ADS-TDR-DOC-SPECTECH
  • UiTM/B4/PER/T/B/0625/0001
  • MENAIK TARAF SISTEM RANGKAIAN TANPA WAYAR (WIFI) DI KOLEJ KEDIAMAN PELAJAR BAGI UiTM CAWANGAN SELANGOR KAMPUS SUNGAI BULOH, SELANGOR
  • Access Network Switch / Workgroup Switch
  • KSBKTI_Network Access Switch POE 24 Port Multi Gigabit RP4
  • 13 Unit

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. GENERAL REQUIREMENT -
I. The scope of this project is to deliver, install and configure, testing and commissioning 24 port Access Switch.
Ya

Tidak
II. The tenderer needs to propose the optimum specification for the equipment to function and integrate well with the existing system. Should any component that need to be added shall be proposed by the tenderer.
Ya

Tidak
III. The proposed item must be NEW and not refurbished or OEM.
Ya

Tidak
IV. The tenderer MUST ensure the availability, operability, reliability and functionality of the supplied item components to function properly.
Ya

Tidak
V. All other related material, components or equipment, software and cabling are not specified but are required to ensure full integration of above item with proposed system requirements/application must be provided by the tenderer without any cost to UiTM.
Ya

Tidak
VI. The tenderer must ensure that the access switch offered meets the characteristics or exceeds the required specifications. **Please specify the exact model offered in the tender document.
Ya

Tidak
VII. The tenderer shall include dismantle work for existing / old network switch.
Ya

Tidak
VIII. The delivery period must be within 18 weeks after the tenderer has received the offer letter from UiTM.
Ya

Tidak
IX. If there is a delay in project delivery, the tenderer must apply for an extension at least 1 month before the delivery period ends.
Ya

Tidak
X. ANY DOCUMENTS PRESENTED OR SUBMITTED BY THE TENDERER IN THIS DOKUMEN TEKNIKAL MUST NOT DISCLOSE ANY INFORMATION RELATED TO THE COMPANY’S NAME, LOGO, REGISTRATION NUMBER, ETC. THIS INFORMATION MUST BE ERASED AND NOT BE READABLE.
Ya

Tidak
2. TECHNICAL REQUIREMENT -
I. The switch MUST support Cloud Managed 24-Port Multi-Gigabit 410W
Ya

Tidak
II. The switch supports PoE + access ports.
Ya

Tidak
III. The Access switch support at least 4 x 10G SFP+ Ports for uplinks and all port are functioning without needed additional licenses.
Ya

Tidak
IV. The switch support 24 ports with 802.3af/at POE+
Ya

Tidak
V. The switch support at least 16 ports 10/100/1000 Mbps and 8 ports 100/1000/2500 Mbps
Ya

Tidak
VI. Fully support at least 1Gbps access ports and 10Gbps uplink ports.
Ya

Tidak
VII. The switch MUST support Flash Memory at least 128MB.
Ya

Tidak
VIII. The switch can support at least 152 Gbps Switching Capacity
Ya

Tidak
IX. The switch support Vlan from 1-4094 (at least 256 groups)
Ya

Tidak
X. The switch able to support Mac Address table at least 16K
Ya

Tidak
XI. The switch can support hybrid switch mode that can supports multiple management options.
Ya

Tidak
XII. The Access switch support PoE extended mode that allow to deploy the device over Ethernet cable at more extended range up to 250 meters.
Ya

Tidak
X. The switch can support Jumbo Frame at least 10K
Ya

Tidak
XIV. The switch support PD lifeguard that real-timely monitors the status of the device and auto reboot the device when it is down.
Ya

Tidak
XV. The switch can support Voice VLAN for fast and reliable deployment of VoIP
Ya

Tidak
XVI. The switch can monitor realtime CPU and RAM.
Ya

Tidak
XVII. The switch has the ability to continuous PoE power supplies the device in operation without interruption of the switch rebooting during switch firmware upgrading.
Ya

Tidak
XVIII. The switch can support Advanced Topology to monitor the whole network including 3rd-Party Devices.
Ya

Tidak
XIX. The switch support ONE click push configuration from faulty unit to new replacement unit.
Ya

Tidak
XX. The switch can support Intelligent Diagnostics.
Ya

Tidak
XXI. The switch can support Trial Zone Firmware upgrade that give user experience new upgrade before confirm upgrade to latest version.
Ya

Tidak
XXII. The switch support Port Security with maximum 256 Entries.
Ya

Tidak
XXIII. The switch must supported Layer 2 features.
Ya

Tidak
XXIV. The switch support IGMP Snooping and IGMP Multicast Forwarding
Ya

Tidak
XXV. The switch can support Link Aggregation / port channel.
Ya

Tidak
XXVI. The switch support advanced Access Control List (ACL) such as MAC Based ACL, IPV4/IPV6 Based ACL, ACL Binding and Time Based ACL.
Ya

Tidak
3. INSTALLATION, TESTING AND COMMISSIONING -
I. Tenderer shall provide a user operating / technical manual for UiTM referral.
Ya

Tidak
II. All other related software, systems, material, components, cabling and other accessories which are required to ensure full operation and integration with new or existing equipment of the item must be provided by the tenderer.
Ya

Tidak
III. The tenderer shall be responsible for the installation, test-run and commissioning of the equipment and accompanying software to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance.
Ya

Tidak
IV. All costs on installation, commissioning and test run shall be borne by tenderer during the warranty period.
Ya

Tidak
V. Tenderer shall proposed all additional or required license to ensure the switch can operate to the optimum.
Ya

Tidak
VI. Tenderer must document all switches configuration, management IP address and location in hard copy and must be submitted to UiTM.
Ya

Tidak
VII. Any cost related to installation and configuration shall be borne by the tenderer.
Ya

Tidak
VIII. Tenderer are required to provide training for the use, maintenance, troubleshoot or similar environment for the item.
Ya

Tidak
IX. Training should be conducted for three (3) persons of technical staff or more assigned by UiTM.
Ya

Tidak
X. The duration of training at least one (1) working days (8 hours per day x 1 days= 8 hours).
Ya

Tidak
XI. The duration / time / training syllabus / number of participants for the training would be discussed on delivery of the equipment
Ya

Tidak
4. WARRANTY AND TECHNICAL SUPPORT -
I. Minimum of three (3) years of maintenance support consists of equipment faulty replacement (Next Business Day8X5XNBD) and software upgrade shall be provided.
Ya

Tidak
II. Response time to attend to a problem call breakdown of equipment or component is MAXIMUM 4 hours. The support must be within 8 hours of working days.
Ya

Tidak
III. The switch shall have warranty for a period from date of installation against defects inmaterials and/or workmanship.
Ya

Tidak
IV. Tenderer MUST propose and provide a genuine product.
Ya

Tidak
V. Tenderer must ensure all switches installation and configuration are done by professional engineers.
Ya

Tidak
VI. Maintenance support is needed during and after the warranty period. Tenderers must provide details of addresses of locations of after sales service centres that shall be responsible for maintenance work for these items during the warranty period.
Ya

Tidak
VII. Free support through fax, email, telephone must be provided during the warranty period.
Ya

Tidak
VIII. The successful tenderer must be supported back to back by principal to provide maintenance services for equipment supplied.
Ya

Tidak
IX. If there is a delay in project delivery, Tenderer must apply for extension at least 1 month before the delivery period ends.
Ya

Tidak
X. 2 times a year for 2 years of preventive maintenance support consists of equipment faulty Replacement (Next Business Day) and software upgrade shall be provided.
Ya

Tidak
5. SUPPORTING DOCUMENTS

TENDERER MUST PROVIDE THE FOLLOWING SUPPORTING DOCUMENTS AND MUST BE PRESENTED IN THIS DOKUMEN TEKNIKAL
** PLEASE DO NOT DISCLOSE COMPANY INFORMATION BY ERASING THE INFORMATION RELATED TO COMPANY (NAME, LOGO, REGISTRATION NUMBER, ETC) FOR ALL DOCUMENTS REQUIRED HERE.
-
I. The tenderer shall provide all related catalogues/brouchere, and the document must be presented in Dokumen Teknikal
Ya

Tidak
II. The tenderer must attach a Letter of Authorization (LoW) from Principal. This document must be presented in Dokumen Teknikal.
Ya

Tidak
III. The tenderer must attach a Letter of Warranty (LoW) from Principal.This document must be presented in Dokumen Teknikal
Ya

Tidak
IV. The tenderer must attach at least ONE (1) related Engineer certification and Co-curriculum Vitea (CV) upon signing SURAT SETUJU TERIMA (SST).
Ya

Tidak