ADS-TDR-DOC-SPECTECH
  • UiTM/C1/PER/T/B/0325/0001
  • CADANGAN MEMBEKAL, MENGHANTAR, MEMASANG DAN MENGUJILARI SISTEM RANGKAIAN WiFi (FASA 2) BAGI KOLEJ KEDIAMAN PELAJAR (KMK1) UiTM CAWANGAN PAHANG KAMPUS JENGKA
  • Wireless Access Point
  • Rp4-C1-Wireless Access Point 2 x 2 - Jengka
  • 698 Unit

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. GENERAL REQUIREMENT -
I. The scope of this project is to deliver, install and configure, testing and commissioning Wireless Access Point 2 x 2 MIMO and the tenderer shall Install and configuration 698 units Access Point.

i) Custom L Bracket
ii) Power Injector
iii) HeatMap
iv) WiFi Signage


***Notes : Please refer UiTM Staff for detailed installation location.
Ya

Tidak
II. The tenderer needs to propose the optimum specification for the equipment to function and integrate well with the existing system. Should any component that need to be added shall be proposed by the tenderer.
Ya

Tidak
III. The tenderer must ensure the availability, operability, reliability and functionality of the supplied item components to function properly.
Ya

Tidak
IV. The tenderer needs to propose heat map analysis before doing installation for wireless access point at every location or building involve in this project.
Ya

Tidak
V. The propose location of wireless access point based on heat map analysis must be agree by UiTM
Ya

Tidak
VI. All documents, design and heat map data during analysis must be presented to UiTM and being documented in hardcopy and softcopy
Ya

Tidak
VII. The tenderer must ensure the proposed wireless access point is a new and not a refurbished or OEM product. The tenderer shall be responsible if there is any issue regarding the product’s authenticity.
Ya

Tidak
VIII. All proposed software must complete a working model with educational licensing and discounts and must be a GENUINE COPY.
Ya

Tidak
IX. The tenderer must ensure that the supplied hardware meets the specified specification requirements and if there is any problem regarding the hardware model, the tenderer must replace it with hardware that is equivalent or better than the specified specifications.
Ya

Tidak
X. The tenderer needs to propose the optimum specification for the equipment to function and integrate well with the existing system. Should any component that need to be added shall be proposed by the tenderer.
Ya

Tidak
XI. The tenderer must make sure all works are done properly without any damage to the existing infra/equipment and shall be responsible for any damage occurred.
Ya

Tidak
XII. All other related material, components, cabling and accessories which are required to ensure full operation and integration with new or existing equipment of the item must be provided by the tenderer.
Ya

Tidak
2. TECHNICAL REQUIREMENT -
I. The wireless access point shall support IEEE 802.11ax (WiFi-6) standard Dual concurrent 802.11ax or better architecture to deliver better performance for advanced applications.
Ya

Tidak
II. The wireless access point is able to support backward-compatibility with 11ac/a/b/g/n client devices.
Ya

Tidak
III. Accessories :
-
A ) All necessary adapters, cables, and accessories required shall be provided to make sure this project is well function.
Ya

Tidak
B ) Tenderer shall include all related licensing cost required to ensure Access Point can operate with optimum.
Ya

Tidak
IV. The wireless access point support indoor use with minimum 2 x 2 antenna
Ya

Tidak
V. The wireless access point can supports minimum 1,200 Mbps in 5-GHz frequency band and 574 Mbps in 2.4-GHz frequency band
Ya

Tidak
VI. The wireless access point support antenna 2 x 2.4GHz with 4 dBi and 2 x 5GHz with 5 dBi
Ya

Tidak
VII. The wireless access point support maximum power consumption at least 12.8W
Ya

Tidak
3. INSTALLATION, TESTING AND COMMISSIONING -
I. The tenderer must ensure the installation of the wireless access point at the optimum level and if the installation of L bracket is required in a particular location, the tenderer must provide it.
Ya

Tidak
II. The tenderer shall provide a cage for every access point installed to avoid theft and the cage must come with a padlock.
Ya

Tidak
III. System setup and configuration must be performed and made good by the tenderer so that good service quality is achieved.
Ya

Tidak
IV. The tenderer must affix a sticker on the access point with details such as company name or logo, project number and device host-name. The sticker must be durable, long lasting and easy to read.
Ya

Tidak
V. The tenderer must ensure all cable-ends and wireless access points are labeled and the label must be easily read, lasting, and waterproof.
Ya

Tidak
VI. The tenderer shall prepare a complete and comprehensive commissioning report in a form of hardcopy and softcopy after delivery, installation, and testing to ensure the item and accompanying software or the whole package has adhered to the satisfaction of UNIVERSITI TEKNOLOGI MARA before the final acceptance.
Ya

Tidak
VII. The comprehensive commissioning report must include the User Acceptance Test (UAT). The tenderer must also include other additional documents as proof if requested by UiTM.
Ya

Tidak
VIII. The tenderer shall be responsible for the installation, test-run and commissioning of the equipment and accompanying software to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance. All costs on installation, commissioning and Test run shall be borne by the tenderer during the warranty period.
Ya

Tidak
4. WIRELESS ACCESS POINT RELOCATION -
I. A total number of Wireless Access Points that need to be relocated for this project is 64 units.

***Note: Please refer to UiTM Staff for detailed installation location for existing Wireless Access Point
(relocate)
Ya

Tidak
II. Tenderer shall ensure the existing Wireless Access Points are dismantled properly.
Ya

Tidak
III. The tenderer should ensure existing Wireless Access Point, cabling and other components related functioning as before relocation. The tenderer shall be responsible for any damage that occurs.
Ya

Tidak
IV. The comprehensive commissioning report must include the User Acceptance Test. The tenderer must also include other additional documents as proof if requested by UiTM.
Ya

Tidak
5. WARRANTY AND TECHNICAL SUPPORT -
I. Three (3) years of maintenance support consists of equipment faulty replacement (Next Business Day 8x5xNBD) and software upgrade shall be provided.
Ya

Tidak
II. Maintenance support is needed during and after the warranty period.
Ya

Tidak
III. Free support through fax, email, and telephone must be provided during the warranty period.
Ya

Tidak
IV. The tenderer must be supported back-to-back by principal to provide maintenance services for equipment supplied.
Ya

Tidak
V. A maximum of 4 hours response time to attend to problem call on breakdown of equipment or component is to abide by the tenderer.
Ya

Tidak
6. SUPPORTING DOCUMENTS

TENDERER MUST PROVIDE THE FOLLOWING SUPPORTING DOCUMENTS AND MUST BE PRESENTED IN THIS DOKUMEN TEKNIKAL


** PLEASE DO NOT DISCLOSE COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC) FOR ALL DOCUMENTS REQUIRED HERE.
-
I. The tenderer shall provide all related catalogues/brochure, and the document must be presented in Dokumen Teknikal.
Ya

Tidak
II. The tenderer must attach a Letter of Authorization (LOA) from Principal. This document must be presented in Dokumen Teknikal
Ya

Tidak
III. The tenderer must attach a Letter of Warranty (LoW) from Principal. This document must be presented in the Dokumen Teknikal.
Ya

Tidak
IV. The tenderer must attach at least ONE (1) related Engineer certification and Co-curriculum Vitae (CV) upon signing SURAT SETUJU TERIMA (SST)
Ya