|
1. PROJECT REQUIREMENT
|
-
|
|
|
I. Tenderer must supply and install network automation ready 24 port 10/100/1000T with 1/10G SFP/SFP+ uplink stackable switch access switch.
|
Ya Tidak
|
|
|
II. The equipment must be installed and delivered by the successful Vendor at the installation site specified by UiTM.
|
Ya Tidak
|
|
|
III. Required installation, testing and commissioning and tagging/labelling on-site for the supplied package should be done at UiTM Cawangan Sarawak, Kampus Samarahan.
|
Ya Tidak
|
|
|
IV. Installation must be performed by Certified personnel. Personnel's resumes to be provided.
|
Ya Tidak
|
|
|
2. PRODUCT REQUIREMENT
|
-
|
|
|
I. The switch must be rack-mountable (into standard 19" wide racks).
|
Ya Tidak
|
|
|
II. The switch must support 24x 10/100/1000Base-T.
|
Ya Tidak
|
|
|
III. The switch must support 2x 10 Gigabit SFP+ ports V The switch must support 2x 1 Gigabit SFP ports.
|
Ya Tidak
|
|
|
IV. The switch must support the following transceivers:
|
Ya Tidak
|
|
|
V. The switch SFP port must support any combination of 1000SX, 1000LX, 1000ZX, 10G SR, 10G LR.
|
Ya Tidak
|
|
|
VI. The proposed product must be recognized in Gartner's Magic Quadrant.
|
Ya Tidak
|
|
|
VII. The switch must have up to 92Gbps Gbps of Switching Capacity and forwarding rate of up to 68.44Mpps. X The switch must support at least 512MB of memory with 64MB of Flash Memory.
|
Ya Tidak
|
|
|
VIII. The switch must support stacking bandwidth of 40Gbps between Switches (Virtual or Enhanced Stacking Not Accepted).
|
Ya Tidak
|
|
|
IX. The switch must support up to 16K of MAC address entries XIII The switch must support VLAN on all ports.
|
Ya Tidak
|
|
|
X. The switch must support IEEE 802.1D Rapid Spanning Tree for fast failover in the event of link failure.
|
Ya Tidak
|
|
|
XI. The switch must support Virtualization Technology to allow multiple switches to be managed as a single virtual chassis. The virtualization technology shall simplifies network operation by eliminating the complexity of Spanning Tree or VRRP. (Virtual and Enhanced Stacking Not Accepted)
|
Ya Tidak
|
|
|
XII. The switch must support link aggregation IEEE 802.1AX protocol for Static and Dynamic Link Aggregation.
|
Ya Tidak
|
|
|
XIII. The switch must support USB Slot.
|
Ya Tidak
|
|
|
XIV. The switch must support built in Management Framework to provide the network with backup, recovery and firmware upgrade management without the need of any additional hardware modules or software. (Please Elaborate and provide documentations)
|
Ya Tidak
|
|
|
XV. The switch must support Optical DDM for real time monitoring of transceiver according to SFF-8472 specifications.
|
Ya Tidak
|
|
|
XVI. The proposed networking solution must be of the same brand for ease of management.
|
Ya Tidak
|
|
|
3. CATALOGUES / BROCHURE
|
-
|
|
|
I. Tenderer shall provide all related catalogue/brochure.
|
Ya Tidak
|
|
|
II. Tenderer shall attach the Authorized Letter (LOA) from principle.
|
Ya Tidak
|
|
|
4. WARRANTY AND SUPPORT
|
-
|
|
|
I. THREE (3) years of maintenance support consists of equipment faulty replacement (Next Business Day) and software upgrade shall be provided. Please provide Letter of Warranty (LoW) from principle.** PLEASE DO NOT DISCLOSED COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC)THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
|
Ya Tidak
|
|
|
5. DELIVERY PERIOD
|
-
|
|
|
I. Delivery period must be within 18 weeks after tenderer has received the Local Order.
|
Ya Tidak
|
|
|
II. If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.
|
Ya Tidak
|
|
|
6. IMPORTANT NOTICE TO TENDERER
|
-
|
|
|
I. Any documents presented or submitted by the tenderer in this Dokumen Teknikal MUST NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
|
Ya Tidak
|
|