|
1. Repair and maintenance service works for AB Sciex QTrap LCMSMS system
|
Ya Tidak
|
|
|
2. To carry out Pre-PM pressure test and system test
|
Ya Tidak
|
|
|
3. To replace the roughing pump oil and exhaust filter
|
Ya Tidak
|
|
|
4. To replace the four air filters in the base of the mass spectrometer chassis.
|
Ya Tidak
|
|
|
5. To clean the turbo pump filter screen and inspect the mass spectrometer, components, and cabling, as required
|
Ya Tidak
|
|
|
6. To clean curtain plate, orifice plate, IonDriveTM QJet ion guide, IQ0 lens and Q0 region
|
Ya Tidak
|
|
|
7. To replace the TurboIonSpray® or APCI electrodeg) To verify that the temperature (TEM) reaches a set point (such as 200°C).
|
Ya Tidak
|
|
|
8. To carry out Post-PM pressure test and system test such as Q1 and Q3 High Mass Positive PPG, Q1 and Q3 HighMass Negative PPG, Positive Enhanced Resolution, Negative Enhanced Resolution, Low Mass Q1 and Q3 Positive PPG,Low Mass Q1 and Q3 Negative PPG and Enhanced Product Ion Mode test.
|
Ya Tidak
|
|
|
9. Record verification data in the PM document and then attach all performance dataj) For Eksigent110XL UHPLC, replace the solvent filters in the solvent bottles.
|
Ya Tidak
|
|
|
10. Training after maintenance
|
Ya Tidak
|
|
|
11. To replace the high pressure seals on all four pump heads, using the tool in the seal kit
|
Ya Tidak
|
|
|
12. To replace the plunger seals on all four pump heads, using the tool in the seal kit
|
Ya Tidak
|
|
|
13. To replace the outlet filter on each pump n) To replace the injection valve rotor seal.
|
Ya Tidak
|
|
|
14. To replace the syringe valve, buffer tubing, air needle and sample needle
|
Ya Tidak
|
|
|
15. To confirm the sample needle position at the sample vial.
|
Ya Tidak
|
|
|
16. Monitor the temperature on the column oven display to confirm that the set point is reached.
|
Ya Tidak
|
|
|
17. To perform the pressure test and record results in the Planned Maintenance Data Log
|
Ya Tidak
|
|
|
18. To perform the HPLC MS system test and record results in the Planned Maintenance Data Log
|
Ya Tidak
|
|
|
19. For nitrogen generator, replace and refit all compressor with service kits. Replace all filters and check for any leaking
|
Ya Tidak
|
|
|
20. Review the routine maintenance schedule and procedures with the customer
|
Ya Tidak
|
|
|
21. Warranty cover 12 months and should be cover for training after services
|
Ya Tidak
|
|