MEMBUKA, MEMBEKAL, MENGHANTAR, MEMASANG DAN MENGUJILARI PERALATAN SERTA MENAIK TARAF SISTEM RANGKAIAN DI UNIVERSITI TEKNOLOGI MARA CAWANGAN SARAWAK, KAMPUS KOTA SAMARAHAN
Nama Barangan
Rack Housekeeping
Tajuk Spesifikasi Barangan
21. CADANGAN KERJA KERJA PENGEMASAN NETWORK RACK DI UNIVERSITI TEKNOLOGI MARA CAWANGAN SARAWAK, KAMPUS KOTA SAMARAHAN.
Kuantiti
1.00 Lot
Maklumat Spesifikasi Teknikal
Bil.
Keterangan
Calit
Tawaran/Catatan
1. PROJECT REQUIREMENT
-
I. Job scope for this project is to perform housekeeping of the network rack in the server room. Note: Please refer to UiTM Staff for detailed location.
Ya
Tidak
II. Tenderer MUST ensure all rack housekeeping to be done by professional engineer. Please attach Engineer Certification and Co-curriculum Vitae (CV)
Ya
Tidak
III. Tenderer must rearrange or/and reshuffle cabling inside the network rack for tidiness and proper tagging.
Ya
Tidak
IV. Tenderer shall ensure all rack is clean and all cables are labeled with proper tagging and clear for easy recognition.
Ya
Tidak
V. Tenderer shall get approval from UiTM Staff after housekeeping is done.
Ya
Tidak
VI. Tenderer MUST ensure the network equipment and the connectivity of the network in a good condition same as before.
Ya
Tidak
2. DELIVERY PERIOD
-
I. Delivery period must be within 18 weeks after tenderer has received the Offer Letter.
Ya
Tidak
II. If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.