|
1. GENERAL REQUIREMENT
|
-
|
|
|
I. The scope of this project is to deliver, install and configure, test and commission SFP+ Transceiver Module Singlemode 10Gbps.
|
Ya Tidak
|
|
|
II. The tenderer must ensure the transceiver supplied is a genuine product from Principal.
|
Ya Tidak
|
|
|
III. The tenderer must ensure the transceiver are workable with existing infra UiTM.
|
Ya Tidak
|
|
|
IV. The tenderer must ensure the proposed transceiver is a new and not a refurbished or OEM product. The tenderer shall be responsible if there is any issue regarding the product’s authenticity.
|
Ya Tidak
|
|
|
V. The tenderer needs to propose the optimum specification for the equipment to function and integrate well with the existing system. Should any component that needs to be added shall be proposed by the tenderer.
|
Ya Tidak
|
|
|
VI. The tenderer must ensure the availability, operability, reliability and functionality of the supplied item components to function properly.
|
Ya Tidak
|
|
|
VII. The tenderer must ensure that the transceiver proposed meets the characteristics or exceeds the required specifications. **Please specify the exact model offered in the Dokumen Teknikal.
|
Ya Tidak
|
|
|
VIII. All other related material, components or equipment, software and licensing are not specified but are required to ensure full integration of above item with proposed system requirements/application must be provided by the tenderer without any cost to UiTM.
|
Ya Tidak
|
|
|
2. TECHNICAL REQUIREMENT
|
-
|
|
|
I. Transceiver Module 10G Singlemode :
Support IEEE 802.3ae
|
Ya Tidak
|
|
|
II. Support LC Type Connector
|
Ya Tidak
|
|
|
III. Wavelength support up to 1310nm.
|
Ya Tidak
|
|
|
IV. Singlemode Fiber type.
|
Ya Tidak
|
|
|
V. Support cabling distance maximum : 10km
|
Ya Tidak
|
|
|
VI. Support minimum -8.2 to -0.5dBm ouput optical power transmitter characteristics.
|
Ya Tidak
|
|
|
VII. Support minimum -12.6dBm optical receiver sensitivity
|
Ya Tidak
|
|
|
VIII. Hot-swappable.
|
Ya Tidak
|
|
|
IX. RoHS compliant.
|
Ya Tidak
|
|
|
3. INSTALLATION, TESTING AND COMMISSIONING
|
-
|
|
|
I. The tenderer shall provide a user operating / technical manual for UiTM referral upon project delivery.
|
Ya Tidak
|
|
|
II. Tenderer must ensure all switches installation and configuration are done by professional engineers.
|
Ya Tidak
|
|
|
III. The tenderer must make sure all works are done properly without any damage to the existing infra/equipment and shall be responsible for any damage that occur.
|
Ya Tidak
|
|
|
IV. The tenderer shall prepare a complete and comprehensive commissioning report in the form of hardcopy and softcopy after delivery, installation, and testing to ensure the item and accompanying software or the whole package has adhered to the satisfaction of UNIVERSITI TEKNOLOGI MARA before the final acceptance.
|
Ya Tidak
|
|
|
V. The comprehensive commissioning report must include the User Acceptance Test (UAT) and the tenderer must also include other additional documents as proof if requested by UiTM.
|
Ya Tidak
|
|
|
VI. The Tenderer shall propose all additional or required licenses to ensure the device can operate to the optimum.
|
Ya Tidak
|
|
|
VII. The tenderer must affix a sticker on every device with details such as company name/logo, project number, contact number, and device hostname. The sticker must be durable, long-lasting, and easy to read.
|
Ya Tidak
|
|
|
VIII. All necessary adapters, cables, and accessories required shall be provided to make sure this project is well function.
|
Ya Tidak
|
|
|
4. WARRANTY AND TECHNICAL SUPPORT
|
-
|
|
|
I. One (1) year of maintenance support consists of equipment faulty replacement (Next Business Day 8X5XNBD) and software upgrades should be provided.
|
Ya Tidak
|
|
|
II. The warranty period will begin after the installation and testing is complete.
|
Ya Tidak
|
|
|
III. Response time to attend to a problem call breakdown of equipment or component is maximum 4 hours. The support must be within 8 hours of working days.
|
Ya Tidak
|
|
|
IV. Free support through fax, email, and telephone must be provided during the warranty period.
|
Ya Tidak
|
|
|
5. SUPPORTING DOCUMENTS
TENDERER MUST PROVIDE THE FOLLOWING SUPPORTING DOCUMENTS AND MUST BE PRESENTED IN THIS DOKUMEN TEKNIKAL
** PLEASE DO NOT DISCLOSE COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC) FOR ALL DOCUMENTS REQUIRED HERE.
|
-
|
|
|
I. The tenderer shall provide all related catalogues/brochure, and the document must be presented in Dokumen Teknikal.
|
Ya Tidak
|
|
|
II. The tenderer must attach a Letter of Authorization (LOA) from Principal. This document must be presented in Dokumen Teknikal .
|
Ya Tidak
|
|
|
III. The tenderer must attach a Letter of Warranty (LoW) from Principal. This document must be presented in the Dokumen Teknikal.
|
Ya Tidak
|
|