ADS-TDR-DOC-SPECTECH
  • UiTM/A1/PER/T/B/0625/0001
  • MEMBEKAL, MENGHANTAR, MEMBUKA, MEMASANG DAN MENGUJILARI SERTA MEMBERI LATIHAN PENGGUNAAN PERALATAN SET SIARAYA BAGI UNIVERSITI TEKNOLOGI MARA, CAWANGAN PERAK, KAMPUS SERI ISKANDAR.
  • Speaker / Loud Speaker / Loud Hailer
  • ACTIVE TWO WAY PORTABLE ARRAY SYSTEM 1400W (Mobile)
  • 2 Set

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. GENERAL REQUIREMENT -
I. The proposed equipment(s) must have a local Services Centre near UiTM PERAK being supplied to in providing a full technical support and maintenance.
Ya

Tidak
II. Brochure(s) must be attached upon document submission.
Ya

Tidak
2. TECHNICAL SPECIFICATION -
I. 128 dB Max SPL
Ya

Tidak
II. 1400 Watt 2-way power
Ya

Tidak
III. DSP Processing
Ya

Tidak
IV. 12" woofer, high power 2.5" voice coil
Ya

Tidak
V. 8 x 2" ultra compact fullrange 1.0" voice coil
Ya

Tidak
3. SUPPORTING EQUIPMENT -
I. Power Cabling - Cables with CEE connector ( 20 Meter )
Ya

Tidak
4. SUPPLIED ACCESSORIES -
I. Cable Signal with accessories ( 20 Meter )
Ya

Tidak
II. Pole Mount
Ya

Tidak
III. Power cord
Ya

Tidak
5. ADDITIONAL ACCESSORIES -
I. Flight Case
Ya

Tidak
II. Rain cover - Canvas
Ya

Tidak
6. CABLING AND INSTALLATION -
I. Vendor is required to provide full Video, Audio and Computer Cabling, Connector, Cable Marking, Installation and termination the above system with stated brand name in working condition with relevant connectivity and accepted by UiTM
-
II. Vendor must install and integrate all equipment supplied to be a one complete system.
Ya

Tidak
III. Vendor must ensure that all terminal or interface work meet UiTM requirement. Vendor must add and bear the cost for additional accessories and extender need if the proposed quantity not enough.
Ya

Tidak
IV. To install and cabling, all item must use high quality cable. Vendors are responsible for any mistake and accidence that happen during installation period.
Ya

Tidak
V. All equipment connection and interacking should be properly terminated with relevant connectors. Proper labeling should be applied upon termination.
Ya

Tidak
VI. All equipment customized brackets or panels shall be proper install and adequate to withstand the weight of the equipment where drawings should be needed for approval before any works be carried out.
Ya

Tidak
VII. Entire suggested equipments shall have a proper ventilation.
Ya

Tidak
VIII. Vendor must integrates the supplied equipment with existing system to be a one complete system and any additional cabling if required is borne by the vendor.
Ya

Tidak
7. SUPPORT AND WARRANTY -
I. Warranty for the equipment is expected to be at least one (1) year.
Ya

Tidak
II. Must provide comprehensive and extensive after sales service on labour and overall parts.
Ya

Tidak
III. Must provide warranty letter direct from local or authorized manufacturer or distributor upon submission of tender documents and on delivery of the equipment
Ya

Tidak
IV. Cost of delivery of the equipment is borne by the vendor.
Ya

Tidak
8. TRAINING -
I. Vendors are required to provide training for the use, maintenance, troubleshoot and repair of the equipment to the staff of UiTM.
Ya

Tidak
II. Training should be conducted for five (5) persons of staff or more assigned by UiTM.
Ya

Tidak
III. The duration of training at least two (2) working days (8 hours per day x 2 days = 16 hours).
Ya

Tidak
IV. The duration / time / training syllabus / number of participants for the training would be discussed on delivery of the equipment.
Ya

Tidak