|
1. GENERAL REQUIREMENT
|
-
|
|
|
I. The proposed equipment(s) must have a local Services Centre near UiTM PERAK being supplied to in providing a full technical support and maintenance.
|
Ya Tidak
|
|
|
II. Brochure(s) must be attached upon document submission.
|
Ya Tidak
|
|
|
2. TECHNICAL SPECIFICATION
|
-
|
|
|
I. 128 dB Max SPL
|
Ya Tidak
|
|
|
II. 1400 Watt 2-way power
|
Ya Tidak
|
|
|
III. DSP Processing
|
Ya Tidak
|
|
|
IV. 12" woofer, high power 2.5" voice coil
|
Ya Tidak
|
|
|
V. 8 x 2" ultra compact fullrange 1.0" voice coil
|
Ya Tidak
|
|
|
3. SUPPORTING EQUIPMENT
|
-
|
|
|
I. Power Cabling - Cables with CEE connector ( 20 Meter )
|
Ya Tidak
|
|
|
4. SUPPLIED ACCESSORIES
|
-
|
|
|
I. Cable Signal with accessories ( 20 Meter )
|
Ya Tidak
|
|
|
II. Pole Mount
|
Ya Tidak
|
|
|
III. Power cord
|
Ya Tidak
|
|
|
5. ADDITIONAL ACCESSORIES
|
-
|
|
|
I. Flight Case
|
Ya Tidak
|
|
|
II. Rain cover - Canvas
|
Ya Tidak
|
|
|
6. CABLING AND INSTALLATION
|
-
|
|
|
I. Vendor is required to provide full Video, Audio and Computer Cabling, Connector, Cable Marking, Installation and termination the above system with stated brand name in working condition with relevant connectivity and accepted by UiTM
|
-
|
|
|
II. Vendor must install and integrate all equipment supplied to be a one complete system.
|
Ya Tidak
|
|
|
III. Vendor must ensure that all terminal or interface work meet UiTM requirement. Vendor must add and bear the cost for additional accessories and extender need if the proposed quantity not enough.
|
Ya Tidak
|
|
|
IV. To install and cabling, all item must use high quality cable. Vendors are responsible for any mistake and accidence that happen during installation period.
|
Ya Tidak
|
|
|
V. All equipment connection and interacking should be properly terminated with relevant connectors. Proper labeling should be applied upon termination.
|
Ya Tidak
|
|
|
VI. All equipment customized brackets or panels shall be proper install and adequate to withstand the weight of the equipment where drawings should be needed for approval before any works be carried out.
|
Ya Tidak
|
|
|
VII. Entire suggested equipments shall have a proper ventilation.
|
Ya Tidak
|
|
|
VIII. Vendor must integrates the supplied equipment with existing system to be a one complete system and any additional cabling if required is borne by the vendor.
|
Ya Tidak
|
|
|
7. SUPPORT AND WARRANTY
|
-
|
|
|
I. Warranty for the equipment is expected to be at least one (1) year.
|
Ya Tidak
|
|
|
II. Must provide comprehensive and extensive after sales service on labour and overall parts.
|
Ya Tidak
|
|
|
III. Must provide warranty letter direct from local or authorized manufacturer or distributor upon submission of tender documents and on delivery of the equipment
|
Ya Tidak
|
|
|
IV. Cost of delivery of the equipment is borne by the vendor.
|
Ya Tidak
|
|
|
8. TRAINING
|
-
|
|
|
I. Vendors are required to provide training for the use, maintenance, troubleshoot and repair of the equipment to the staff of UiTM.
|
Ya Tidak
|
|
|
II. Training should be conducted for five (5) persons of staff or more assigned by UiTM.
|
Ya Tidak
|
|
|
III. The duration of training at least two (2) working days (8 hours per day x 2 days = 16 hours).
|
Ya Tidak
|
|
|
IV. The duration / time / training syllabus / number of participants for the training would be discussed on delivery of the equipment.
|
Ya Tidak
|
|