be responsible for the installation, commissioning and test-run of the equipment and accompanying software (if applicable) to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance.
Ya

Tidak
VI. All cost on delivery. installation, commissioning and test run shall be borne by the vendor.
Ya

Tidak
VII. The vendors MUST provide a genuine product. The vendors must be supported back-to-back by a principle (manufacturer) to provide maintenance services for equipment supplied. The vendors should attach a Letter of Authorization (LOA) from Distributors/ Principal.
Ya

Tidak
VIII. Free support through fax, email, telephone must be provided during the warranty period
Ya

Tidak
6. OTHER REQUIREMENTS : -
I. Note that all other related material, components and cabling, which are required to ensure full operation of the above package must be supplied and borne by vendors
Ya

Tidak