ADS-TDR-DOC-SPECTECH
  • UiTM/P1/PER/T/B/0625/0001
  • CADANGAN MENAIKTARAF SISTEM RANGKAIAN TANPA WAYAR (WIFI) DI KOLEJ-KOLEJ KEDIAMAN PELAJAR, UNIVERSITI TEKNOLOGI MARA CAWANGAN PULAU PINANG, KAMPUS PERMATANG PAUH, PULAU PINANG.
  • Access Network Switch / Workgroup Switch
  • 2. Access Switch 48_Port POE Gigabit Ethernet 740W - RP4 PPAUH
  • 12 Unit

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. GENERAL REQUIREMENT -
I. The scope of this project is to deliver, install and configure, test and commission 48 port POE Access Switch.
Ya

Tidak
II. The tenderer must ensure the network access switch supplied is a genuine product from Principal.
Ya

Tidak
III. The tenderer must ensure the network access switch are workable with existing infra UiTM.
Ya

Tidak
IV. The tenderer must ensure the proposed network access switch is a new and not a refurbished or OEM product. The tenderer shall be responsible if there is any issue regarding the product’s authenticity.
Ya

Tidak
V. The tenderer needs to propose the optimum specification for the equipment to function and integrate well with the existing system. Should any component that needs to be added shall be proposed by the tenderer.
Ya

Tidak
VI. The tenderer must ensure the availability, operability, reliability and functionality of the supplied item components to function properly.
Ya

Tidak
VII. The tenderer must ensure that the network access switch proposed meets the characteristics or exceeds the required specifications. **Please specify the exact model offered in the Dokumen Teknikal.
Ya

Tidak
VIII. All other related material, components or equipment, software and licensing are not specified but are required to ensure full integration of above item with proposed system requirements/application must be provided by the tenderer without any cost to UiTM
Ya

Tidak
2. TECHNICAL REQUIREMENT -
I.
The Access switch must support at least 32-Port Gigabit PoE+ and 16-Port 2.5G PoE+ as well as 4-Port 10G SFP+ uplink with 740W PoE budget
Ya

Tidak
II. The Access switch must supports PoE / PoE+ access ports.
Ya

Tidak
III.
The Access switch must fully supports IPv4
Ya

Tidak
IV. The Access switch must fully supports IPv6
Ya

Tidak
V. The Access switch must support centralized cloud management and visualized monitoring.
Ya

Tidak
VI. The Access switch must supports PoE extended mode that allows the device over Ethernet cable at a more extended range up to 250 meters.
Ya

Tidak
VII. The Access switch must supports PD lifeguard that real-timely monitors the status of the device and auto-reboot the device when it is down.
Ya

Tidak
VIII. The Access switch must supports hybrid switch mode that can support multiple management options.
Ya

Tidak
IX. The Access switch must supports Advanced Topology to monitor the whole network including 3rd-Party Devices
Ya

Tidak
X. The Access switch must supports Intelligent Diagnostics and monitors real time CPU and RAM
Ya

Tidak
XI. The Access switch must supports ONE click push configuration from faulty unit to new replacement unit
Ya

Tidak
XII. The Access switch must supports Bandwidth Control features. Port-based bandwidth control (Ingress/Egress)
Ya

Tidak
XIII. The Access switch must supports Voice VLAN for fast and reliable deployment of VoIP
Ya

Tidak
XIV. The Access switch must supports layer 3 features such as multiple IP interface, ARP table, Static ARP, IPv4 static route and IPv6 static route
Ya

Tidak
XV. The Access switch must support Link Aggregation / port channel
Ya

Tidak
XVI. The Access switch must supports robust security that supports Port based / MAC based ACL Storm control, DHCP Snooping, DOS Attack Prevention, 802.1X & RADIUS Authentication
Ya

Tidak
XVII. The Access switch must supports ARP Inspection to check packets in the network.
Ya

Tidak
XVIII. The Access switch must supports the most common Spanning Tree Protocol (STP), Rapid Spanning Tree Protocol (RSTP) and Multiple Spanning Tree Protocol (MSTP) with 64 instances loopback detection.
Ya

Tidak
XIX. The Access switch must supports variety of VLAN such as 4K VLAN, Port Based VLAN, Layer 2 Virtual Private VLAN, Subnet Based VLAN and VLAN tagging
Ya

Tidak
3. INSTALLATION, TESTING AND COMMISSIONING -
I. The tenderer shall provide a user operating / technical manual for UiTM referral upon project delivery.
Ya

Tidak
II. Tenderer must ensure all switches installation and configuration are done by professional engineers.
Ya

Tidak
III. The tenderer must make sure all works are done properly without any damage to the existing infra/equipment and shall be responsible for any damage that occur.
Ya

Tidak
IV. The tenderer shall prepare a complete and comprehensive commissioning report in the form of hardcopy and softcopy after delivery, installation, and testing to ensure the item and accompanying software or the whole package has adhered to the satisfaction of UNIVERSITI TEKNOLOGI MARA before the final acceptance.
Ya

Tidak
V. The comprehensive commissioning report must include the User Acceptance Test (UAT) and the tenderer must also include other additional documents as proof if requested by UiTM.
Ya

Tidak
VI. The Tenderer shall propose all additional or required licenses to ensure the switch can operate to the optimum.
Ya

Tidak
VII. The tenderer must affix a sticker on every access switch with details such as company name/logo, project number, contact number, and device hostname. The sticker must be durable, long-lasting, and easy to read.
Ya

Tidak
VIII. All necessary adapters, cables, and accessories required shall be provided to make sure this project is well function.
Ya

Tidak
4. WARRANTY AND TECHNICAL SUPPORT -
I. Three (3) years of maintenance support consists of equipment faulty replacement (Next Business Day 8X5XNBD) and software upgrades shall be provided.
Ya

Tidak
II. The Access switch shall have a warranty for a period from date of installation against defects in materials and/or workmanship.
Ya

Tidak
III. Tenderer MUST propose and provide a genuine product.
Ya

Tidak
IV. Tenderer must ensure all switches installation and configuration are done by professional engineers.
Ya

Tidak
V. Maintenance support is needed during and after the warranty period.
Ya

Tidak
VI. Free support through fax, email, and telephone must be provided during the warranty period.
Ya

Tidak
VII. The successful tenderer must be supported back-to-back by principal to provide maintenance services for equipment supplied.
Ya

Tidak
VIII.
If there is a delay in project delivery, Tenderer must apply for an extension at least 1 month before the delivery period ends.
Ya

Tidak
IX. 2 times a year for 3 year of preventive maintenance support consists of equipment faulty Replacement (Next Business Day) and software upgrade shall be provided.
Ya

Tidak
X. Support limited lifetime warranty
Ya

Tidak
5. SUPPORTING DOCUMENTS

TENDERER MUST PROVIDE THE FOLLOWING SUPPORTING DOCUMENTS AND MUST BE PRESENTED IN THIS DOKUMEN TEKNIKAL


** PLEASE DO NOT DISCLOSE COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC) FOR ALL DOCUMENTS REQUIRED HERE.
-
I. The tenderer shall provide all related catalogues/brochure, and the document must be presented in Dokumen Teknikal.
Ya

Tidak
II.
The tenderer must attach a Letter of Authorization (LOA) from Principal. This document must be presented in Dokumen Teknikal
Ya

Tidak
III. The tenderer must attach a Letter of Warranty (LoW) from Principal. This document must be presented in the Dokumen Teknikal.
Ya

Tidak
IV. The tenderer must attach at least ONE (1) related Engineer certification and Co-curriculum Vitae (CV) upon signing SURAT SETUJU TERIMA (SST)
Ya

Tidak