ADS-TDR-DOC-SPECTECH
  • UiTM/P1/PER/T/B/0625/0001
  • CADANGAN MENAIKTARAF SISTEM RANGKAIAN TANPA WAYAR (WIFI) DI KOLEJ-KOLEJ KEDIAMAN PELAJAR, UNIVERSITI TEKNOLOGI MARA CAWANGAN PULAU PINANG, KAMPUS PERMATANG PAUH, PULAU PINANG.
  • Access Network Switch / Workgroup Switch
  • 5. Access Switch 24 Port Gigabit Ethernet - RP4 PPauh
  • 2 Unit

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. GENERAL REQUIREMENT -
I. The scope of this project is to deliver, install and configure, testing and commissioning 24 port Access Switch.
Ya

Tidak
II. The tenderer must ensure the network access switch supplied is a genuine product from Principal.
Ya

Tidak
III. The tenderer must ensure the network access switch are workable with existing infra UiTM.
Ya

Tidak
IV. The tenderer must ensure the proposed network access switch is a new and not a refurbished or OEM product. The tenderer shall be responsible if there is any issue regarding the product’s authenticity.
Ya

Tidak
V. The tenderer needs to propose the optimum specification for the equipment to function and integrate well with the existing system. Should any component that needs to be added shall be proposed by the tenderer.
Ya

Tidak
VI. The tenderer must ensure the availability, operability, reliability and functionality of the supplied item components to function properly.
Ya

Tidak
VII. The tenderer must ensure that the network access switch proposed meets the characteristics or exceeds the required specifications.

**Please specify the exact model offered in the Dokumen Teknikal.
Ya

Tidak
VIII. All other related material, components or equipment, software and licensing are not specified but are required to ensure full integration of above item with proposed system requirements/application must be provided by the tenderer without any cost to UiTM.
Ya

Tidak
2. TECHNICAL REQUIREMENT -
I.
The Access switch MUST support at least 24-Port Gigabit and 4-Port 10G SFP+ uplink
Ya

Tidak
II. The Access switch fully support IPv4
Ya

Tidak
III.
The Access switch fully support IPv6
Ya

Tidak
IV. The Access switch support Layer 3 capability
Ya

Tidak
V. Access switch support multiple ip interface
Ya

Tidak
VI. Access switch support at least 63 entries IPV4 static route
Ya

Tidak
VII. Access switch support at least 20 entries IPV6 static route
Ya

Tidak
VIII. Access switch support at least 192 ARP entries
Ya

Tidak
IX. The Access switch MUST support at least 128 Gbps Switching Capacity
Ya

Tidak
X. The Access switch MUST support at least 128Mb flash memory
Ya

Tidak
XI. The Access switch MUST support port security maximum 256 entries
Ya

Tidak
XII. The Access switch MUST support SNMP version V1, V2c Or V3
Ya

Tidak
3. INSTALLATION, TESTING AND COMMISSIONING -
I. The tenderer shall provide a user operating / technical manual for UiTM referral upon project delivery.
Ya

Tidak
II. Tenderer must ensure all switches installation and configuration are done by professional engineers.
Ya

Tidak
III. The tenderer must make sure all works are done properly without any damage to the existing infra/equipment and shall be responsible for any damage that occur.
Ya

Tidak
IV. The tenderer shall prepare a complete and comprehensive commissioning report in the form of hardcopy and softcopy after delivery, installation, and testing to ensure the item and accompanying software or the whole package has adhered to the satisfaction of UNIVERSITI TEKNOLOGI MARA before the final acceptance.
Ya

Tidak
V. The comprehensive commissioning report must include the User Acceptance Test (UAT) and the tenderer must also include other additional documents as proof if requested by UiTM.
Ya

Tidak
VI. The Tenderer shall propose all additional or required licenses to ensure the switch can operate to the optimum.
Ya

Tidak
VII. All necessary adapters, cables, and accessories required shall be provided to make sure this project is well function.
Ya

Tidak
VIII. The tenderer must affix a sticker on every access switch with details such as company name/logo, project number, contact number, and device hostname. The sticker must be durable, long-lasting, and easy to read.
Ya

Tidak
4. WARRANTY AND TECHNICAL SUPPORT -
I. Three (3) years of maintenance support consists of equipment faulty replacement (Next Business Day 8X5XNBD) and software upgrades shall be provided.
Ya

Tidak
II. The Access switch shall have a warranty for a period from date of installation against defects in materials and/or workmanship.
Ya

Tidak
III. Tenderer MUST propose and provide a genuine product.
Ya

Tidak
IV. Tenderer must ensure all switches installation and configuration are done by professional engineers.
Ya

Tidak
V. Maintenance support is needed during and after the warranty period.
Ya

Tidak
VI. Free support through fax, email, and telephone must be provided during the warranty period.
Ya

Tidak
VII. The successful tenderer must be supported back-to-back by principal to provide maintenance services for equipment supplied.
Ya

Tidak
VIII.
If there is a delay in project delivery, Tenderer must apply for an extension at least 1 month before the delivery period ends.
Ya

Tidak
IX. 2 times a year for 3 year of preventive maintenance support consists of equipment faulty Replacement (Next Business Day) and software upgrade shall be provided.
Ya

Tidak
X. Support limited lifetime warranty
Ya

Tidak
5. SUPPORTING DOCUMENTS

TENDERER MUST PROVIDE THE FOLLOWING SUPPORTING DOCUMENTS AND MUST BE PRESENTED IN THIS DOKUMEN TEKNIKAL


** PLEASE DO NOT DISCLOSE COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC) FOR ALL DOCUMENTS REQUIRED HERE.
-
I. The tenderer shall provide all related catalogues/brochure, and the document must be presented in Dokumen Teknikal.
Ya

Tidak
II.
The tenderer must attach a Letter of Authorization (LOA) from Principal. This document must be presented in Dokumen Teknikal
Ya

Tidak
III. The tenderer must attach a Letter of Warranty (LoW) from Principal. This document must be presented in the Dokumen Teknikal.
Ya

Tidak
IV. The tenderer must attach at least ONE (1) related Engineer certification and Co-curriculum Vitae (CV) upon signing SURAT SETUJU TERIMA (SST)
Ya

Tidak