1. GENERAL REQUIREMENT
|
-
|
|
|
I. A total number of standing and wallmounted network Racks [14] required for this project.The list as follow :
- Tenderer must supply [ 2 ] of [42U] standing Network Rack
- Tenderer must supply [ 9 ] of [15U] Wallmounted Network Rack
- Tenderer must supply [ 3 ] of [4U] Wallmounted Network Rack
|
Ya Tidak
|
|
|
II. Tenderer must ensure the availability, operability, reliability and functionality of the supplied items component to function properly.
|
Ya Tidak
|
|
|
III. Tenderers need to propose the optimum specification for the equipment to function and integrate well with the existing system. Should any component that needs to be added shall be proposed by the tenderer.
|
Ya Tidak
|
|
|
IV. All other related material, components, cabling, and accessories that are required to ensure full operation and integration with new or existing equipment of the item must be provided by the tenderer
|
Ya Tidak
|
|
|
V. Tenderer must make sure all works are done properly without any damage to the existing infra or equipment. The tenderer shall be responsible for any damage that occurs.
|
Ya Tidak
|
|
|
VI. The proposed network rack will be integrated with all hardware purchased in this tender. The tenderer is required to integrate all items into the proposed rack system.
|
Ya Tidak
|
|
|
VII. Tenderer must provide the network rack that includes all products pertaining to cooling, monitoring, power distribution and management among others that work in conjunction to deliver higher efficiency and availability apart from optimal capacity.
|
Ya Tidak
|
|
|
VIII. Tenderer must ensure all network rack installations to be done by an experienced network technician.
|
Ya Tidak
|
|
|
2. TECHNICAL REQUIREMENT
|
-
|
|
|
I. 4U Wallmounted Network Rack :
- Network rack must be 4U height.
- Network rack must be minimum 600mm width in order to install new PoE switch at the specified location.
- Network rack must be front perforated door with cam lock
- Network rack must be side panel
- Network rack must be panel mounting members
- Network rack must be at least 3 gang PDU
- Network rack must be M6 caged nuts
- Network rack must be Polyester Epoxy Powder Coated Finishing (BLACK)
- Network rack must be rack structure using 1.0mm thick mild steel
- The Network Rack Must have a minimum [ 2 ] fan on top of each racks.
- The Network Rack shall be lockable and tenderer must provide the key to UiTM after project is complete
|
Ya Tidak
|
|
|
II. 42U Standing Network Rack :
- Network rack must be 42U height
- Network rack must be minimum 800mm width in order to install new PoE switch at the specified location
- Network rack must be front perforated door with type
- Network rack must have rear vented door with lock type
- Network rack must side panel
- Network rack must top cover with openings
- Network rack must panel mounting members (2.0mm)
- Network rack must fan
- Network rack must tray
- Network rack must 13A SSO power point at least 2 sets of 6 gang
- Network rack must M6 caged nuts
- Network rack must adjustable feet
- Network rack must castor wheels
- Network rack must Polyester Epoxy Powder Coated Finishing (BLACK)
- Network rack must Rack structure using 1.0mm thick mild steel
- The Network Rack Must have a minimum [ 2 ] fan on top of each racks.
- The Network Rack shall be lockable and tenderer must provide the key to UiTM after project is complete
|
Ya Tidak
|
|
|
III. 15U Wallmounted Outdoor Network Rack :
- Network rack must be 15U height
- Network rack must be minimum 500mm width in order to install new PoE switch at the specified location
- Network rack can be use at outdoor enviroment
- Network rack must be IP45 rating
- Network rack must be comes ventilation fan
- Network rack must be door with lock
- Network rack must be at least 3 gang PDU
- Network rack must be M6 caged nuts
- Network rack must be Polyester Epoxy Powder Coated Finishing (BLACK)
|
Ya Tidak
|
|
|
3. INSTALLATION, TESTING AND COMMISSIONING
|
-
|
|
|
I. Tenderer is required to provide full data cabling, power cabling, connector, cable marking, installation, termination and all other accessories.
|
Ya Tidak
|
|
|
II. Tenderer must ensure that all terminal or interface work meet UiTM requirements. Tenderer must add and bear the cost for additional accessories and extenders needed.
|
Ya Tidak
|
|
|
III. All equipment customized brackets or panels shall be properly installed and adequate to withstand the weight of the equipment.
|
Ya Tidak
|
|
|
IV. After the completion of all installation works, performance and function test shall be conducted
|
Ya Tidak
|
|
|
V. The tenderer should ensure all existing network equipment /component/cabling is functioning before and after project implementation. The tenderer shall be responsible for any damage that occurs.
|
Ya Tidak
|
|
|
VI. Tenderer should ensure all existing network equipment/component/cabling is functioning before and after project implementation. Tenderer MUST be responsible for any issue as listed above.
|
Ya Tidak
|
|
|
VII. The tenderer shall be responsible for the installation, test run, and commissioning of the equipment and accompanying software to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance. All costs on the installation, commissioning, and test run shall be borne by the tenderer during the warranty period.
|
Ya Tidak
|
|
|
VIII. Delivery period must be within 18 weeks after tenderer has received the Offer Letter.
|
Ya Tidak
|
|
|
IX. If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.
|
Ya Tidak
|
|
|
4. WARRANTY AND TECHNICAL SUPPORT
|
-
|
|
|
I. The item shall have at least [Three (3) years] of maintenance support consists of equipment faulty replacement (Next Business Day) and software upgrade shall be provided
|
Ya Tidak
|
|
|
II. The warranty must cover a minimum [Three (3) year] warranty.
|
Ya Tidak
|
|
|
III. The tenderer need to attach a Letter of Authorization (LOA) from Principal/Distributor in the Dokumen Teknikal.
|
Ya Tidak
|
|
|
IV. The tenderer need to attach a Letter of Warranty (LOW) from Principal/Distributor in the Dokumen Teknikal.
|
Ya Tidak
|
|
|
V. Maintenance support is needed during the warranty period. Tenderer shall propose the schedule for maintenance & Services.
|
Ya Tidak
|
|
|
VI. Free support through fax, email, and telephone must be provided during the warranty period
|
Ya Tidak
|
|
|
5. SUPPORTING DOCUMENTS
|
-
|
|
|
I. TENDERER MUST PROVIDE THE FOLLOWING SUPPORTING DOCUMENTS AND MUST BE PRESENTED IN THIS DOKUMEN TEKNIKAL
** PLEASE DO NOT DISCLOSE COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC) FOR ALL DOCUMENTS REQUIRED HERE.
|
-
|
|
|
II. Tenderers must provide 3 Type Rack the following catalogues/ brochures/ technical specification manuals for the proposed network rack.
- [42U] standing Network Rack catalogues/ brochures
- [4U] Wallmounted Network Rack catalogues/ brochures
- [15U] Wallmounted Outdoor Rack catalogues/ brochures
|
Ya Tidak
|
|