ADS-SHR-DOC-SPECTECH
  • UiTM/B1/PER/SHR/B/0725/0041
  • Cadangan Membekal, Menghantar, Memasang, Mengujilari Dan Menyelenggara Peralatan Pengajaran dan Pembelajaran Untuk Makmal Projek Tahun Akhir (FYP)/ Dream Factory (Semikonduktor 07), Fakulti Kejuruteraan Elektrik, UiTM Shah Alam
  • Oscilloscope
  • FKE SEMIKONDUKTOR 2025 : Oscilloscope 2 channels with Function Generator (Version 2.0)
  • 2 Unit

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. GENERAL REQUIREMENTS : -
I. Vendors must comply with all the requirements specified in this tender document.
Ya

Tidak
II. Vendors must bear all costs of supplying the specified quantity of items to UiTM. Such costs shall include the costs of delivery, installation, commissioning, training, troubleshoot and maintenance work (including parts labour and on-site service) within the specified warranty period
Ya

Tidak
2. GENERAL SPECIFICATION : -
I. Bandwidth : 70 MHz (base), upgradeable to 100 MHz
Ya

Tidak
II. Channels : 2 analog + 1 digital (external trigger)
Ya

Tidak
III. Oscilloscope with Function Generator
Ya

Tidak
IV. Sample Rate : Up to 2 GSa/s
Ya

Tidak
V. Memory Depth : 2 Mpts/channel
Ya

Tidak
VI. Waveform Update Rate : 200,000 wfm/s
Ya

Tidak
VII. Display : 7” TFT LCD WVGA
Ya

Tidak
VIII. Mechanical & Environmental :
-Size : 314mm (Max) × 165mm (Max) × 130mm (Max)
-Weight : Not more than 3.23kg
-Power : 100–240 V, 50/60 Hz
-Operating Temperature : 0°C to 50°C
-Certifications: CE, UL, CSA, IEC61010, EMC compliant
Ya

Tidak
IX. Math Functions : Add, subtract, multiply, divide, FFT
Ya

Tidak
X. Automatic Measurements : 32 types (amplitude, timing, pulse count)
Ya

Tidak
XI. Trigger System :
-Modes: Edge, pulse width, setup & hold, video, protocol-specific (I2C, UART, etc.)
-Sensitivity: Supports internal and external triggers with fine voltage control
-Trigger Holdoff: 60 ns to 10 s
Ya

Tidak
XII. Acquisition System :
-Modes: Normal, peak detect, averaging, high-res (up to 12 bits), segmented
-Segmented Memory: Up to 500 segments, 1 μs re-arm time
Ya

Tidak
X. Vertical System :
-Input Impedance : 1 MΩ, 16 pF
-Input Sensitivity : 500 µV/div to 10 V/div
-Max Voltage : 150 Vrms / 200 Vpk
-Vertical Resolution : 8 bits
Ya

Tidak
XIV. Horizontal System :
-Time Base : 5 ns/div to 50 s/div
-Horizontal Resolution : 2.5 ps
-Timebase Accuracy : ±50 ppm ± aging
Ya

Tidak
XV. Built-in Waveform Generator (WaveGen) :
-Waveforms : Sine, square, ramp, pulse, noise, DC
-Max Freq : 20 MHz (sine)
-Modulation : AM, FM, FSK
-Output Amplitude : Up to 20 Vpp (Hi-Z), up to 10 Vpp (50 Ω)
Ya

Tidak
XVI. Serial Protocol Analysis :
-Supported Protocols : I2C, SPI, UART/RS-232, CAN, LIN (Standard)
-Triggering & Decoding Included
Ya

Tidak
XVII. Advanced Features :
-Frequency Response Analysis : 10 Hz to 20 MHz, Bode plot enabled
-Integrated Digital Voltmeter & Counter
-Autoscale & Zoom Modes
-Waveform Storage : CSV, binary, image, Bode data
-PC Connectivity : USB Host & Device, Ethernet
-Software product compatible (for remote control and analysis)
Ya

Tidak
XVIII. Included Accessories :
-2x Passive Probes (100 MHz, model N2140A)
-Localized power cord
-Software product
-3 year warranty
-Secure erase functionality
-Multi-language support (13 languages)
Ya

Tidak
3. CATALOGUES / BROCHURES : -
I. Vendors must provide the catalogues / brochures / technical specification manuals with the tender proposal.
Ya

Tidak
II. Original copies catalogue of user, brochure, operational manual and clear technical specification of the equipment must be provided
Ya

Tidak
III. Please include a drawing illustrating connection between the components. (if relevant)
Ya

Tidak
IV. The equipment must be supplied with latest programming software and compatible to operate via latest Windows operating system. (if relevant)
Ya

Tidak
V. The equipment offered by vendor must be of the latest available model.
Ya

Tidak
4. TRAINING : -
I. Tenderers are required to provide training for the use, maintenance and troubleshoot of the equipment to the Technical Staff & Lecture of Electrical Engineering School, College of Engineering, UiTM Shah Alam and all training-related costs are borne by the tenderers.
Ya

Tidak
II. A minimum of one (1) days training for a minimum of five (5) participants covering each module. (Vendors must provide details/syllabus of the training module)
Ya

Tidak
III. Complete training materials and documentation must be provided to all participants
Ya

Tidak
IV. The training MUST be conducted by trainers who are certified by principal. Please attach the trainer's certification that is certified by principal supplier.
Ya

Tidak
5. WARRANTY AND SUPPORT : -
I. Warranty for the equipment is three (3) years warranty.
Ya

Tidak
II. Installation, maintanance, testing and commissioning of the entire system should be completed within (12) week from the delivery date.
Ya

Tidak
III. Vendors must have local service for repair services and provide on call services when required by UiTM
Ya

Tidak
IV. Vendors must provide details of warranty. INCLUDING ALL parts, labour, basic phone support for hardware issue, repairs onsite) Please attach the Letter of Warranty (LOW) from the principle, which states that UiTM is entitled to 3 years of warranty upon project completion
Ya

Tidak
V. Vendors be responsible for the installation, commissioning and test-run of the equipment and accompanying software (if applicable) to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance.
Ya

Tidak
VI. All cost on delivery. installation, commissioning and test run shall be borne by the vendor.
Ya

Tidak
VII. The vendors MUST provide a genuine product. The vendors must be supported back-to-back by a principle (manufacturer) to provide maintenance services for equipment supplied. The vendors should attach a Letter of Authorization (LOA) from Distributors/ Principal.
Ya

Tidak
VIII. Free support through fax, email, telephone must be provided during the warranty period
Ya

Tidak
6. OTHER REQUIREMENTS : -
I. Note that all other related material, components and cabling, which are required to ensure full operation of the above package must be supplied and borne by vendors
Ya

Tidak