ADS-TDR-DOC-SPECTECH
  • UiTM/A1/PER/T/B/0625/0001
  • MEMBEKAL, MENGHANTAR, MEMBUKA, MEMASANG DAN MENGUJILARI SERTA MEMBERI LATIHAN PENGGUNAAN PERALATAN SET SIARAYA BAGI UNIVERSITI TEKNOLOGI MARA, CAWANGAN PERAK, KAMPUS SERI ISKANDAR.
  • Audio Digital Mixer /Audio Visual Mixer / Power Mixer
  • 32 Channel Digital Mixer c/w stage box digital (DIAK)
  • 1 Set

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. GENERAL REQUIREMENT -
I. The proposed equipment(s) must have a local Services Centre near UiTM PERAK being supplied to in providing a full technical support and maintenance.
Ya

Tidak
II. Brochure(s) must be attached upon document submission.
Ya

Tidak
III. Please include a drawing connection diagram between the components. (Compulsory)
-
2. TECHNICAL SPECIFICATION -
I.
Processing
-
A )
Input Processing Channels
32 Input Channels, 8 Aux
Channels, 8 FX Return Channels
Ya

Tidak
B )
Output Processing Channels
8 / 16
Ya

Tidak
C )
16 Aux Buses, 6 Matrices, Main LRC
Ya

Tidak
D )
Internal Effects Engines :
8 / 16 (True Stereo / Mono)
Ya

Tidak
E )
Signal Processing : 40-Bit Floating Point
Ya

Tidak
F )
A/D Conversion (8-channel, 96 kHz ready) :
24-Bit, 114 dB Dynamic Range, A-weighted*
Ya

Tidak
G )
D/A Conversion (stereo, 96 kHz ready) :
24-Bit, 120 dB Dynamic Range, A-weighted*
Ya

Tidak
H )
I/O Latency (Console Input to Output) : 0.8 ms
Ya

Tidak
I )
Network Latency (Stage Box In > Console > Stage Box Out) : 1.1 ms
Ya

Tidak
II.
Connectors
-
A )
Microphone Preamplifier (XLR) : 16
Ya

Tidak
B )
Talkback Microphone Input (XLR) : 1
Ya

Tidak
C )
RCA Inputs / Outputs : 2 / 2
Ya

Tidak
D )
XLR Outputs : 8
Ya

Tidak
E )
Monitoring Outputs (XLR / ¼" TRS Balanced) : 2/2
Ya

Tidak
F )
Aux Inputs/Outputs (¼" TRS Balanced) : 6 / 6
Ya

Tidak
G )
Phones Output (¼" TRS) : 1 (Stereo)
Ya

Tidak
H )
AES50 Ports (Klark Teknik SuperMAC) : 2
Ya

Tidak
I )
Expansion Card Interface : 32 Channel Audio Input / Output
Ya

Tidak
J )
MIDI Inputs / Outputs : 1 / 1
Ya

Tidak
K )
USB Type A (Audio and Data Import / Export) : 1
Ya

Tidak
L )
USB Type B, rear panel, for remote control : 1
Ya

Tidak
M )
Ethernet, RJ45, rear panel, for remote control : 1
Ya

Tidak
III.
Display
-
A )
Main Screen : 5" TFT LCD, 800 x 480 Resolution, 262k Colours
Ya

Tidak
B )
Channel LCD Screen : 128 x 64 LCD with RGB Colour Backlight
Ya

Tidak
C )
Main Meter : 18 Segment (-45 dB to Clip)
Ya

Tidak
IV.
Power
-
A )
Switch-Mode Power Supply : Auto-Ranging 100-240 VAC (50/60 Hz) ± 10%
Ya

Tidak
B )
Power Consumption : 70 W
Ya

Tidak
3. SUPPORTING EQUIPMENT -
I. All equipment must integrate with each other to complete the system such as custom made console table, patch panels, wall-box, cabling, connectors, racking system, flight case and etc.
Ya

Tidak
II. Digital Stage Box
Ya

Tidak
A )
XLR inputs, programmable mic preamps : 16
Ya

Tidak
B )
XLR outputs : 8
Ya

Tidak
C )
Phones outputs, 1/4" TRS : 1 (mono)
Ya

Tidak
D )
AES50 ports, SuperMAC : 2
Ya

Tidak
E )
MIDI inputs / outputs : 1 / 1
Ya

Tidak
F )
ADAT Toslink outputs (2 x 8 Ch) : 2
Ya

Tidak
G )
USB type B, rear panel, for system updates : 1
Ya

Tidak
H )
Display : 4-digit, 7-segment, LED
Ya

Tidak
I )
Front status LEDs :
  • AES50-A, red/green
  • AES50-B, red/green
  • HA Locked, red
  • SN Master, green
  • Splitter, orange
  • Out +16, orange
  • Out +8, orange
Ya

Tidak
J )
Rear panel : Splitter mode, orange
Ya

Tidak
K )
Power
Switch-mode autorange power supply : 100-240 V (50/60 Hz)
Power consumption : 45 W
Ya

Tidak
III. Patch panel : A patch panel/node must be provided for connection from wall to digital mixer (Control room).
Ya

Tidak
4. SUPPLIED ACCESSORIES -
I. Protection cover for mixer
Ya

Tidak
II. CAT6 cable 30meter c/w roller and socket
Ya

Tidak
5. ADDITIONAL ACCESSORIES -
I. Custom Flight Case for Digital Mixer and Stage Box Digital c/w accessories
-
A ) Digital Stage Box  
Custom Flight Case c/w accessories  
Rack Form Factor : 2U  
Rail Placement : Front, Rear  
Heavy duty corners  
Material of Construction : Aluminum, plywood
Ya

Tidak
B ) Digital Mixer Console
  • 9mm plywood construction with laminated plastic covering 35mmx35mm aluminum section  
  • Heavy duty corners  
  • Recessed spring action Handles per Side
Ya

Tidak
II. Audio Cable for PC
-
A ) 1/4" TRS(Stereo) to 3.5mm Mini Jack (2 meter) - (2 Set)
Ya

Tidak
B ) XLR (Stereo) to 3.5mm Mini Jack (2 meter) - (2 Set)
Ya

Tidak
6. CABLING AND INSTALLATION -
I. Vendor is required to provide full Video, Audio and Computer Cabling, Connector, Cable Marking, Installation and termination the above system with stated brand name in working condition with relevant connectivity and accepted by UiTM.
Ya

Tidak
II. Vendor must install and integrate all equipment supplied to be a one complete system.
Ya

Tidak
III. Vendor must ensure that all terminal or interface work meet UiTM requirement. Vendor must add and bear the cost for additional accessories and extender need if the proposed quantity not enough.
Ya

Tidak
IV. To install and cabling, all item must use high quality cable. Vendors are responsible for any mistake and accidence that happen during installation period.
Ya

Tidak
V. All equipment connection and interacking should be properly terminated with relevant connectors. Proper labeling should be applied upon termination.
Ya

Tidak
VI. All equipment customized brackets or panels shall be proper install and adequate to withstand the weight of the equipment where drawings should be needed for approval before any works be carried out.
Ya

Tidak
VII. All system requires new electrical supply directly from master DB unit to avoid humming and noise to the system. Looping as strictly prohibited.
Ya

Tidak
VIII. Entire suggested equipments shall have a proper ventilation.
Ya

Tidak
IX. Vendor must integrates the supplied equipment with existing system to be a one complete system and any additional cabling if required is borne by the vendor.
Ya

Tidak
X. PROJECT REQUIREMENT
The Contractor shall provide all labor, material tools, equipment, supervision and other related items required to complete the project as per scope of work and specifications. Contractors are advised to visit the site, verify the existing site conditions to develop their proposal on installing the new speakers system.
Ya

Tidak
A ) Dismantle all the existing speakers at the Front of House Stage, Delay Speaker (Side of Hall), Stage Speaker, Audience Speaker, Chain Hoist, Cabling and all equipment in AV control room including mixers and power amplifiers for new installation as described below (all item should be well organized and deliver into UiTM store).
Ya

Tidak
B ) Observe manufacturer's recommendations in regard to preparation of surfaces to receive new speaker system and all relevant equipment.
Ya

Tidak
C ) Install new speaker, use only recommended mounting and installation methods and hardware with the required alignment capability for a given speaker in a given application. This allows proper aiming and acoustic performance for the speaker systems.
Ya

Tidak
D ) The speaker cabling shall include all necessary item for a complete installation such as a proper trunking/tray/conduit, speaker point (speakon faceplate), cable management (comply with chain hoist system), speaker plug twist lock (neutrik or equivalent), pools cable and other accessories required to connect specified end to end installation.
Ya

Tidak
7. SUPPORT AND WARRANTY -
I. Warranty for the equipment is expected to be at least one (1) year.
Ya

Tidak
II. Must provide comprehensive and extensive after sales service on labour and overall parts.
Ya

Tidak
III. Must provide warranty letter direct from local or authorized manufacturer or distributor upon submission of tender documents and on delivery of the equipment.
Ya

Tidak
IV. Cost of delivery of the equipment is borne by the vendor.
Ya

Tidak
8. TRAINING -
I. Vendors are required to provide training for the use, maintenance, troubleshoot and repair of the equipment to the staff of UiTM.
Ya

Tidak
II. Training should be conducted five (5) persons of staff or more assigned by UiTM.
Ya

Tidak
III. The duration of training at least two (2) working days (8 hours per day x 2 days = 16 hours).
Ya

Tidak
IV. The duration / time / training syllabus / number of participants for the training would be discussed on delivery of the equipment.
Ya

Tidak