ADS-SHR-DOC-SPECTECH
  • UiTM/B1/PER/SHR/B/0725/0041
  • Cadangan Membekal, Menghantar, Memasang, Mengujilari Dan Menyelenggara Peralatan Pengajaran dan Pembelajaran Untuk Makmal Projek Tahun Akhir (FYP)/ Dream Factory (Semikonduktor 07), Fakulti Kejuruteraan Elektrik, UiTM Shah Alam
  • Power Supply / Switching Power Supply
  • FKE SEMIKONDUKTOR 2025 : Triple Output Programmable DC Bench Power Supply
  • 3 Unit

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. GENERAL REQUIREMENTS : -
I. Vendors must comply with all the requirements specified in this tender document.
Ya

Tidak
II. Vendors must bear all costs of supplying the specified quantity of items to UiTM. Such costs shall include the costs of delivery, installation, commissioning, training, troubleshoot and maintenance work (including parts labour and on-site service) within the specified warranty period
Ya

Tidak
2. GENERAL SPECIFICATION : -
I. Triple Output Programmable DC bench power supply
Ya

Tidak
II. 7-inch colour wide video graphics array display (WVGA)
Ya

Tidak
III. Output terminal : 3 Triple Output DC Bench Power Supply
Ya

Tidak
IV. Size & Weight :
-Dimensions : 165mm (Max) × 314mm (Max) × 241mm (Max)
-Weight : Not more than 9.9kg
Ya

Tidak
V. Power Output : 90W
-Channel 1 : 0–6V / 0–5A
-Channel 2 & 3 : 0–30V / 0–1A each
Ya

Tidak
VI. Regulation :
-Load : Voltage <0.01% + 2mV | Current <0.2% + 10mA
-Line : Voltage <0.01% + 2mV | Current <0.2% + 10mA
Ya

Tidak
VII. Accuracy (Programming & Readback) :
-Voltage : up to ±0.05% + 10mV
-Current : up to ±0.2% + 10mA
Ya

Tidak
VIII. Load Transient Recovery : <50 µs within a 15 mV band
Ya

Tidak
IX. Output Ripple & Noise :
-Voltage : <1 mVrms / 5 mVpp
-Current : <4 mArms
Ya

Tidak
X. Protection Activation Time :
-OVP & OCP : <5 ms
Ya

Tidak
XI. Temperature Coefficient : Very low, ensuring stability across temperature changes
Ya

Tidak
XII. Included Accessories:
-Test leads
-AC power cord
-Banana to alligator clips
Ya

Tidak
X. Power cord : UK Plug
Ya

Tidak
3. CATALOGUES / BROCHURES : -
I. Vendors must provide the catalogues / brochures / technical specification manuals with the tender proposal.
Ya

Tidak
II. Original copies catalogue of user, brochure, operational manual and clear technical specification of the equipment must be provided
Ya

Tidak
III. Please include a drawing illustrating connection between the components. (if relevant)
Ya

Tidak
IV. The equipment must be supplied with latest programming software and compatible to operate via latest Windows operating system. (if relevant)
Ya

Tidak
V. The equipment offered by vendor must be of the latest available model.
Ya

Tidak
4. TRAINING : -
I. Tenderers are required to provide training for the use, maintenance and troubleshoot of the equipment to the Technical Staff & Lecture of Electrical Engineering School, College of Engineering, UiTM Shah Alam and all training-related costs are borne by the tenderers.
Ya

Tidak
II. A minimum of one (1) days training for a minimum of five (5) participants covering each module. (Vendors must provide details/syllabus of the training module)
Ya

Tidak
III. Complete training materials and documentation must be provided to all participants
Ya

Tidak
IV. The training MUST be conducted by trainers who are certified by principal. Please attach the trainer's certification that is certified by principal supplier.
Ya

Tidak
5. WARRANTY AND SUPPORT : -
I. Warranty for the equipment is three (3) years warranty.
Ya

Tidak
II. Installation, maintanance, testing and commissioning of the entire system should be completed within (12) week from the delivery date.
Ya

Tidak
III. Vendors must have local service for repair services and provide on call services when required by UiTM
Ya

Tidak
IV. Vendors must provide details of warranty. INCLUDING ALL parts, labour, basic phone support for hardware issue, repairs onsite) Please attach the Letter of Warranty (LOW) from the principle, which states that UiTM is entitled to 3 years of warranty upon project completion
Ya

Tidak
V. Vendors be responsible for the installation, commissioning and test-run of the equipment and accompanying software (if applicable) to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance.
Ya

Tidak
VI. All cost on delivery. installation, commissioning and test run shall be borne by the vendor
Ya

Tidak
VII. The vendors MUST provide a genuine product. The vendors must be supported back-to-back by a principle (manufacturer) to provide maintenance services for equipment supplied. The vendors should attach a Letter of Authorization (LOA) from Distributors/ Principal.
Ya

Tidak
VIII. Free support through fax, email, telephone must be provided during the warranty period
Ya

Tidak
6. OTHER REQUIREMENTS : -
I. Note that all other related material, components and cabling, which are required to ensure full operation of the above package must be supplied and borne by vendors
Ya

Tidak