ADS-TDR-DOC-SPECTECH
  • UiTM/W1/PER/T/B/0225/0001
  • MEMBUKA, MEMBEKAL, MENGHANTAR, MEMASANG DAN MENGUJILARI PERALATAN SERTA MENAIK TARAF SISTEM RANGKAIAN DI UNIVERSITI TEKNOLOGI MARA CAWANGAN SARAWAK, KAMPUS KOTA SAMARAHAN
  • Fiber Cabling 6 Core Outdoor Single Mode End-to-End
  • 16. CADANGAN MEMBEKAL, MENGHANTAR DAN MEMASANG DAN MENGUJILARI FIBER CABLING 6 CORE OUTDOOR SINGLE MODE END-TO-END DI UNIVERSITI TEKNOLOGI MARA CAWANGAN SARAWAK, KAMPUS KOTA SAMARAHAN
  • 100.00 Lot

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. PROJECT REQUIREMENT -
I. To install and provide Fiber Cabling 6 Core Outdoor Single Mode End-to-End in Universiti Teknologi MARA Cawangan Sarawak, Kampus Samarahan. Note: Please refer to UiTM Staff for detailed installation location.
Ya

Tidak
II. Tenderer should make additions of the distance if there is any insufficient without any charges to UiTM.
Ya

Tidak
III. Tenderer MUST ensure all fiber cabling installation to be done by professional engineer.
Ya

Tidak
IV. Tenderer shall submit installation report for each fiber point to UiTM for approval.
Ya

Tidak
V. Tenderer should ensure all existing network equipment/component/cabling is functioning before and after project implementation. Tenderer shall be responsible for any issue listed above.
Ya

Tidak
2. FIBRE CABLING REQUIREMENTS -
I. The fiber cabling is required to provide network uplink end-to-end solution from point A to point B.
Ya

Tidak
II. Tenderer's initiative to acquire exact length for fiber installation. Please check and confirm the actual length during tender site visit. Tenderer are also required to ensure that the fiber way (i.e. manhole) or trucking is available for a proper fiber installation.
Ya

Tidak
III. All cabling must conform to EIA/TIA recommended standard.
Ya

Tidak
IV. The Fiber cabling system shall use matched components from a single manufacturer, and the cabling system must be certified to deliver system performance over the lifetime of the applications for which the cabling system was originally designed to support. Please attach the Authorized Letter(LOA) from principal. ** PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
Ya

Tidak
V. All components used in the fiber-based cabling system shall have warranty for a period of at least 20 years from date of installation against defects in materials and/or workmanship. Please attach the letter of warranty (LOW) from principle. ** PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
Ya

Tidak
VI. The Fiber cabling shall include all necessary fiber patch cords, fiber patch panels, cable guides and other accessories required to connect to the proposed backbone switches, distribution switches & workgroup switches. Tenderer shall ensure that all accessories are complete.
Ya

Tidak
VII. Tenderer shall supply 6 Core Outdoor Single Mode Fiber Cabling for backbone uplink.
Ya

Tidak
VIII. Tenderers are required to supply the precise number of connector type.
Ya

Tidak
IX. The optical fiber cross-connect/interconnect system rack mount shall be a 12, 24 or 48-fiber Panel unit, with a double- density option to double the number of connections to 24, 48 or 96 without requiring additional rack space.
Ya

Tidak
X. All fibers must be field terminated using fusion-splicing with factory prepared pigtails to minimize signal loss and attenuation.
Ya

Tidak
XI. Tenderer must follow the standard specification electrical material approve list by JKR. Please attach electrical material approve list by JKR.
Ya

Tidak
XII. Tenderer MUST proposed and provide genuine product. Please attach the Authorized Letter (LOA) from principle. ** PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
Ya

Tidak
3. CABLE LABELING -
I. Tenderer shall ensure all cable-ends must be labeled and the label must be easily read, lasting and waterproof.
Ya

Tidak
II. Tenderer shall provide the test result for each network point by hardcopy.
Ya

Tidak
4. TECHNICAL/OPERATING MANUAL, ENGINEERING SERVICES AND OTHER ACCESSORIES -
I. Tenderer shall provide user operating/technical manual for UiTM referral.
Ya

Tidak
II. All necessary adapters, cables and other accessories required shall be provided in order to allow the system to work.
Ya

Tidak
5. CATALOGUES/BROCHURES -
I. Tenderer shall provide all related catalogue/brochure.
Ya

Tidak
6. WARRANTY -
I. TWENTY (20) years of maintenance support consists of equipment part replacement WHICH covers all permanent copper cabling, outlets and jacks within the horizontal cabling structured cabling system which has been tested and certified. **Please attach the letter of warranty (LOW) from the principle. **PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
Ya

Tidak
7. DELIVERY PERIOD -
I. Delivery period must be within 18 weeks after tenderer has received the Offer Letter.
Ya

Tidak
II. If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.
Ya

Tidak
8. IMPORTANT NOTICE TO TENDERERS -
I. Any documents presented or submitted by the tenderer in this Dokumen Teknikal MUST NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
Ya

Tidak