ADS-TDR-DOC-SPECTECH
  • UiTM/W1/PER/T/B/0225/0001
  • MEMBUKA, MEMBEKAL, MENGHANTAR, MEMASANG DAN MENGUJILARI PERALATAN SERTA MENAIK TARAF SISTEM RANGKAIAN DI UNIVERSITI TEKNOLOGI MARA CAWANGAN SARAWAK, KAMPUS KOTA SAMARAHAN
  • SFP+ Multi Mode 10Gbps Type C
  • 13. CADANGAN MEMBEKAL, MENGHANTAR DAN MEMASANG SFP+ MULTI MODE MODULE (LC) 10Gbps DI UNIVERSITI TEKNOLOGI MARA CAWANGAN SARAWAK, KAMPUS KOTA SAMARAHAN
  • 12 Unit

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. PROJECT REQUIREMENT -
I. To install SFP+ multi mode module (LC) 10Gbps in Universiti Teknologi MARA Cawangan Sarawak, Kampus Samarahan. Note: Please refer to UiTM Staff for detailed installation location.
Ya

Tidak
II. Tenderer have to make sure transceiver can support the propose network equipment. Please specify the model/brand of equipment to UiTM Staff.
Ya

Tidak
III. Tenderer shall ensure the transceiver MUST be a new product and had been in the market for less than 18 months.
Ya

Tidak
IV. The transceiver MUST be a genuine product. Please attach the Authorized Letter (LOA) from principle. ** PLEASE ENSURE NO COMPANY INFORMATIONS (NAME, LOGO,/REGISTRATION NUMBER, ETC) READABLE.
Ya

Tidak
2. PRODUCT REQUIREMENT -
I. The transceiver support 10 Gigabit Ethernet connectivity.
Ya

Tidak
II. The transceiver shall pluggable optical transceiver with a duplex LC connector interface for long-reach data communication and interconnect applications using Multi Mode Fiber (SMF)
Ya

Tidak
III. The transceiver supports link lengths of 10 kilometers on standard Single-Mode Fiber (SMF).
Ya

Tidak
IV. The transceiver support transmit and receive wavelength up to 850nm.
Ya

Tidak
3. PRODUCT SPECIFICATION -
I. The Transceiver support Hot-swappable input / output device that plugs into a 10 Gigabit Ethernet SFP+ port.
Ya

Tidak
II. The Transceiver shall interoperable with other IEEE 302.3az compliant 10GBASE interfaces where applicable.
Ya

Tidak
III. The transceiver shall certified and tested on SFP+ 10G ports for superior performance, quality, and reliability.
Ya

Tidak
4. TECHNICAL / OPERATING MANUAL, ENGINEERING SERVICES AND OTHER ACCESSORIES -
I. All necessary adapters, cables and other accessories required shall be provided.
Ya

Tidak
II. To configure and provide engineering services on the supplied equipment as per UiTM requirement.
Ya

Tidak
III. User operating/technical manual shall be provided.
Ya

Tidak
5. CATALOGUE AND BROCHURES -
I. Tenderer shall provide all related catalogue/brochure.
Ya

Tidak
6. WARRANTY -
I. Item shall have at least ONE (1) year warranty from tenderer or manufacturer. Response time to attend to a problem call breakdown of equipment or component is MAXIMUM 4 hours. The support must be within 8 hours of working days. **Please attach Letter of Warranty (LoW) from Principle.
Ya

Tidak
7. DELIVERY PERIOD -
I. Delivery period must be within 18 weeks after tenderer has received the Offer Letter.
Ya

Tidak
II. If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.
Ya

Tidak
8. OTHERS -
I. The comprehensive commissioning report must include the User Acceptance Test and Delivery Order. The tenderer must also include other additional documents as proof if requested by UiTM.
Ya

Tidak
II. Any documents presented or submitted by the tenderer in this Dokumen Teknikal MUST NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
Ya

Tidak