ADS-TDR-DOC-SPECTECH
  • UiTM/S1/PER/T/B/1124/0003
  • MEMBEKAL, MENGHANTAR, MEMASANG, MENGUJILARI DAN MENYELENGGARA SISTEM RANGKAIAN TANPA WAYAR BAGI KOLEJ KEDIAMAN PELAJAR, UiTM CAWANGAN SABAH, KAMPUS KOTA KINABALU.
  • Blank Panel
  • Blank Panel_Fasa2_Kolej_UiTM KK_Fasa2
  • 15 Unit

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1.
PROJECT REQUIREMENT
-
I.
The tenderer must ensure that an experienced network engineer does blank panel installation.
Ya

Tidak
II.
The tenderer should make additions of the items if there is any insufficient without any charges to UiTM.
Ya

Tidak
III. The tenderers need to propose the optimum specification for the equipment to function and integrate well with the existing system. Should any component that needs to be added shall be proposed by the tenderer.
Ya

Tidak
IV. The tenderer must ensure the availability, operability, reliability, and functionality of the supplied item components to function properly.
Ya

Tidak
V. All other related materials, components, and accessories that are required to ensure full operation and integration with new or existing equipment of the management ring must be provided by the tenderer
Ya

Tidak
VI. The tenderer must make sure all works are done properly without any damage to the existing infra/equipment. The tenderer shall be responsible for any damage that occurs.
Ya

Tidak
VII. The tenderer must ensure that installations of all blank panel are done by an experienced network technician.
Ya

Tidak
2.
PRODUCT REQUIREMENT
-
I.
The Blank Panel shall be made of aluminum or better.
Ya

Tidak
II.
The Blank panel shall be 1U rack space in height.
Ya

Tidak
III.
The Blank panel shall be 19-inch wide.
Ya

Tidak
IV.
The Blank Panel shall be compatible with the 19-inch equipment racks, cabinets, or wall mount brackets.
Ya

Tidak
V.
The Blank Panel shall come with nut and screw for easy installation.
Ya

Tidak
3.
CATALOGUE AND BROCHURES
-
I.
Tenderer shall provide all related catalogue/brochure.
Ya

Tidak
4.
DELIVERY PERIOD
-
I.
Delivery period must be within 18 weeks after tenderer has received the Offer Letter.
Ya

Tidak
II.
If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.
Ya

Tidak
5. IMPORTANT STATEMENT TO TENDERER -
I. Any documents presented or submitted by the tenderer in this Dokumen Teknikal MUST NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READBLE.
Ya

Tidak