ADS-TDR-DOC-SPECTECH
  • UiTM/W1/PER/T/B/0225/0001
  • MEMBUKA, MEMBEKAL, MENGHANTAR, MEMASANG DAN MENGUJILARI PERALATAN SERTA MENAIK TARAF SISTEM RANGKAIAN DI UNIVERSITI TEKNOLOGI MARA CAWANGAN SARAWAK, KAMPUS KOTA SAMARAHAN
  • UTP Patch Panel 24 Port
  • 17. CADANGAN MEMBUKA PATCH PANEL LAMA DAN MEMBEKAL, MENGHANTAR SERTA MEMASANG UTP PATCH PANEL 24 PORT DI UNIVERSITI TEKNOLOGI MARA CAWANGAN SARAWAK, KAMPUS KOTA SAMARAHAN
  • 44 Set

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. PROJECT REQUIREMENT -
I. To dismantle the existing (old) UTP Patch panel and install new UTP panel 24 port to be use at equipment rack. Notes: Please refer to UiTM Staff for detailed installation location.
Ya

Tidak
II. Tenderer should make additions of the items if there is any insufficient without any charges to UiTM.
Ya

Tidak
III. Tenderer MUST ensure all installation UTP Patch Panel done by professional engineer.
Ya

Tidak
2. PRODUCT REQUIREMENT -
I. The UTP Patch Panel MUST equal or exceed performance requirements specified by the ANSI/TIA/EIA structured cabling standards.
Ya

Tidak
II. The UTP Patch Panel MUST meet ISO/IEC standard.
Ya

Tidak
III. The UTP Patch Panel supplied MUST be fully populated with modular jack.
Ya

Tidak
IV. Tenderer must follow the standard specification electrical material approve list by JKR. **Please attach material approval list by JKR in Dokumen Teknikal.
Ya

Tidak
V. The UTP Patch cord supplied by vendor MUST be in 24 Port RJ45.
Ya

Tidak
VI. Tenderer must provide a genuine product. The tenderer must be supported back-to-back by a principal (manufacturer) to provide maintenance services for equipment supplied. The tenderer should attach a Letter of Authorization (LOA) from Distributors/ Principal. ** PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
Ya

Tidak
VII. The product MUST be a new product and had been in the market for less than 18 months.
Ya

Tidak
VIII. All cables end MUST be labeled, and the label shall be easily read, lasting and waterproof.
Ya

Tidak
3. PRODUCT SPECIFICATION -
I. The UTP Patch Panel supposed unshielded design.
Ya

Tidak
II. The UTP Patch Panel shall feature optional wire management to secure cable bundles, control and maintain proper cable bend radius and provide physical protection for terminations.
Ya

Tidak
III. Modular connector or plug for UTP Patch Panel is RJ-45.
Ya

Tidak
IV. Tenderer must ensure that the UTP Patch Panel MUST be compatible with the 19-inch equipment racks, cabinets, or wall mount brackets.
Ya

Tidak
V. The UTP Patch Panel shall have 16-gauge steel metal construction and the modular holder shall be made of UL94V-0 gray or black fire-retardant plastic constructions.
Ya

Tidak
VI. The UTP Patch cord is Category 6 (CAT6).
Ya

Tidak
VII. The UTP Patch Panel shall be in 1U rack space.
Ya

Tidak
4. CATALOGUE AND BROCHURES -
I. Tenderer shall provide all related catalogue/brochure.
Ya

Tidak
5. WARRANTY AND SUPPORT -
I. Item shall have at least ONE (1) year warranty from tenderer or manufacturer. Please attach Letter of Warranty (LoW) from Principle. ** PLEASE DO NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
Ya

Tidak
II. Response time to attend to a problem call breakdown of equipment or component is MAXIMUM 4 hours. The support must be within 8 hours of working days.
Ya

Tidak
III. The warranty period will begin after the installation and testing is complete.
Ya

Tidak
6. DELIVERY PERIOD -
I. Delivery period must be within 18 weeks after tenderer has received the Offer Letter.
Ya

Tidak
II. If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.
Ya

Tidak
7. OTHERS -
I. Any documents presented or submitted by the tenderer in this Dokumen Teknikal MUST NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY'S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
Ya

Tidak