ADS-TDR-DOC-SPECTECH
  • UiTM/B1/PER/T/B/0625/0018
  • Cadangan Membekal, Menghantar, Memasang, Mengujilari Dan Menyelenggara Peralatan Pengajaran dan Pembelajaran Untuk Makmal Fabrikasi (Semikonduktor 14.2), Fakulti Kejuruteraan Elektrik, UiTM Shah Alam
  • Furnace
  • 2025 New-Semiconductor Fabrication. Diffusion Furnace
  • 1 Set

Maklumat Spesifikasi Teknikal

  
Keterangan Calit Tawaran/Catatan
1. GENERAL REQUIREMENTS Ya

Tidak
I. Vendors must comply with all the requirements specified in this tender document
Ya

Tidak
II. Vendors must bear all costs of supplying the specified quantity of items to UiTM. Such costs shall include the costs of delivery, installation, commissioning, training, troubleshoot and maintenance work (including parts labour and on-site service) within the specified warranty period
Ya

Tidak
2. GENERAL SPECIFICATION Ya

Tidak
I. Ideally the High-temperature diffusion annealing furnaces for 4-inch silicon wafers or smaller
Ya

Tidak
II. The system should be designed with following mode
Ya

Tidak
III. Solid dopant process
Ya

Tidak
IV. Spin on dopant
Ya

Tidak
V. System should come with Touch Screen with Industrial PC and Programmable Logic Controller that can support diffusion furnace operation.
Ya

Tidak
VI. Data logging and Analysis with computer data acquisition
Ya

Tidak
VII. System should be able to deliver the following process
Ya

Tidak
A ) P type or N type doping process
Ya

Tidak
B ) Continuous annealing processes.
Ya

Tidak
C ) Doping +/- 5% uniformity across 4-inch wafer or better
Ya

Tidak
3. SYSTEM SPECIFICATION Ya

Tidak
I. System meet the following substrate
Ya

Tidak
A ) A minimum size of 4” inch or better
Ya

Tidak
B ) Aat least 12 wafer/batch for solid dopant or better
Ya

Tidak
C ) At least 25 wafer/batch for spin on dopant or better
Ya

Tidak
D ) Quartz boat to be provided
Ya

Tidak
II. The furnace should meet cleanroom requirements with the following properties
Ya

Tidak
A ) Enclosed shell housing
Ya

Tidak
B ) At least 200 mm isothermal/constant zone present in the system or better
Ya

Tidak
C ) Measurement accuracy less or equal to ±1.0°C
Ya

Tidak
D ) The furnace heating rate within 10°C/minute or better
Ya

Tidak
E ) A minimum of 3 external Thermocouple(TC) for zone control or better
Ya

Tidak
F ) Profile Thermocouple(TC) with 3-point measurement or better
Ya

Tidak
G ) Closed pigtail tube design or similar
Ya

Tidak
III. Process Tube:
Ya

Tidak
A ) The system mainframe should have a double-stack tube capability for the oxidation and diffusion process.
Ya

Tidak
B ) The upgradeability of the second tube should be able to be performed on-site
Ya

Tidak
IV. Ideally the temperature control profile should meet the following
Ya

Tidak
A ) Temperature accuracy less or equal to ±0.5°C
Ya

Tidak
B ) Preferably dual PID(Proportional-Integral-Derivative) temperature control with internal and external TC cascade control
Ya

Tidak
C ) Over-temp protection, TC(Thermocouple) disconnection, with manual reset should be provided.
Ya

Tidak
D ) Process tempereture at least 200°C to 1300°C or better.
Ya

Tidak
V. Sample Loading should meet the following
Ya

Tidak
A ) Automatic boat delivery with sensor protection interlock
Ya

Tidak
B ) System should comes with stepper motor for precise loading position.
Ya

Tidak
C ) Stops switch and limit protection sensor should be provided.
Ya

Tidak
D ) Front loading seal door with lock.
Ya

Tidak
VI. Process Gas and Pneumatic:
Ya

Tidak
A ) At least 2 gas channels are required to flow N2, and O2.
Ya

Tidak
B ) All gas to be controlled by Mass Flow Controller within 10 to 20 SLM (Standard Liters per Minute) or better.
Ya

Tidak
C ) All gas internal piping should be using an Electropolish Grade of SUS316
Ya

Tidak
D ) Gas filter for Oxygen and Nitrogen to be provided
Ya

Tidak
E ) Solid Dopant with for P-Type and N-Type to be provided
Ya

Tidak
VII. Control System:
Ya

Tidak
A ) User administration module must be provided with sub-account permission.
Ya

Tidak
B ) System should come with at least 50 programs and 40 steps or better.
Ya

Tidak
C ) Suppliers need to demonstrate the process resolution acceptance upon commissioning.
Ya

Tidak
D ) All wafers and consumables are to be provided by the supplier during the demonstration
Ya

Tidak
E ) A Human Machine Interface (HMI) should control the following parameters:
1)Temperature, time, ramp gradient, etc
2)Recipe editor and data logging capability
3)Process cycle diagram and graph
4)Remote online capability for operation, support and troubleshooting
5)Data recoding with USB flash drive capability
6)Signage and alarm should be provided
Ya

Tidak
VIII. Safety and Interlock
Ya

Tidak
A ) Over-temp protection of the process tube must be provided
Ya

Tidak
B ) Short Circuit Protection must be provided as standard.
Ya

Tidak
C ) Manual Emergency Stop must be provided as standard
Ya

Tidak
D ) Recipe lock provided
Ya

Tidak
IX. Facilities Requirement
Ya

Tidak
A ) Supplier needs to provide a suitable water recirculating chiller with at least 0.4 Mpa and 15 L/min flow rate for the system or better
Ya

Tidak
B ) All hook-up and facilities requirements need to be provided by the supplier.
Ya

Tidak
C ) Exhaust requirements such as heat exhaust, and process exhaust must be provided and hooked up by the supplier.
Ya

Tidak
D ) All gas piping requirements and connections from existing facilities to the system are to be provided by the supplier. A standard gas stick with inline pressure gauge with bright annealing SUS 316 gas pipe are to be used.
Ya

Tidak
E ) The complete system should be operable using the Malaysia power rating of 240 V/415V at 50Hz with Malaysia standard 3-pin/isolator without the use of any auxiliary equipment such as a step-down transformer, etc
Ya

Tidak
X. The furnace should come with at least 3 years annual preventive maintenance or better.
Ya

Tidak
XI. Ideally the preventive maintenance should include
Ya

Tidak
A ) Data calibration for spike thermocouple per year
Ya

Tidak
B ) Quartz tube cleaning per year
Ya

Tidak
C ) 3 zone heating and calibration per year
Ya

Tidak
D ) Wafer boat acid cleaning per year
Ya

Tidak
4. CATALOGUES/BROCHURES Ya

Tidak
I. Vendors must provide the catalogues / brochures / technical specification manuals with the tender proposal
Ya

Tidak
II. Original copies of user and operational manual of the equipment must be provided
Ya

Tidak
5. TRAINING Ya

Tidak
I. Vendors are required to provide training for the use, maintenance and troubleshoot of the equipment to the Technical Staff & Lecture of Electrical Engineering School, College of Engineering, UiTM Shah Alam and all training-related costs are borne by the Vendors.
Ya

Tidak
II. A minimum of three (2) days training for a minimum of five (5) participants covering each module. (Vendors must provide details/syllabus of the training module)
Ya

Tidak
III. Complete training materials and documentation must be provided to all participants
Ya

Tidak
IV. The training MUST be conducted by trainers who are certified by principal. Please attach the trainer's certification that is certified by principal Vendors.
Ya

Tidak
V. Training certificates must be provided by the Vendors.
Ya

Tidak
6. WARRANTY AND SUPPORT Ya

Tidak
I. Vendors must have local service for repair services and provide on call services when required by UiTM
Ya

Tidak
II. Vendors must provide details of warranty. INCLUDING ALL parts, labour, basic phone support for hardware issue, repairs onsite). Please attach the Letter of Warranty (LOW) from the principle, which states that UiTM is entitled at least 3 years of warranty upon project completion.
Ya

Tidak
III. Vendors be responsible for the installation, commissioning and test-run of the equipment and accompanying software (if applicable) to the satisfaction of UNIVERSITI TEKNOLOGI MARA before final acceptance.
Ya

Tidak
IV. All cost on delivery. installation, commissioning, test run and training shall be borne by the vendors.
Ya

Tidak
V. The vendors MUST provide a genuine product. The vendors must be supported back-to-back by a principle (manufacturer) to provide maintenance services for equipment supplied. The vendors should attach a Letter of Authorization (LOA) from Distributors/ Principal.
Ya

Tidak
VI. Free support through fax, email, telephone must be provided during the warranty period
Ya

Tidak
7. OTHER REQUIREMENTS Ya

Tidak
I. Note that all other related material, components and cabling, which are required to ensure full operation of the above package must be supplied and borne by vendors.
Ya

Tidak