|
1. GENERAL REQUIREMENT
|
-
|
|
|
I. The proposed equipment(s) must have a local Services Centre near UiTM PERAK being supplied to in providing a full technical support and maintenance.
|
Ya Tidak
|
|
|
II. Brochure(s) must be attached upon document submission.
|
Ya Tidak
|
|
|
2. TECHNICAL SPECIFICATION
|
-
|
|
|
I. Frequency Response : 35 Hz รท 120 Hz ,Max SPL @ 1m : 135 dB (Min)
|
Ya Tidak
|
|
|
II. Woofer : 1 x 18''
|
Ya Tidak
|
|
|
III. Input signal : bal/unbal
|
Ya Tidak
|
|
|
IV. Total Power : 2200 W Peak, 1100 W RMS (Min)
|
Ya Tidak
|
|
|
V. Standard compliance
- Safety agency : CE compliant
|
Ya Tidak
|
|
|
VI. Cabinet/Case Material : Plywood
|
Ya Tidak
|
|
|
VII. Pole mount/Cap : M20 thread
|
Ya Tidak
|
|
|
VIII. Connections : Powercon TRUE1 TOP IN/OUT
|
Ya Tidak
|
|
|
3. SUPPORTING EQUIPMENT
|
-
|
|
|
I. Power Cabling for Subwoofer - Cable with CEE connector (20 Meter)
|
Ya Tidak
|
|
|
II. Signal Cable with accessories - Cable (20 Meter)
|
Ya Tidak
|
|
|
4. SUPPLIED ACCESSORIES
|
-
|
|
|
I. Custom Rain Cover - Canvas
|
Ya Tidak
|
|
|
II. Power Cord
|
Ya Tidak
|
|
|
III. Pole Mount
|
Ya Tidak
|
|
|
5. ADDITIONAL ACCESSORIES
|
-
|
|
|
I. Custom Flight Case
|
Ya Tidak
|
|
|
6. SUPPORT AND WARRANTY
|
-
|
|
|
I. Warranty for the equipment is expected to be at least one (1) year.
|
Ya Tidak
|
|
|
II. Must provide comprehensive and extensive after sales service on labour and overall parts.
|
Ya Tidak
|
|
|
III. Must provide warranty letter direct from local or authorized manufacturer or distributor upon submission of tender documents and on delivery of the equipment.
|
Ya Tidak
|
|
|
IV. Cost of delivery of the equipment is borne by the vendor.
|
Ya Tidak
|
|
|
7. TRAINING
|
-
|
|
|
I. Vendors are required to provide training for the use, maintenance, troubleshoot and repair of the equipment to the staff of UiTM.
|
Ya Tidak
|
|
|
II. Training should be conducted for five (5) persons of staff or more assigned by UiTM.
|
Ya Tidak
|
|
|
III. The duration of training at least two (2) working days (8 hours per day x 2 days = 16 hours).
|
Ya Tidak
|
|
|
IV. The duration / time / training syllabus / number of participants for the training would be discussed on delivery of the equipment.
|
Ya Tidak
|
|