|
1. PROJECT REQUIREMENT
|
-
|
|
|
I. To install SFP+ single mode module (LC) 10Gbps in UiTM SABAH, Kampus Kota Kinabalu.
Note: Please refer to UiTM Staff for detailed installation location.
|
Ya Tidak
|
|
|
II. Tenderer have to make sure transceiver can support the propose network equipment.
Please specify the model/brand of equipment to the UiTM Staff.
|
Ya Tidak
|
|
|
III. The tenderer must ensure the SFP is workable with existing infra UiTM.
|
Ya Tidak
|
|
|
IV. The tenderer must ensure the SFP supplied is a genuine product from Principle. Please attach a Letter of Authorization (LOA) from the Principle. **PLEASE DO NOT DISCLOSE COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO THE COMPANY NAME, LOGO, REGISTRATION NUMBER, ETC.
|
Ya Tidak
|
|
|
V. UiTM does not accept refurbished or OEM products. The tenderer shall be responsible if there is any issue regarding the product's authenticity.
|
Ya Tidak
|
|
|
VI. The tenderer must ensure the availability, operability, reliability, and functionality of the SFP in order to function properly.
|
Ya Tidak
|
|
|
VII. The tenderer must ensure all other related materials, components, cabling, and accessories including operational license which are required to ensure full operation and integration with new or existing equipment of the item is provided.
|
Ya Tidak
|
|
|
VIII. The tenderer shall prepare a complete and comprehensive commissioning report in a form of hardcopy and softcopy after delivery, installation, and testing to ensure the item and accompanying software or the whole package has adhered to the satisfaction of UNIVERSITI TEKNOLOGI MARA before the final acceptance.
|
Ya Tidak
|
|
|
IX. The comprehensive commissioning report must include the User Acceptance Test (UAT). The tenderer must also include other additional documents as proof if requested by UiTM.
|
Ya Tidak
|
|
|
2. PRODUCT REQUIREMENT
|
-
|
|
|
I. The transceiver support 10 Gigabit Ethernet connectivity.
|
Ya Tidak
|
|
|
II. The transceiver shall pluggable optical transceiver with a duplex LC connector interface for long-reach data communication and interconnect applications using Multi Mode Fiber (SMF).
|
Ya Tidak
|
|
|
III. The transceiver supports link lengths of 10 kilometers on standard Single-Mode Fiber (SMF).
|
Ya Tidak
|
|
|
IV. The transceiver support transmit and receive wavelength 1260nm to 1310nm
|
Ya Tidak
|
|
|
3. PRODUCT SPECIFICATION
|
-
|
|
|
I. The Transceiver support Hot-swappable input/output device that plugs into a 10 Gigabit Ethernet SFP+ port.
|
Ya Tidak
|
|
|
II. The Transceiver shall interoperable with other IEEE 302.3az compliant 10GBASE interfaces where applicable.
|
Ya Tidak
|
|
|
III. The transceiver shall certified and tested on SFP+ 10G ports for superior performance, quality, and reliability.
|
Ya Tidak
|
|
|
4. TECHNICAL / OPERATING MANUAL, ENGINEERING SERVICES AND OTHER ACCESSORIES
|
-
|
|
|
I. All necessary adapters, cables and other accessories required shall be provided.
|
Ya Tidak
|
|
|
II. To configure and provide engineering services on the supplied equipment as per UiTM requirement.
|
Ya Tidak
|
|
|
III. User operating/technical manual shall be provided.
|
Ya Tidak
|
|
|
5. CATALOGUE AND BROCHURES
|
-
|
|
|
I. Tenderer shall provide all related catalogue/brochure.
|
Ya Tidak
|
|
|
6. WARRANTY
|
-
|
|
|
I. Item shall have at least ONE (1) year warranty from tenderer or manufacturer.
Please attach Letter of Warranty (LoW). ** PLEASE ENSURE NO COMPANY INFORMATIONS (NAME, LOGO, REGISTRATION NUMBER, ETC)
|
Ya Tidak
|
|
|
II. The tenderer shall be responsible for the installation, test-run and commissioning of the equipment and accompanying software to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance. All costs on installation, commissioning and Test run shall be borne by tenderer during the warranty period.
|
Ya Tidak
|
|
|
III. Maintenance support is needed during and after the warranty period. Tenderers must provide details of addresses of locations of after sales service centers that shall be responsible for maintenance work for these items during the warranty period.
|
Ya Tidak
|
|
|
IV. Free support through fax, email, telephone must be provided during the warranty period.
|
Ya Tidak
|
|
|
V. A maximum of 4 hours response time to attend to problem call on breakdown of equipment or component is to abide by the tenderer.
|
Ya Tidak
|
|
|
7. DELIVERY PERIOD
|
-
|
|
|
I. Delivery period must be within 18 weeks after tenderer has received the Offer Letter.
|
Ya Tidak
|
|
|
II. If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.
|
Ya Tidak
|
|
|
8. IMPORTANT STATEMENT TO TENDERER
|
-
|
|
|
I. Any document presented or submitted by the tenderer in this Dokumen Teknikal MUST NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT READABLE.
|
Ya Tidak
|
|