1. PROJECT REQUIREMENTS
|
-
|
|
|
I. A total of fiber panel required for this zone is 2 Unit across the campuses.
The location for installation this item as per below:
UiTM SABAH
Kampus Kota Kinabalu : 2 Units
Notes: Please refer to UiTM Staff for exact installation location.
|
Ya Tidak
|
|
|
II. Tenderer should make additions of the item if there is any insufficient without any charges to UiTM.
|
Ya Tidak
|
|
|
III. The tenderer must ensure all fiber panel installation to be done by experienced network technician.
|
Ya Tidak
|
|
|
IV. Tenderer shall submit installation report for each fiber panel to UiTM for approval.
|
Ya Tidak
|
|
|
V. Tenderer should ensure all existing network equipment/component/cabling is functioning before and after project implementation. Tenderer MUST responsible for any issue listed above.
|
Ya Tidak
|
|
|
VI. The fiber panel must be factory terminated and pass the Quality Assurance (QA) check.
|
Ya Tidak
|
|
|
VII. The tenderer shall prepare a complete and comprehensive commissioning report in a form of hardcopy and softcopy after delivery, installation, and testing to ensure the item and accompanying software or the whole package has adhered to the satisfaction of UNIVERSITI TEKNOLOGI MARA before the final acceptance.
|
Ya Tidak
|
|
|
VIII. The comprehensive commissioning report must include the User Acceptance Test (UAT). The tenderer must also include other additional documents as proof if requested by UiTM.
|
Ya Tidak
|
|
|
2. FIBER PANEL REQUIREMENTS
|
-
|
|
|
I. Tenderer shall supply fiber panel in 1U of rack space.
|
Ya Tidak
|
|
|
II. Fiber panel should support at least 6 Core fiber with SC Connector.
|
Ya Tidak
|
|
|
III. All cabling must conform to EIA/TIA recommended standard.
|
Ya Tidak
|
|
|
IV. The Fiber panel shall use matched components from a single manufacturer, and the cabling system shall certified to deliver system performance over the lifetime of the applications for which the cabling system was originally designed to support.
|
Ya Tidak
|
|
|
V. The Fiber panel shall support pullout drawer enables ease of access to the fiber.
|
Ya Tidak
|
|
|
VI. The Fiber Panel shall support wide range of fiber optic cabling management accessories, including fiber management clip, splice cassettes, cable grounding kits, and cable entry gland.
|
Ya Tidak
|
|
|
VII. The Unused adapter ports in fiber panel shall covered by port caps.
|
Ya Tidak
|
|
|
VIII. The Fiber Panel shall support a complete line of accessories to secure, organize and protect fusion spliced fibers; including splice cassette kits, splice cassette expanders, fusion protection sleeves and protection sleeve holders.
|
Ya Tidak
|
|
|
IX. The fiber panel must follow the standard specifications electrical material approval list by Jabatan Kerja Raya (JKR). Please attach the JKR EMAL document in Dokumen Teknikal.
|
Ya Tidak
|
|
|
X. The tenderer must ensure the fiber panel supplied is a genuine product from Principal. Please attach a Letter of Authorization (LOA) from the Principal/Distributors. **PLEASE DO NOT DISCLOSE COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO THE COMPANY NAME, LOGO, REGISTRATION NUMBER, ETC.
|
Ya Tidak
|
|
|
XI. The product MUST be a new product and had been in the market for less than 18 months.
|
Ya Tidak
|
|
|
3. CABLE LABELING
|
-
|
|
|
I. Tenderer shall ensure all cable-ends at fiber panel must be labeled and the label must be easily read, lasting and waterproof.
|
Ya Tidak
|
|
|
4. TECHNICAL/OPERATING MANUAL, ENGINEERING SERVICES AND OTHER ACCESSORIES
|
-
|
|
|
I. Tenderer shall provide user operating/technical manual for UiTM referral.
|
Ya Tidak
|
|
|
II. All necessary adapters, cables and other accessories required shall be provided in order to allow the system to work.
|
Ya Tidak
|
|
|
5. CATALOGUES/BROCHURES
|
-
|
|
|
I. Tenderer shall provide all related catalogue/brochure.
|
Ya Tidak
|
|
|
6. DELIVERY PERIOD
|
-
|
|
|
I. Delivery period must be within 18 weeks after tenderer has received the Offer Letter.
|
Ya Tidak
|
|
|
II. If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.
|
Ya Tidak
|
|
|
7. WARRANTY
|
-
|
|
|
I. One (1) year of maintenance support consists of equipment faulty replacement (Next Business Day) and software upgrade shall be provided.
The support must be within 8 hours of working days. Please attach Letter of Warranty (LoW) from principle.
|
Ya Tidak
|
|
|
II. Response time to attend to a problem call breakdown of equipment or component is MAXIMUM 4 hours.
|
Ya Tidak
|
|