1. GENERAL REQUIREMENT
|
-
|
|
|
I. The scope of this project is to deliver, install and configure, testing and commissioning DHCP Server
|
Ya Tidak
|
|
|
II. System setup and configuration must be performed and made good by the tenderer so that an adequate level of satisfaction and service quality is achieved
|
Ya Tidak
|
|
|
III. The system must support 32-Bit And 64-Bit applications in a single architecture. It also must confirm to standard requirements
|
Ya Tidak
|
|
|
IV. Tenderers need to propose the most optimum configuration for the equipment to function well. Should any component that need to be added such as memory, shall be proposed by tenderer
|
Ya Tidak
|
|
|
V. If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.
|
Ya Tidak
|
|
|
VI. All proposed equivalent items shall be specified in detail in terms of technical specifications, model, version number and etc.
|
Ya Tidak
|
|
|
VII. All other related material, components or equipment, software and cabling are not specified but are required to ensure full integration of above item with proposed system requirements/application must be provided by the tenderer without any cost to UiTM.
|
Ya Tidak
|
|
|
2. TECHNICAL REQUIREMENT
|
-
|
|
|
I. PROCESSOR
|
Ya Tidak
|
|
|
A ) At Least 1 x Intel Xeon Silver 4509Y 2.6G 8-core or Better
|
Ya Tidak
|
|
|
II. MEMORY
|
Ya Tidak
|
|
|
A ) Must support 5600MT/s RDIMMs
|
Ya Tidak
|
|
|
B ) Must comes with minimum: 16GB RDIMM, 5600MT/s, Single Rank
|
Ya Tidak
|
|
|
III. STORAGE AND OPTICAL DRIVE
|
Ya Tidak
|
|
|
A ) Must comes with minimum with 2 x 480GB SSD SATA 6Gbps
|
Ya Tidak
|
|
|
IV. POWER SUPPLY
|
Ya Tidak
|
|
|
A ) The proposed server must be delivered 600W hot-plug redundant power supplies (1+1)
|
Ya Tidak
|
|
|
B ) The proposed server must comes with Jumper Cord - C13/C14, 250V, 10A
|
Ya Tidak
|
|
|
V. I/O SLOT
|
Ya Tidak
|
|
|
A ) Must comes with Network Ports NIC 3.0 supported or better
|
Ya Tidak
|
|
|
B ) Must comes with Remote Management Network Port or better
|
Ya Tidak
|
|
|
C ) Must comes with USB 3.0 support or better
|
Ya Tidak
|
|
|
VI. NETWORK
|
Ya Tidak
|
|
|
A ) Must come with 1 x 1GbE 4-port BASE-T. or better
|
Ya Tidak
|
|
|
VII. OPERATING SYSTEM AND SOFTWARE
|
Ya Tidak
|
|
|
A ) The proposed server must come with Operating System (OS) Windows Server 2022 Standard, 16 CORE,No CAL or better.
|
Ya Tidak
|
|
|
B ) The tenderer must make sure all the integration is workable and successful.
|
Ya Tidak
|
|
|
C ) The operating system should be provided with original software media and user/technical manuals from the original software principal.
|
Ya Tidak
|
|
|
3. INSTALLATION, TESTING AND COMMISSIONING
|
-
|
|
|
I. Migrate all data current DHCP server to new DHCP Server
|
Ya Tidak
|
|
|
II. Required installation, testing and commissioning on-site for the supplied package
|
Ya Tidak
|
|
|
III. Note that all other related material, components and cablings, which are required to ensure full operation of the above package must be supplied
|
Ya Tidak
|
|
|
IV. Any cost related to installation and configuration shall be borne by the tenderer.
|
Ya Tidak
|
|
|
4. WARRANTY AND TECHNICAL SUPPORT
|
-
|
|
|
I. Tenderer must provide details of warranty. Take note that the minimum period for the warranty must be at least THREE (3) years
|
Ya Tidak
|
|
|
II. The tenderer shall be responsible for the installation commissioning and Test-Run of the equipment and accompanying software to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance. All costs on Installation, commissioning and test run shall be borne by the tenderer
|
Ya Tidak
|
|
|
5. SUPPORTING DOCUMENTS
TENDERER MUST PROVIDE THE FOLLOWING SUPPORTING DOCUMENTS AND MUST BE PRESENTED IN THIS DOKUMEN TEKNIKAL
** PLEASE DO NOT DISCLOSE COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC) FOR ALL DOCUMENTS REQUIRED HERE.
|
-
|
|
|
I. The tenderer shall provide all related catalogues/brochure, and the document must be presented in Dokumen Teknikal.
|
Ya Tidak
|
|
|
II. The tenderer must attach a Letter of Authorization (LOA) from Principal. This document must be presented in Dokumen Teknikal .
|
Ya Tidak
|
|
|
III. The tenderer must attach a Letter of Warranty (LoW) from Principal. This document must be presented in the Dokumen Teknikal.
|
Ya Tidak
|
|