1. PROJECT REQUIREMENT
|
-
|
|
|
I. The scope of this project is to deliver, install and configure, testing and commissioning 16 port Distribution Switch
|
Ya Tidak
|
|
|
II. The tenderer needs to propose the optimum specification for the equipment to function and integrate well with the existing system. Should any component that need to be added shall be proposed by the tenderer.
|
Ya Tidak
|
|
|
III. The proposed item must be new and not refurbished or OEM.
|
Ya Tidak
|
|
|
IV. The tenderer MUST ensure the availability, operability, reliability and functionality of the supplied item components to function properly.
|
Ya Tidak
|
|
|
V. All other related material, components or equipment, software and cabling are not specified but are required to ensure full integration of above item with proposed system requirements/application must be provided by the tenderer without any cost to UiTM.
|
Ya Tidak
|
|
|
VI. The tenderer must ensure that the distribution switch offered meets the characteristics or exceeds the required specifications. **Please specify the exact model offered in the tender document.
|
Ya Tidak
|
|
|
VII. The tenderer shall include dismantle work for existing / old network switch
|
Ya Tidak
|
|
|
2. TECHNICAL REQUIREMENT
|
-
|
|
|
I. The Distribution switch MUST support at least 16-Port Gigabit Ethernet Port 10G SFP/SFP+ Uplink
|
Ya Tidak
|
|
|
II. The Distribution switch MUST support Full-Featured Layer 3 Fiber Switch (routing table configuration only)
|
Ya Tidak
|
|
|
III. The Distribution switch support Layer 3 capability includes:
|
Ya Tidak
|
|
|
A ) Border Gateway Protocol Version 4 (BGPv4), and BGPv6
|
Ya Tidak
|
|
|
B ) Open Shortest Path First version 2 (OSPFv2), and OSPFv3
|
Ya Tidak
|
|
|
C ) Enhanced Interior Gateway Routing Protocol (EIGRP), and EIGRPv6
|
Ya Tidak
|
|
|
D ) Routing Information Protocol version 2 (RIPv2), and next generation [RIPng]
|
Ya Tidak
|
|
|
E ) Fully support IPv4
|
Ya Tidak
|
|
|
F ) Fully support IPv6
|
Ya Tidak
|
|
|
G ) IPv6 routing
|
Ya Tidak
|
|
|
IV. The Distribution switch fully supports 10Gbps for all 16-Port.
|
Ya Tidak
|
|
|
V. The switch support Full-Featured Layer 2+Fiber Switch
|
Ya Tidak
|
|
|
VI. The switch support minimum 240 Gbps Switching Capacity.
|
Ya Tidak
|
|
|
VII. The switch support minimum 512 SDRAM.
|
Ya Tidak
|
|
|
VIII. The switch support minimum 128MB flash memory
|
Ya Tidak
|
|
|
IX. The switch support Access Control List,Port Security,802.1X & RADIUS Authentication.
|
Ya Tidak
|
|
|
X. The switch support Energy Efficient Ethernet (802.3az) to improves energy savings when used with other compliant devices.
|
Ya Tidak
|
|
|
XI. The switch must support a minimum 16K MAC address table.
|
Ya Tidak
|
|
|
XII. The switch must support a minimum 9K jumbo frame.
|
Ya Tidak
|
|
|
XIII. The switch support Spanning Tree (STP), Rapid Spanning Tree (RSTP) & Multiple Spanning Tree(MSTP).
|
Ya Tidak
|
|
|
3. INSTALLATION, TESTING AND COMMISSIONING
|
-
|
|
|
I. Tenderer shall provide a user operating / technical manual for UiTM referral.
|
Ya Tidak
|
|
|
II. All other related software, systems, material, components, cabling and other accessories which arerequired to ensure full operation and integration with new or existing equipment of the item must be
provided by the tenderer
|
Ya Tidak
|
|
|
III. The tenderer shall be responsible for the installation, test-run and commissioning of the equipment andaccompanying software to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance.
All costs on installation, commissioning and test run shall be borne by tenderer during the warranty
period.
|
Ya Tidak
|
|
|
IV. Tenderer shall proposed all additional or required license to ensure the switch can operate to theoptimum.
|
Ya Tidak
|
|
|
V. Tenderer must document all switches configuration, management IP address and location in hard copyand must be submitted to UiTM.
|
Ya Tidak
|
|
|
VI. Any cost related to installation and configuration shall be borne by the tenderer.
|
Ya Tidak
|
|
|
4. WARRANTY AND TECHNICAL SUPPORT
|
-
|
|
|
I. One (1) years of maintenance support consists of equipment faulty replacement (Next Business Day8X5XNBD) and software upgrade shall be provided
|
Ya Tidak
|
|
|
II. The distribution switch shall have warranty for a period from date of installation against defects inmaterials and/or workmanship.
|
Ya Tidak
|
|
|
III. Tenderer MUST propose and provide a genuine product.
|
Ya Tidak
|
|
|
IV. Tenderer must ensure all switches installation and configuration are done by professional engineers.
|
Ya Tidak
|
|
|
V. Maintenance support is needed during and after the warranty period. Tenderers must provide details ofaddresses of locations of after sales service centres that shall be responsible for maintenance work for
these items during the warranty period.
|
Ya Tidak
|
|
|
VI. Free support through fax, email, telephone must be provided during the warranty period.
|
Ya Tidak
|
|
|
VII. The successful tenderer must be supported back to back by principal to provide maintenance services forequipment supplied.
|
Ya Tidak
|
|
|
VIII. If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before thedelivery period ends.
|
Ya Tidak
|
|
|
IX. 2 times a year for 2 years of preventive maintenance support consists of equipment faulty Replacement (Next Business Day) and software upgrade shall be provided.
|
Ya Tidak
|
|
|
5. SUPPORTING DOCUMENTS
TENDERER MUST PROVIDE THE FOLLOWING SUPPORTING DOCUMENTS AND MUST BE PRESENTED IN THIS DOKUMEN TEKNIKAL
** PLEASE DO NOT DISCLOSE COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC) FOR ALL DOCUMENTS REQUIRED HERE.
|
-
|
|
|
I. The tenderer shall provide all related catalogues/brouchere, and the document must be presented in Dokumen Teknikal
|
Ya Tidak
|
|
|
II. The tenderer must attach a Letter of Authorization (LoW) from Principal. This document must be presented in Dokumen Teknikal.
|
Ya Tidak
|
|
|
III. The tenderer must attach a Letter of Warranty (LoW) from Principal.This document must be presented in Dokumen Teknikal
|
Ya Tidak
|
|
|
IV. The tenderer must attach at least ONE (1) related Engineer certification and Co-curriculum Vitea (CV) upon signing SURAT SETUJU TERIMA (SST).
|
Ya Tidak
|
|