|
1. PROJECT REQUIREMENT
|
-
|
|
|
I. To install 3 meter fiber patch cord LC-SC single mode in Universiti Teknologi MARA Cawangan Sarawak, Kampus Samarahan. Note: Please refer to UiTM Staff for detailed installation location.
|
Ya Tidak
|
|
|
II. Tenderer should make additions of the fiber patch cord if there is any insufficient without any charges to UiTM.
|
Ya Tidak
|
|
|
III. Tenderer MUST ensure all Fiber Patch Cord installation to be done by professional engineer.
|
Ya Tidak
|
|
|
2. PRODUCT REQUIREMENT
|
-
|
|
|
I. The Fiber Patch cord MUST equal or exceed performance requirements specified by the TIA/EIA structured cabling standards.
|
Ya Tidak
|
|
|
II. The Fiber Patch cord support higher signal-to-noise ratio, providing better reliability and higher data rates.
|
Ya Tidak
|
|
|
III. The Fiber Patch cord supplied MUST be factory terminated and tested.
|
Ya Tidak
|
|
|
IV. Tenderer MUST follow standard specification electrical material approve list by Jabatan Kerja Raya (JKR). **Please attach JKR confirmation.
|
Ya Tidak
|
|
|
V. The Fiber Patch cord supplied by vendor MUST be Single Mode with at least 3 Meter in length.
|
Ya Tidak
|
|
|
VI. Tenderer MUST supply genuine product. Please attach the Letter of Authorized Letter (LOA) from principle. ** PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
|
Ya Tidak
|
|
|
VII. The product MUST be a new product and had been in the market for less than 18 months.
|
Ya Tidak
|
|
|
VIII. All cables end MUST be labeled, and the label shall be easily read, lasting and waterproof.
|
Ya Tidak
|
|
|
3. PRODUCT SPECIFICATION
|
-
|
|
|
I. Tenderers are shall ensure that the connector type is precise which is LC - SC pigtails.
|
Ya Tidak
|
|
|
II. The Fiber Patch cord shall meet insertion loss better than 0.35dB.
|
Ya Tidak
|
|
|
4. CATALOGUE AND BROCHURES
|
-
|
|
|
I. Tenderer shall provide all related catalogue/brochure.
|
Ya Tidak
|
|
|
5. WARRANTY
|
-
|
|
|
I. Item shall have at least ONE (1) year warranty from tenderer or manufacturer. Please attach Letter Of Warranty (LoW).
|
Ya Tidak
|
|
|
6. DELIVERY PERIOD
|
-
|
|
|
I. Delivery period must be within 18 weeks after tenderer has received the Offer Letter.
|
Ya Tidak
|
|
|
II. If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.
|
Ya Tidak
|
|
|
7. IMPORTANT STATEMENT TO TENDERER
|
-
|
|
|
I. Any documents presented or submitted by the tenderer in this Dokumen Teknikal MUST NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
|
Ya Tidak
|
|