1. GENERAL REQUIREMENT
|
-
|
|
|
I. The scope of this project is to deliver, install and configure, testing and commissioning Wireless Access Point 2 x 2 x 2 MIMO.
|
Ya Tidak
|
|
|
II. The tenderer needs to propose the optimum specification for the equipment to function and integrate well with the existing system. Should any component that need to be added shall be proposed by the tenderer.
|
Ya Tidak
|
|
|
III. The tenderer must ensure the availability, operability, reliability and functionality of the supplied item components to function properly.
|
Ya Tidak
|
|
|
IV. The tenderer needs to propose heat map analysis before doing installation for wireless access point at every location or building involve in this project.
|
Ya Tidak
|
|
|
V. The propose location of wireless access point based on heat map analysis must be agree by UiTM
|
Ya Tidak
|
|
|
VI. All documents, design and heat map data during analysis must be presented to UiTM and being documented in hardcopy and softcopy
|
Ya Tidak
|
|
|
VII. The tenderer must ensure the proposed wireless access point is a new and not a refurbished or OEM product. The tenderer shall be responsible if there is any issue regarding the product’s authenticity.
|
Ya Tidak
|
|
|
VIII. All proposed software must complete a working model with educational licensing and discounts and must be a GENUINE COPY.
|
Ya Tidak
|
|
|
IX. The tenderer must ensure that the supplied hardware meets the specified specification requirements and if there is any problem regarding the hardware model, the tenderer must replace it with hardware that is equivalent or better than the specified specifications.
|
Ya Tidak
|
|
|
X. The tenderer needs to propose the optimum specification for the equipment to function and integrate well with the existing system. Should any component that need to be added shall be proposed by the tenderer.
|
Ya Tidak
|
|
|
XI. The tenderer must make sure all works are done properly without any damage to the existing infra/equipment and shall be responsible for any damage occurred.
|
Ya Tidak
|
|
|
XII. All other related material, components, cabling and accessories which are required to ensure full operation and integration with new or existing equipment of the item must be provided by the tenderer.
|
Ya Tidak
|
|
|
2. TECHNICAL REQUIREMENT
|
-
|
|
|
I. The wireless access point shall support IEEE 802.11be (WiFi-7) standard tri-band 2.4Ghz,5Ghz & 6Ghz concurrent 802.11be or better architecture to deliver better performance for advanced applications.
|
Ya Tidak
|
|
|
II. The wireless access point is able to support backward-compatibility 802.11ax with 11ac/a/b/g/n client devices.
|
Ya Tidak
|
|
|
III. The Wireless Access Point MUST support centralized cloud management and visualized monitoring
|
Ya Tidak
|
|
|
IV. Accessories
- All necessary adapters, cables, and accessories required shall be provided to make sure this project is well function.
- Tenderer shall include all related licensing cost required to ensure Access Point can operate with optimum.
|
Ya Tidak
|
|
|
V. The wireless access point support tri-band indoor use with 2 x 2 x 2 antenna
|
Ya Tidak
|
|
|
VI. The wireless access point can support up to 5800 Mbps in 6-GHz frequency band, 2900 Mbps in 5-GHz frequency band and 700 Mbps in 2.4-GHz frequency band.
|
Ya Tidak
|
|
|
VII. The wireless access point support antenna 2 x 2.4GHz with 5 dBi, 2 x 5GHz with 6 dBi and 2 x 6GHz with 6 dBi.
|
Ya Tidak
|
|
|
VIII. The wireless access point support physical interface such as:
- 1 x 10/100/1000 Base-T, RJ45 ethernet port
- 1 x DC Jack
- 1 x Reset Button
|
Ya Tidak
|
|
|
3. INSTALLATION, TESTING AND COMMISSIONING
|
-
|
|
|
I. The tenderer must ensure the installation of the wireless access point at the optimum level and if the installation of L Bracket is required in a particular location, the tenderer must provide it.
|
Ya Tidak
|
|
|
II. The tenderer shall provide a cage for every access point installed to avoid theft and the cage must come with a padlock.
|
Ya Tidak
|
|
|
III. System setup and configuration must be performed and made good by the tenderer so that good service quality is achieved.
|
Ya Tidak
|
|
|
IV. The tenderer must affix a sticker on the access point with details such as company name or logo, project number and device host-name. The sticker must be durable, long lasting and easy to read.
|
Ya Tidak
|
|
|
V. The tenderer must ensure all cable-ends and wireless access points are labeled and the label must be easily read, lasting, and waterproof.
|
Ya Tidak
|
|
|
VI. The tenderer shall prepare a complete and comprehensive commissioning report in a form of hardcopy and softcopy after delivery, installation, and testing to ensure the item and accompanying software or the whole package has adhered to the satisfaction of UNIVERSITI TEKNOLOGI MARA before the final acceptance.
|
Ya Tidak
|
|
|
VII. The comprehensive commissioning report must include the User Acceptance Test (UAT). The tenderer must also include other additional documents as proof if requested by UiTM.
|
Ya Tidak
|
|
|
VIII. The tenderer shall be responsible for the installation, test-run and commissioning of the equipment and accompanying software to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance. All costs on installation, commissioning and Test run shall be borne by the tenderer during the warranty period.
|
Ya Tidak
|
|
|
4. WARRANTY AND TECHNICAL SUPPORT
|
-
|
|
|
I. Minimum (3) year of maintenance support consists of equipment faulty replacement (Next Business Day 8x5xNBD) and software upgrade shall be provided.
|
Ya Tidak
|
|
|
II. Maintenance support is needed during and after the warranty period.
|
Ya Tidak
|
|
|
III. Free support through fax, email, telephone must be provided during the warranty period.
|
Ya Tidak
|
|
|
IV. A maximum of 4 hours response time to attend to problem call on breakdown of equipment or component is to abide by the tenderer.
|
Ya Tidak
|
|
|
V. The tenderer must be supported back-to-back by principal to provide maintenance services for equipment supplied.
|
Ya Tidak
|
|
|
5. SUPPORTING DOCUMENTS
TENDERER MUST PROVIDE THE FOLLOWING SUPPORTING DOCUMENTS AND MUST BE PRESENTED IN THIS DOKUMEN TEKNIKAL
** PLEASE DO NOT DISCLOSE COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC) FOR ALL DOCUMENTS REQUIRED HERE.
|
-
|
|
|
I. The tenderer shall provide all related catalogues/brochure, and the document must be presented in Dokumen Teknikal.
|
Ya Tidak
|
|
|
II. The tenderer must attach a Letter of Authorization (LOA) from Principal. This document must be presented in Dokumen Teknikal
|
Ya Tidak
|
|
|
III. The tenderer must attach a Letter of Warranty (LoW) from Principal. This document must be presented in the Dokumen Teknikal.
|
Ya Tidak
|
|
|
IV. The tenderer must attach at least ONE (1) related Engineer certification and Co-curriculum Vitae (CV) upon signing SURAT SETUJU TERIMA (SST)
|
Ya Tidak
|
|