  • UiTM/S1/PER/T/B/1124/0003
  • MEMBEKAL, MENGHANTAR, MEMASANG, MENGUJILARI DAN MENYELENGGARA SISTEM RANGKAIAN TANPA WAYAR BAGI KOLEJ KEDIAMAN PELAJAR, UiTM CAWANGAN SABAH, KAMPUS KOTA KINABALU.
  • Uninterrupible Power Supply (UPS) 6KvA
  • Uninterrupible Power Supply (UPS) 6KvA_Kolej_UiTM KK_Fasa2
  • 1 Unit

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. GENERAL SPESIFICATION
-
I.
Tenderer is required to supply a total of 1 units of this item to UiTM SABAH, Kampus Kota Kinabalu.
Ya

Tidak
II.
Rack form factor :€“ 3U

Ya

Tidak
III. Power rating at least 6000VA
Ya

Tidak
IV. Nominal Input Voltage 230V
Ya

Tidak
V. Input Voltage Tolarance 140 Vac (not more then) Vin (not more then) 276 Vac @ 50%
Ya

Tidak
VI. Input Frequency 50/60 Hz ± 5 Hz
Ya

Tidak
VII. Output Frequency 50/60 Hz
Ya

Tidak
VIII. Output Voltage Distortion with Distorcing Load (not more then) 6%
Ya

Tidak
IX. Batteries Type VRLA AGM Lead, Maintenance-Free
Ya

Tidak
X. Batteries Typical Recharge Time 4 - 6 h
Ya

Tidak
XI.
Communication USB/DB9 with RS232 / Slot for communication interface

Ya

Tidak
XII. Surge Capability 1 VDR x 300 Joules
Ya

Tidak
XIII. Operating Temperature 0 - 40 °C
Ya

Tidak
XIV. Output Sockets Terminal block + 8 IEC 320 C13 + IEC 320 C20
Ya

Tidak
2. OVERLOAD TIMES
-
I.
100%
Ya

Tidak
II.
110%
Ya

Tidak
III. 133%
Ya

Tidak
IV.
Load > 150% - Bypass instantaneously shut down after 3 s (load > 150%) shutdown after 2 s (load>200%)
Ya

Tidak
3. ACCESSORIES -
I.
Rackmount Kit -€“ Rack guide kit for 600 -€“ 1000mm rack
Ya

Tidak
4. INSTALLATION -
I.
Required installation, testing & commissioning on-site for the supplied package.

Ya

Tidak
II.
The equipment/software must be workable with the related hardware or software

Ya

Tidak
III.
All other related software, material, components and cabling which are not specified but are required to ensure full integration of the item must be provided. Loopback power cable must be supply.

Ya

Tidak
IV.
The successful tenderers must ensure the total solution must provide seamless integration without third party equipment/software.

Ya

Tidak
V.
The successful tenderer must make sure all the integration workable and successful

Ya

Tidak
VI. Tenderer can propose new system requirements that are equivalent or superior than above specifications.
Ya

Tidak
5. WARRANTY -
I.
Tenderer must provide details of warranty. Take note that the minimum period for the warranty must be 3 years (parts and labour).

Ya

Tidak
II.
The successful tenderer must be supported back to back by principal to provide maintenance services for equipment supplied
State clearly the following
- Response time to attend to problem call on breakdown of equipment or component is made
- Turnover time for repair to be completed, or faulty component (or equipment) to be replaced
Ya

Tidak
6. CATALOGUE / BROCHURES
-
I.
Tenderer must provide the following catalogues/ brochures /technical specification manuals with the tender proposal.

- Power Supply Unit.
- Battery
Ya

Tidak
7. DELIVERY PERIOD
-
I.
Delivery period must be within 18 weeks after tenderer has received the Offer Letter.

Ya

Tidak
II.
If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.
Ya

Tidak